Solenex Llc v. Jewell et alMOTION for Summary JudgmentD.D.C.September 12, 2016 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA SOLENEX LLC, Plaintiff, v. SALLY JEWELL, et al., Defendants. ) ) ) ) ) ) ) ) ) ) ) Civil Case No. 13-00993 (RJL) PLAINTIFF’S MOTION FOR SUMMARY JUDGMENT (ORAL ARGUMENT REQUESTED) Plaintiff, Solenex, LLC, by and through its undersigned counsel, hereby moves, pursuant to Federal Rule of Civil Procedure 56, for summary judgment on its claims that the Secretary’s decision to cancel Solenex’s 33-year-old lease and to disapprove Solenex’s 23-year-old approved Application for Permit to Drill should be held unlawful and set aside. Support for this Motion is contained in Statement of Material Facts in Support of Plaintiff’s Motion for Summary Judgment and Memorandum of Points and Authorities in Support of Plaintiff’s Motion for Summary Judgment, both of which are filed concurrently herewith. DATED this 12th day of September 2016. Respectfully submitted, /s/ Steven J. Lechner Steven J. Lechner, D.D.C. Bar No. AZ 0001 MOUNTAIN STATES LEGAL FOUNDATION 2596 South Lewis Way Lakewood, Colorado 80227 (303) 292-2021 lechner@mountainstateslegal.com Attorney for Plaintiff Case 1:13-cv-00993-RJL Document 89 Filed 09/12/16 Page 1 of 2 2 CERTIFICATE OF SERVICE I hereby certify that on September 12, 2016, I electronically filed the foregoing using this Court’s CM/ECF system. I certify that all participants in this case are registered CM/ECF users and service will be accomplished by this Court’s CM/ECF system. /s/ Steven J. Lechner Steven J. Lechner Case 1:13-cv-00993-RJL Document 89 Filed 09/12/16 Page 2 of 2 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA SOLENEX LLC, Plaintiff, v. SALLY JEWELL, et al., Defendants. ) ) ) ) ) ) ) ) ) ) ) Civil Case No. 13-00993 (RJL) MEMORANDUM OF POINTS AND AUTHORITIES IN SUPPORT OF PLAINTIFF’S MOTION FOR SUMMARY JUDGMENT Steven J. Lechner, D.D.C. Bar No. AZ 0001 MOUNTAIN STATES LEGAL FOUNDATION 2596 South Lewis Way Lakewood, Colorado 80227 (303) 292-2021 lechner@mountainstateslegal.com Attorney for Plaintiff Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 1 of 65 ii TABLE OF CONTENTS Page TABLE OF AUTHORITIES ......................................................................................... iv GLOSSARY ................................................................................................................... xiv INTRODUCTION ......................................................................................................... 1 BACKGROUND ........................................................................................................... 1 I. LEGAL BACKGROUND ................................................................................ 1 II. FACTUAL BACKGROUND ........................................................................... 3 ARGUMENT ................................................................................................................. 5 I. STANDARD OF REVIEW .............................................................................. 5 II. THE SECRETARY’S CANCELLATION OF THE LEASE WAS ULTRA VIRES.................................................................................................... 7 A. The Secretary Has No Authority To Cancel A Property Interest Once Title Has Vested In A Private Party ............................................ 7 B. Boesche Confirms That The Secretary Lacked Authority To Cancel Solenex’s Lease ........................................................................ 14 III. THE SECRETARY’S CANCELLATION OF THE LEASE WAS UNLAWFUL BECAUSE SOLENEX IS ENTITLED TO BONA FIDE PURCHASER PROTECTION ......................................................................... 19 IV. THE SECRETARY’S CANCELLATION OF THE LEASE WAS BARRED BY THE PASSAGE OF TIME ....................................................... 24 V. THE SECRETARY IS ESTOPPED FROM ASSERTING THAT THE LEASE WAS IMPROPERLY ISSUED AFTER REPEATEDLY REPRESENTING THAT THE LEASE WAS VALID AND PROPERLY ISSUED FOR MORE THAN 33 YEARS .................................. 26 VI. CONTRARY TO THE SECRETARY’S NEW POSITION, THE LEASE WAS PROPERLY ISSUED. ............................................................... 29 A. There Were No NEPA Violations In The Issuance Of The Lease ...... 29 B. There Were No NHPA Violations In The Issuance Of The Lease ...... 38 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 2 of 65 iii VII. THE SECRETARY’S CANCELLATION OF THE LEASE WAS ARBITRARY AND CAPRICIOUS ................................................................. 40 VIII. THE SECRETARY’S DISAPPROVAL OF THE APPROVED APD WAS ARBITRARY AND CAPRICIOUS ....................................................... 43 CONCLUSION .......................................................................................................... 44 CERTIFICATE OF SERVICE .................................................................................. 45 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 3 of 65 iv TABLE OF AUTHORITIES (* denotes cases primarily relied upon) Page Cases 3M Co. (Minn. Min. & Mfg.) v. Browner, 17 F.3d 1453 (D.C. Cir. 1994) .............................................................................. 25 Am. Trucking Ass’ns v. Frisco Transp. Co., 358 U.S. 133 (1958) .......................................................................................... 36 Ass’n of Data Processing Serv. Orgs. v. Bd. of Governors, 745 F.2d 677 (D.C. Cir. 1984) .......................................................................... 6, 41 Baltimore Gas and Elec. Co. v. NRDC, 462 U.S. 87 (1983) ................................................................................................ 29 Bell Oil & Gas Co. v. Wilbur, 50 F.2d 1070 (D.C. Cir. 1931) .......................................................................... 11 Bob Marshall All. v. Hodel, 852 F.2d 1223 (9th Cir. 1988) .............................................................................. 31, 33, 34, 40 Bob Marshall All. v. Lujan, 804 F. Supp. 1292 (D. Mont. 1992) .................................................................. 40 *Boesche v. Udall, 373 U.S. 472 (1963) .............................................................................................. 7, 14, 15, 17, 18 Bookman v. U.S., 453 F.2d 1263 (Ct. Cl. 1972) ............................................................................ 36 Bordenkircher v. Hayes, 434 U.S. 357 (1978) .............................................................................................. 25 Bowman Transp., Inc. v. Arkansas-Best Freight Sys., Inc., 419 U.S. 281 (1974) .......................................................................................... 6 Cal. Co. v. Udall, 296 F.2d 384 (D.C. Cir. 1961) .......................................................................... 42 Cal. v. Norton, 311 F.3d 1162 (9th Cir. 2002) .......................................................................... 42 Cal. ex rel. Cal. Coastal Comm’n v. Norton, 150 F. Supp. 2d 1046 (N.D. Cal. 2001) ............................................................ 42 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 4 of 65 v Citizens to Pres. Overton Park, Inc. v. Volpe, 401 U.S. 402 (1971) .......................................................................................... 5, 6 Clearfield Trust Co. v. U.S., 318 U.S. 363 (1943) .............................................................................................. 25 Colo. Coal & Iron Co. v. U.S., 123 U.S. 307 (1887) .......................................................................................... 19 Conner v. Burford, 848 F.2d 1441 (9th Cir. 1988) .............................................................................. 30, 31, 35, 40, 41 Consarc Corp. v. U.S. Treasury Dep’t, 71 F.3d 909 (D.C. Cir. 1995) ............................................................................ 42 Costello v. U. S., 365 U.S. 265 (1961) .............................................................................................. 26 Del-Rio Drilling Programs, Inc. v. U.S., 46 Fed. Cl. 683 (2000) .......................................................................................... 17 Dickerson v. Colgrove, 100 U.S. 578 (1879) .............................................................................................. 27 FEC v. Nat’l Republican Senatorial Comm., 877 F. Supp. 15 (D.D.C. 1995) ............................................................................. 24–25 Flint Ridge Dev. Co. v. Scenic Rivers Ass’n, 426 U.S. 776 (1976) .............................................................................................. 30 Geosearch, Inc. v. Andrus, 508 F. Supp. 839 (D. Wyo. 1981) ..................................................................... 43 Geosearch, Inc. v. Watt, 721 F.2d 694 (10th Cir. 1983) .............................................................................. 21 Gratehouse v. U.S., 512 F.2d 1104 (Ct. Cl. 1975) ............................................................................ 36 Hammond v. Norton, 370 F. Supp. 2d 226 (D.D.C. 2005) .................................................................. 33 Harvey v. Udall, 384 F.2d 883 (10th Cir. 1967) .............................................................................. 2 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 5 of 65 vi Heckler v. Cmty. Health Servs. of Crawford Cnty., Inc., 467 U.S. 51 (1984) ................................................................................................ 27 Iceland S.S. Co. v. U.S. Dep’t of the Army, 201 F.3d 451 (D.C. Cir. 2000) .......................................................................... 36 Ill. Commerce Comm’n v. ICC, 848 F.2d 1246 (D.C. Cir. 1988) ........................................................................ 39 Jama v. ICE, 543 U.S. 335 (2005) .......................................................................................... 11 La. Pub. Serv. Comm’n v. FCC, 476 U.S. 355 (1986) .......................................................................................... 6 Lownsdale v. Portland, 15 F. Cas. 1036 (D. Or. 1861) .............................................................................. 2 Lykins v. McGrath, 184 U.S. 169 (1902) .............................................................................................. 22 Lyng v. Nw. Indian Cemetery Protective Ass’n, 485 U.S. 439 (1988) .......................................................................................... 42 Manhattan Gen. Equip. Co. v. Comm’r of Internal Revenue, 297 U.S. 129 (1936) .......................................................................................... 18 McKay v. Wahlenmaier, 226 F.2d 35 (D.C. Cir. 1955) ............................................................................ 13, 14 Mich. v. EPA, 268 F.3d 1075 (D.C. Cir. 2001) ............................................................................ 6 Mobil Oil Expl. & Producing Se., Inc. v. U.S., 530 U.S. 604 (2000) .............................................................................................. 2 *Moore v. Robbins, 96 U.S. 530 (1877) ................................................................................................ 8 Morris Commc’ns, Inc. v. FCC, 566 F.3d 184 (D.C. Cir. 2009) .......................................................................... 29 Motor Vehicle Mfrs. Ass’n of U.S. v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29 (1983) ............................................................................................ 7, 23 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 6 of 65 vii MSLF v. Andrus, 499 F. Supp. 383 (D. Wyo. 1980) ..................................................................... 33 Nat’l Indian Youth Council v. Andrus, 501 F. Supp. 649 (D.N.M. 1980) .......................................................................... 39 Nat’l Indian Youth Council v. Watt, 664 F.2d 220 (10th Cir. 1981) .............................................................................. 39 Nat’l Trust for Historic Pres. v. Blanck, 938 F. Supp. 908 (D.D.C. 1996) ....................................................................... 38–39 Nat’l Trust for Historic Pres. v. Blanck, 203 F.3d 53 (D.C. Cir. 1999) ............................................................................ 39 Nevada v. Dep’t of Energy, 457 F.3d 78 (D.C. Cir. 2006) ............................................................................ 30, 40 N.H. v. Maine, 532 U.S. 742 (2001) .......................................................................................... 28 New York v. NRC, 681 F.3d 471 (D.C. Cir. 2012) .............................................................................. 30 *Noble v. Union River Logging R. Co., 147 U.S. 165 (1893) .............................................................................................. 8, 9 Oglala Sioux Tribe v. U.S. Army Corps of Eng’rs, 537 F. Supp. 2d 161 (D.D.C. 2008) .................................................................. 38 *Pan Am. Petroleum Corp. v. Pierson, 284 F.2d 649 (10th Cir. 1960) .............................................................................. 3, 13, 14, 19 *Park County Res. Council, Inc. v. U.S. Dep’t of Agric., 817 F.2d 609 (10th Cir. 1987) .............................................................................. 31 Patterson v. Hewitt, 195 U.S. 309 (1904) .............................................................................................. 26 Pierce v. SEC, 786 F.3d 1027 (D.C. Cir. 2015) ........................................................................ 29 Powell v. Zuckert, 366 F.2d 634 (D.C. Cir. 1966) .............................................................................. 25 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 7 of 65 viii Power Reactor Dev. Co. v. Int’l Union of Elec., Radio & Mach. Workers, 367 U.S. 396 (1961) .......................................................................................... 11 Robertson v. Methow Valley Citizens Council, 490 U.S. 332 (1989) .............................................................................................. 30 S. Utah Wilderness All. v. U.S. Dep’t of Interior, No. 2:06-CV-342-DAK, 2007 WL 2220525 (D. Utah 2007) ........................... 40–41 Seaton v. Texas Company, 256 F.2d 718 (D.C. Cir. 1958) .......................................................................... 13, 14 Shaw v. Kellogg, 170 U.S. 312 (1898) .............................................................................................. 9 Sierra Club v. Peterson, 717 F.2d 1409 (D.C. Cir. 1983) ............................................................................ 31 Smiley v. Citibank (S. Dakota), N.A., 517 U.S. 735 (1996) .......................................................................................... 35 Spiller v. White, 352 F.3d 235 (5th Cir. 2003) ............................................................................ 32 Stockley v. U.S., 260 U.S. 532 (1923) .......................................................................................... 41 Sw. Petroleum Corp. v. Udall, 361 F.2d 650 (10th Cir. 1966) .......................................................................... 20, 23 Tex. Oil & Gas Corp. v. Watt, 683 F.2d 427 (D.C. Cir. 1982) .......................................................................... 35 TOMAC, Taxpayers of Mich. Against Casinos v. Norton, 433 F.3d 852 (D.C. Cir. 2006) .......................................................................... 33 Union Oil Co. of Cal. v. Smith, 249 U.S. 337 (1919) .......................................................................................... 2 U.S. v. 162.20 Acres of Land, More or Less, Etc., 639 F.2d 299 (5th Cir. 1981) ............................................................................ 39 U.S. v. Burlington & M.R.R. Co., 98 U.S. 334 (1878) ............................................................................................ 19 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 8 of 65 ix U.S. v. Eaton Shale Co., 433 F. Supp. 1256 (D. Colo. 1977) ...................................................................... 28 U.S. v. Georgia-Pacific Co., 421 F.2d 92 (9th Cir. 1970) .................................................................................. 27 U.S. v. Jenks, 129 F.3d 1348 (10th Cir. 1997) ........................................................................ 28 U.S. v. One 1936 Model Ford V–8 De Luxe Coach, 307 U.S. 219 (1939) .......................................................................................... 2 U.S. v. Parcel of Land, Bldgs., Appurtenances & Improvements, Known as 92 Buena Vista Ave., Rumson, N.J., 507 U.S. 111 (1993) .............................................................................................. 21 U.S. v. Seatrain Lines, 329 U.S. 424 (1947) .......................................................................................... 36 *U.S. v. Stone, 69 U.S. 525 (1864) ................................................................................................ 7, 8 Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519 (1978) .............................................................................................. 30 Waskey v. Chambers, 224 U.S. 564 (1912) .............................................................................................. 21 West v. Standard Oil Co., 278 U.S. 200 (1929) .......................................................................................... 11 Wilkinson v. Leland, 27 U.S. 627 (1829) ................................................................................................ 2 Wilson v. Block, 708 F.2d 735 (D.C. Cir. 1983) .......................................................................... 40 Winkler v. Andrus, 614 F.2d 707 (10th Cir. 1980) .............................................................................. 22, 23 Witbeck v. Hardeman, 51 F.2d 450 (5th Cir. 1931) .............................................................................. 25 Witbeck v. Hardeman, 286 U.S. 444 (1932) .......................................................................................... 25 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 9 of 65 x Administrative Decisions Clayton W. Williams, Jr., 103 IBLA 192 (1988)........................................................................................ 18 Floyd Higgins, 147 IBLA 343 (1999) ........................................................................................... 26, 27, 28–29 Glacier–Two Medicine All., 88 IBLA 133 (1985).......................................................................................... 23, 34 Home Petroleum Corp., 54 IBLA 194 (1981).............................................................................................. 21 J. Penrod Toles, 68 Interior Dec. 285 (1961) .............................................................................. 20 *The Melish Consol. Placer Oil Mining Co. v. Testerman, 53 Interior Dec. 205 (1930) .............................................................................. 11, 12 Constitutional Provisions U.S. Const. amend I .................................................................................................... 41–42 U.S. Const. amend V ................................................................................................... 25 Statutes 29 Stat. 526 (1897) .................................................................................................. 2 41 Stat. 437 (1920) .................................................................................................. 1, 10 49 Stat. 674 (1935) .................................................................................................. 9, 12 Pub. L. No. 86-294, 73 Stat. 571 (1959) .................................................................... 19 Pub. L. No. 86-705, 74 Stat. 781 (1960) .................................................................... 19 Pub. L. No. 102-575, 106 Stat. 4600 (1992) ........................................................... 38 Pub. L. No. 109-432, 120 Stat. 2922 (2006) ........................................................... 41 Administrative Procedure Act, 5 U.S.C. § 551 et seq. ........................................... 1, 5, 43 5 U.S.C. § 551(8) .............................................................................................. 43 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 10 of 65 xi 5 U.S.C. § 558(c) .............................................................................................. 43 5 U.S.C. § 706 ................................................................................................... 40 5 U.S.C. § 706(2) .............................................................................................. 6 5 U.S.C. § 706(2)(A)......................................................................................... 6 5 U.S.C. §§ 706(2)(A)–(F) ................................................................................ 5 5 U.S.C. § 706(2)(C) ......................................................................................... 6 28 U.S.C. § 2462 ......................................................................................................... 24, 25 The Mineral Leasing Act of 1920, 30 U.S.C. §§ 181–287 ........................................ passim 30 U.S.C. § 181 ..................................................................................................... 2 30 U.S.C. § 184 ..................................................................................................... 19 30 U.S.C. § 184(h)(1) ....................................................................................... 10 30 U.S.C. § 184(h)(2) ....................................................................................... 20 30 U.S.C. § 184(i) ................................................................................................. 20 30 U.S.C. § 187a ................................................................................................... 21 30 U.S.C. § 188(a) ............................................................................................ 10, 15, 25 30 U.S.C. § 188(b) ............................................................................................ 12, 15 30 U.S.C. § 209 ................................................................................................. 23 30 U.S.C. § 226(a) ................................................................................................ 2 30 U.S.C. § 226(b)(1)(A) ...................................................................................... 2 30 U.S.C. § 226-2 ............................................................................................. 24 The Mining Law, 30 U.S.C. § 22 et seq. ................................................................ 2 The American Indian Religious Freedom Act, 42 U.S.C. § 1996 .......................... 40 The National Environmental Policy Act, 42 U.S.C. § 4331 et seq. ........................... passim Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 11 of 65 xii 42 U.S.C. § 4331(a) .......................................................................................... 42 42 U.S.C. § 4332 ................................................................................................... 30 42 U.S.C. § 4332(C) ......................................................................................... 30, 42 42 U.S.C. § 4332(C)(v) ..................................................................................... 31, 42 The Energy Security Act of 1980, 42 U.S.C. § 8855 .............................................. 33 The General Railroad Right-of-Way Act of 187, 43 U.S.C. §§ 934–39 ................... 9 43 U.S.C. § 1166 ......................................................................................................... 25 The National Historic Preservation Act, 54 U.S.C. § 300101 et seq. ........................ 29, 38, 39, 40 54 U.S.C. § 300308 ............................................................................................... 38 54 U.S.C. § 306108 ............................................................................................... 38 Regulations 40 C.F.R. § 1501.3 .................................................................................................. 30 40 C.F.R. § 1501.4(b) ............................................................................................. 30 40 C.F.R. § 1501.4(c).............................................................................................. 30 40 C.F.R. § 1501.4(e).............................................................................................. 30 40 C.F.R. § 1508.9 .................................................................................................. 30 43 C.F.R. § 3101.1–2 .................................................................................................. 2 43 C.F.R. § 3108.3(d) ............................................................................................. 18 43 C.F.R. § 3108.4 .................................................................................................. 20 43 C.F.R. § 3162.3-1(h)(2) ..................................................................................... 43 Legislative History H.R. Rep. No. 65-563 (January 3, 1916) ................................................................ 11 H.R. Rep. No. 86-1062, reprinted in 1959 U.S.C.C.A.N. 2620 ................................ 19 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 12 of 65 xiii S. Rep. No. 86-1549, reprinted at 1960 U.S.C.C.A.N. 3313 ................................. 24 58 Cong. Rec. 4168 (Aug. 22, 1919) ...................................................................... 11 58 Cong Rec. 7604 (Oct. 27, 1919) ........................................................................ 11 Other Authorities 2 Summers Oil and Gas § 12:14 (3d ed., Nov. 2015) ................................................ 22 65 Fed. Reg. 77,698 (Dec. 12, 2000) ...................................................................... 38 81 Fed. Reg. 51,936 (Aug. 5, 2016)........................................................................ 42 Blair, The Cancellation of Oil and Gas Leases: An Administrative or Judicial Function? 51 Geo. L.J. 221 (1963) ........................................................... 12, 13 Brief for Respondent, Boesche v. Udall, 1963 WL 105567 (Feb. 6, 1963) .............. 15, 16, 17 Nelson, Takings Law West of The Pecos: Inverse Condemnation of Federal Oil and Gas Lease Rights, 37 Nat. Resources J. 253 (1997) ..................................... 2 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 13 of 65 xiv GLOSSARY AIRFA - American Indian Religious Freedom Act, 42 U.S.C. § 1996 APA - Administrative Procure Act, 5 U.S.C. § 551 et seq. APD - Application for Permit to Drill BFP - Bona Fide Purchaser BLM - Bureau of Land Management Department - U.S. Department of the Interior DN - Decision Notice EA - Environmental Assessment EIS - Environmental Impact Statement FONSI - Finding of No Significant Impact Forest Service - U.S. Forest Service IBLA - Interior Board of Land Appeals MLA - The Mineral Leasing Act of 1920, 30 U.S.C. §§ 181–287 NEPA - The National Environmental Policy Act, 42 U.S.C. § 4331 et seq. NHPA - The National Historic Preservation Act, 54 U.S.C. § 300101 et seq. NSO - No Surface Occupancy PSOF - Statement of Material Facts in Support of Plaintiff’s Motion for Summary Judgment ROD - Record of Decision Secretary - Secretary, U.S. Department of the Interior TCD - Traditional Cultural District Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 14 of 65 1 INTRODUCTION Solenex previously owned a federal oil and gas lease, which was issued to Solenex’s predecessor in 1982. In 2013, Solenex initiated this case in an effort to compel Defendants to lift the suspension of the lease, which had been in place since 1985. On July 27, 2015, this Court ruled that Defendants had unreasonably delayed as a matter of law and ordered Defendants to prepare a schedule for determining whether to lift the suspension on the lease. Dkt. # 52 at 2–3, 5.1 In response, the Secretary of the Interior cancelled the 33-year-old lease on March 17, 2016. Dkt. # 68-1. Pursuant to the APA, Solenex seeks judicial review of the Secretary’s unprecedented and egregious actions. As demonstrated below, Solenex is entitled to summary judgment that the Secretary’s actions were unlawful and must be set aside. First, the Secretary’s actions were ultra vires because the Secretary had no authority to cancel the lease, especially one that was issued in 1982. Second, even if the Secretary had such authority, that authority was unlawfully exercised because Solenex is entitled to bona fide purchaser protection. Third, the Secretary’s actions are barred by the passage of time and equitable estoppel. Finally, contrary to the Secretary’s new position, the lease was not improperly issued in 1982. BACKGROUND I. LEGAL BACKGROUND. The Mineral Leasing Act of 1920 (“MLA”), 41 Stat. 437–51 (1920) (codified, as amended, at 30 U.S.C. §§ 181–287), was the first act that provided for the leasing of the Nation’s 1 All page citations are to the page numbers assigned to the document by this Court’s CM/ECF system. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 15 of 65 2 oil and gas resources.2 The specific purpose of the MLA is “to promote the orderly development of the oil and gas deposits in the publicly owned lands of the United States through private enterprise.” Harvey v. Udall, 384 F.2d 883, 885 (10th Cir. 1967) (quotation omitted) (emphasis added). To accomplish this purpose, the MLA vests the Secretary, acting through the BLM, with the authority to issue leases covering oil and gas deposits “and lands containing such deposits owned by the United States, including those in national forests ….” 30 U.S.C. §§ 181, 226(a). A lease grants the lessee, inter alia, the “exclusive right” to drill for, mine, extract, remove, and dispose of all the oil and gas in the leased lands. See 43 C.F.R. § 3101.1–2. This exclusive right is conditioned upon the payment of a royalty to the United States. 30 U.S.C. § 226(b)(1)(A). A federal oil and gas lease is both a conveyance of an interest in land and a contract. See Nelson, Takings Law West of The Pecos: Inverse Condemnation of Federal Oil and Gas Lease Rights, 37 Nat. Resources J. 253, 258–59 (1997) (federal oil and gas leases “are a unique hybrid of contract and real property rights.”); Mobil Oil Expl. & Producing Se., Inc. v. U.S., 530 U.S. 604, 609 (2000) (federal oil and gas lease is a contract). The sanctity of private property and contracts in this country cannot be questioned. Wilkinson v. Leland, 27 U.S. 627, 657 (1829) (“The fundamental maxims of a free government seem to require, that the rights of personal liberty and private property should be held sacred.”); Lownsdale v. Portland, 15 F. Cas. 1036, 1039 (D. Or. 1861) (“Security and certainty of title to real property are among the most important objects of the law in any civilized community.”); see U.S. v. One 1936 Model Ford V–8 De Luxe Coach, 307 U.S. 219, 226 (1939) (“Forfeitures are not favored; they should be enforced only when within 2 Prior to the MLA, federal lands containing oil and gas were privately acquired through “self- initiation,” pursuant to the Mining Law. 30 U.S.C. § 22 et seq.; see 29 Stat. 526 (1897) (Oil Placer Act). Under the Mining Law, citizens could freely enter upon federal lands to search for oil and gas, and after, inter alia, “discovery,” “location,” and payment of the purchase price, receive a patent conveying fee title to the land and minerals. See Union Oil Co. of Cal. v. Smith, 249 U.S. 337, 344–49 (1919). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 16 of 65 3 both letter and spirit of the law.”). More importantly, security of title in federal oil and gas leases is necessary to fulfill Congress’s purpose in passing the MLA. See Pan Am. Petroleum Corp. v. Pierson, 284 F.2d 649, 655 (10th Cir. 1960) (“Certainty of title is an elementary prerequisite for the sound development of any mineral resource.”). II. FACTUAL BACKGROUND.3 In 1981, the Forest Service, with the approval of the BLM as a cooperating agency, issued a comprehensive, 162-page, environmental assessment (“EA”) for oil and gas leasing on non- wilderness lands administered by the Lewis and Clark National Forest (“1981 EA”). PSOF ¶¶ 1–9. On May 24, 1982, based upon the 1981 EA, the BLM issued the lease to Sidney M. Longwell. Id. ¶¶ 11–21. On June 2, 1983, Mr. Longwell assigned the lease to Fina. Id. ¶ 22. In making this assignment, Mr. Longwell reserved a production payment, which would be paid out of a percentage of the value of the oil and gas produced from the leased lands. Id. ¶ In November 1983, Fina submitted an Application for Permit to Drill (“APD”), to drill a single well on the lease. PSOF ¶¶ 23–26. In January 1985, the Forest Service and the BLM issued a 318-page EA for the APD (“1985 EA”). Id. ¶¶ 27–29. Based on the 1985 EA, the BLM approved the APD. Id. ¶ 30. On appeal, the IBLA upheld the BLM’s actions in approving the APD based upon the 1985 EA, but remanded for further consideration of four issues. Id. ¶¶ 31– 32. 3 Only the essential facts are set forth herein. Filed concurrently herewith is a Statement of Material Facts in Support of Plaintiff’s Motion for Summary Judgment (“PSOF”), which provides a detailed factual history, and supplements the factual history provided at Dkt. # 24-2. The facts are primarily based on the documents from Defendants’ administrative record. See Dkt. # 84. Many of the documents were included in the previously filed appendix. See Dkt. ## 45, 48. To avoid duplication, the previously filed documents will be cited as Dkt. # __ at __. New documents will be cited as A0000:FS000000 (Forest Service), HC00000 (BLM), or a descriptive name will be used. Copies of the new documents will be filed with the Court in an appendix following completion of briefing. See Dkt. # 82. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 17 of 65 4 After remand, Fina requested a temporary suspension of the lease to prevent the primary term of the lease from expiring while the BLM considered the four remanded issues. PSOF ¶ 33. The BLM promptly granted Fina’s request, but then unlawfully kept the lease in suspension for the next 30 years, until the Secretary cancelled the lease in March 2016. PSOF ¶¶ 34, 86–95. In 1987, after addressing the four remanded issues and considering the Forest Service’s new 1986 Forest Plan and accompanying Final Environmental Impact Statement (“1986 FEIS”) , the BLM reactivated the approved APD. PSOF ¶¶ 35–37. Through no fault of Fina, that decision was short lived. PSOF ¶¶ 38–41. Thereafter, the Forest Service and the BLM decided to re-analyze Fina’s APD in conjunction with an APD submitted by Chevron for a nearby lease. PSOF ¶¶ 43–44. This analysis resulted in a comprehensive, 982-page, Final EIS, which was issued in December 1990 (“1990 FEIS”). Id. ¶ 45. Based upon the 1990 FEIS, the BLM approved Fina’s APD in 1991, and once again in 1993. Id. ¶¶ 46–55. This approval was subject to Fina complying with all lease stipulations, mitigation and monitoring requirements, and additional mitigation measures that were imposed as conditions of approval. Id. ¶ 55–59. Importantly, the 1993 Record of Decision (“1993 ROD”) approving the APD was concurred in by the Assistant Secretary, Department of the Interior, which made it a final decision for the Secretary. Id. On June 4, 1993, right before the suspension was to be lifted, the new Secretary suspended the lease for another year. PSOF ¶ 60. Thereafter, one-year suspensions were imposed until the lease was indefinitely suspended in 1998. Id. ¶¶ 61–67. On April 5, 1999, Fina, “fed up with the …endless delay,” assigned the lease back to Mr. Longwell. PSOF ¶ 68. In 2004, Mr. Longwell assigned the lease and concomitant rights under the Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 18 of 65 5 approved APD to Solenex, a Louisiana limited liability corporation Mr. Longwell had recently formed. Id. ¶ 73. Despite persistent efforts by Solenex to exercise its valuable lease rights over the next nine years, the lease remained in suspension. See PSOF ¶¶ 74–78. As a result, in June 2013, Solenex initiated this case seeking to compel agency action “unreasonably delayed.” Dkt. # 1. Defendants responded by arguing that this Court was powerless to do anything about their nearly three- decades-long delay. Dkt. # 34-1 at 22–25. In the alternative, Defendants argued that they had not unreasonably delayed in lifting the suspension. Id. at 25–28. On July 27, 2015, this Court ruled that Defendants’ 29-year delay was unreasonable as a matter of law. Dkt. # 52 at 2–3. Following that adverse ruling, Defendants suggested—for the first time—that the lease may have been improperly issued in 1982 and that they may seek to cancel the lease. PSOF ¶¶ 88–91. That new position was formalized on March 17, 2016, when the Secretary issued an unprecedented decision cancelling the 33-year-old lease and disapproving the 23-year-old approved APD. PSOF ¶¶ 94–95; Dkt. # 68-1. ARGUMENT I. STANDARD OF REVIEW. Under the APA, a reviewing court “shall” also “hold unlawful and set aside agency action, findings, and conclusions found” not to satisfy any one of the six listed standards. 5 U.S.C. §§ 706(2)(A)–(F). These standards require the reviewing court to engage in a “substantial inquiry.” Citizens to Pres. Overton Park, Inc. v. Volpe, 401 U.S. 402, 415 (1971) (“Overton Park”). And, although an agency’s decision is generally entitled to a presumption of regularity, “that presumption is not to shield [the agency’s] action from a thorough, probing, in- depth review.” Id. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 19 of 65 6 Two of these standards are of particular relevance in this case. First, the standard of review in 5 U.S.C. § 706(2)(C) is fairly straightforward. Whether an agency has acted “in excess of statutory jurisdiction, authority, or limitations, or short of statutory right” requires a determination of the scope of the authority delegated by Congress to the agency for “an agency literally has no power to act ... unless and until Congress confers power upon it.” La. Pub. Serv. Comm’n v. FCC, 476 U.S. 355, 374 (1986). Once the scope of the agency’s delegated authority is determined, the reviewing court must decide whether the challenged agency action falls within that authority. If the agency acts in excess of its delegated authority, “then its action is plainly contrary to law and cannot stand.” Mich. v. EPA, 268 F.3d 1075, 1081 (D.C. Cir. 2001). Second, the “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law” standard in 5 U.S.C. § 706(2)(A), which is commonly referred to as the “arbitrary and capricious” standard, serves as a “catch-all” that “pick[s] up administrative misconduct not covered by the other more specific” standards in 5 U.S.C. § 706(2). Ass’n of Data Processing Serv. Orgs. v. Bd. of Governors, 745 F.2d 677, 683 (D.C. Cir. 1984). Thus, an agency action that is within the agency’s delegated authority may still be held unlawful as arbitrary and capricious. See Overton Park, 401 U.S. at 415–16. In addition, the arbitrary and capricious standard applies to both the factual basis for an agency’s action, Overton Park, 401 U.S. at 416, and the reasoning employed by the agency. Bowman Transp., Inc. v. Arkansas-Best Freight Sys., Inc., 419 U.S. 281, 285–86 (1974). Therefore, “an agency action which is supported by the required substantial evidence may in another regard be ‘arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law’—for example, because it is an abrupt and unexplained departure from agency precedent.” Ass’n of Data Processing, 745 F.2d at 683. In general, agency action is “arbitrary and capricious if the agency has relied on factors which Congress has not intended it to Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 20 of 65 7 consider, entirely failed to consider an important aspect of the problem, offered an explanation for its decision that runs counter to the evidence before the agency, or is so implausible that it could not be ascribed to a difference in view or the product of agency expertise.” Motor Vehicle Mfrs. Ass’n of U.S. v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 (1983) (“State Farm”). II. THE SECRETARY’S CANCELLATION OF THE LEASE WAS ULTRA VIRES. It is undisputed that the Secretary’s actions in administratively cancelling the lease were not based upon any express delegation of authority from Congress. Dkt. # 68-1 at 7. Instead, the Secretary claimed that she had inherent authority to do so based upon her general managerial power over the public lands and the Supreme Court’s decision in Boesche v. Udall, 373 U.S. 472, 474 (1963). Dkt. # 68-1 at 7. As demonstrated below, the Secretary has never had any inherent authority to cancel a property interest after title thereto had been transferred into private ownership, and Boesche did not magically confer such authority on the Secretary. A. The Secretary Has No Authority To Cancel A Property Interest Once Title Has Vested In A Private Party. When Congress began debating a leasing system for oil and gas, it was established that the Secretary had no inherent authority to administratively cancel a property interest after title thereto had been transferred into private ownership through the final actions of the Secretary. Instead, if a private party acquired title to a property interest by mistake or by fraud, the Secretary’s only recourse was to seek a judicial cancellation of that title. One of the earliest pronouncements of this principle occurred in U.S. v. Stone, 69 U.S. 525, 528 (1864), a case initiated by the United States to judicially cancel a patent that was issued by mistake as the lands were not open to patenting. The patentee argued that the patent was unassailable except for fraud in the procurement. Id. at 529– 30. In response, the United States argued that “the appropriate remedy of the United States, to set Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 21 of 65 8 aside and cancel patents issued by her officers, without due legal authority, is by bill in equity.” Id. at 532. In sustaining the United States’ suit to cancel the patent, the Court explained: A patent is the highest evidence of title, and is conclusive as against the Government, and all claiming under junior patents or titles, until it is set aside or annulled by some judicial tribunal…. Nor is fraud in the patentee the only ground upon which a bill will be sustained. Patents are sometimes issued unadvisedly or by mistake, where the officer has no authority in law to grant them, or where another party has a higher equity and should have received the patent. In such cases courts of law will pronounce them void. The patent is but evidence of a grant, and the officer who issues it acts ministerially and not judicially. If he issues a patent for land reserved from sale by law, such patent is void for want of authority. But one officer of the land office is not competent to cancel or annul the act of his predecessor. That is a judicial act, and requires the judgment of a court. Id. at 535 (emphasis added). Thirteen years later, the Court further explained why the Secretary lacked that authority to reverse a final act that had conveyed title to a private party: The functions of [the Executive D]epartment necessarily cease when the title has passed from the government. And the title does so pass in every instance where, under the decisions of the officers having authority in the matter, a conveyance, generally called a patent, has been … delivered to and accepted by the grantee. It is a matter of course that, after this is done, neither the secretary nor any other executive officer can entertain an appeal. He is absolutely without authority. If this were not so, the titles derived from the United States, instead of being the safe and assured evidence of ownership which they are generally supposed to be, would be always subject to the fluctuating, and in many cases unreliable, action of the land- office. No man could buy of the grantee with safety, because he could only convey subject to the right of the officers of the government to annul his title. Moore v. Robbins, 96 U.S. 530, 533–34 (1877) (emphasis added). Following Stone and Moore, the Court consistently applied this principle—not only to fee title, but to lesser property interests. For example, in Noble v. Union River Logging R. Co., 147 U.S. 165, 166–67 (1893), the Secretary sought to disapprove a previously approved map, the approval of which had automatically conferred upon the plaintiff title to an easement for railroad Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 22 of 65 9 purposes under the General Railroad Right-of-Way Act of 1875, 43 U.S.C. §§ 934–39. Id. at 172; The plaintiff sued to enjoin the Secretary from administratively divesting it of its title, arguing that the Secretary’s only recourse was to institute a judicial proceeding for cancellation of the easement. Noble, 147 U.S. at 165. In affirming the lower court’s issuance of the injunction, the Court ruled: The lands over which the right of way was granted were public lands, subject to the operation of the statute; and the question whether the plaintiff was entitled to the benefit of the grant was one which it was competent for the secretary … to decide, and, when decided, and his approval was noted upon the plats ... [t]he railroad company became at once vested with a right of property in these lands, of which they can only be deprived by a [judicial] proceeding taken directly for that purpose. If it were made to appear that the right of way had been obtained by fraud, a bill would doubtless lie by the United States for the cancellation and annulment of an approval thus obtained. A revocation of the approval of the secretary …, however, by his successor in office, was an attempt to deprive the plaintiff of its property without due process of law, and was, therefore, void.... One officer of the land office is not competent to cancel or annul the act of his predecessor. That is a judicial act, and requires the judgment of a court.... Id. at 176–77 (internal citations and quotations omitted) (emphasis added); see also Shaw v. Kellogg, 170 U.S. 312, 341 (1898) (When “the legal title passes, … by whatsoever instrument and in whatsoever manner,” it “passes out of the jurisdiction of the land department. The grant has then been complete, and the only remedy for any wrong in the transfer of such title is through the courts, and not in the land department.”). It was against this legal background that Congress passed the MLA. As originally enacted, nothing in the MLA provided the Secretary with the authority to cancel a lease.4 Instead, as reflected in Section 31 of the MLA, as originally enacted, Congress expressly provided that the Secretary had to institute a judicial proceeding in order to forfeit or cancel a lease. 4 Under the MLA, as originally enacted, lands within a proven area were generally leased on a competitive basis. 41 Stat. at 443. Prospecting permits were issued for lands within unproven areas. 41 Stat. at 441. A prospecting permit gave the permittee exclusive rights to explore the lands and, upon the discovery of a valuable deposit, the permittee was entitled to issuance of a lease. 41 Stat. at 441–42. Prospecting permits for oil and gas were essentially eliminated by Congress in 1935 and replaced with noncompetitive leases. See 49 Stat. 674–79 (1935). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 23 of 65 10 That any lease issued under the provision of this Act may be forfeited and canceled by an appropriate proceeding in the United States district court for the district in which the property … is located whenever the lessee fails to comply with any of the provisions of [the MLA], of the lease, or of the general regulations promulgated under [the MLA] and in force at the date of the lease .... 41 Stat. at 450.5 That intent was also reflected in Section 27 of the MLA, as originally enacted, wherein Congress provided that a judicial proceeding had to be instituted to forfeit any interest in a lease that was owned in excess of the maximum ownership limit. 41 Stat. at 448;6 see id. at 443 (providing that a judicial proceeding had to be instituted to forfeit a lease if the prohibition on drilling within 200 feet of the lease boundary was violated); id. at 449 (providing that a judicial proceeding had to be instituted to forfeit a pipeline right-of-way granted under the MLA). In contrast, Section 26 of the MLA, as originally enacted, did provide authority to the Secretary to cancel a prospecting permit: [T]he Secretary of the Interior shall reserve and may exercise the authority to cancel any prospecting permit upon failure by the permittee to exercise due diligence in the prosecution of the prospecting work in accordance with the terms and conditions stated in the permit, and shall insert in every such permit issued under the [MLA] appropriate provisions for its cancellation by him. 41 Stat. at 448 (emphasis added). That Congress expressly provided that prospecting permits could be administratively cancelled demonstrates that, in passing the MLA, Congress did not 5 This provision, as amended, is now codified at 30 U.S.C. § 188(a), and provides: Except as otherwise herein provided, any lease issued under the provisions of [the MLA] may be forfeited and canceled by an appropriate proceeding in the United States district court for the district in which the property … is located whenever the lessee fails to comply with any of the provisions of [the MLA], of the lease, or of the general regulations promulgated under [the MLA] and in force at the date of the lease .... 6 This provision of Section 27, as amended, is now codified at 30 U.S.C. § 184(h)(1), and still requires a judicial proceeding to cancel or forfeit a lease (or interest therein) held in violation of the MLA. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 24 of 65 11 intend for leases to be administratively cancelled.7 See Jama v. ICE, 543 U.S. 335, 341 (2005) (“We do not lightly assume that Congress has omitted from its adopted text requirements that it nonetheless intends to apply, and our reluctance is even greater when Congress has shown elsewhere … that it knows how to make such a requirement manifest.”). This conclusion was confirmed in 1930, when the Secretary ruled that a “lease once granted [is] beyond recall by the Secretary and is only subject to cancellation in the Federal courts ….”8 The Melish Consol. Placer Oil Mining Co. v. Testerman, 53 Interior Dec. 205, 207 (1930). The Secretary based his ruling on the aforementioned principle that once title vested in a private party through the Secretary’s final actions that title was no longer subject to cancellation by the Secretary. Id. at 207 (citing West v. Standard Oil Co., 278 U.S. 200, 218–19 (1929)). One year after the Secretary’s decision in Melish, the D.C. Circuit reached the same conclusion in Bell Oil & Gas Co. v. Wilbur, 50 F.2d 1070 (D.C. Cir. 1931). In that case, the lessee sought to enjoin the Secretary from cancelling its leases over the lessee’s failure to pay fifteen cents per barrel over the market price for the United States’ royalty oil. Id. at 256–57. The D.C. Circuit affirmed the dismissal of the lessee’s case on the ground that the lessee had an 7 Although resort to the legislative history is unnecessary when the statutory language is so clear, the history confirms that Congress did not intend for the Secretary to cancel leases. H.R. Rep. No. 65-563 at 26 (January 3, 1916, letter from the then-Secretary explaining that requiring judicial forfeiture proceedings “safeguards the interests of the lessee”); 58 Cong. Rec. 4168 (Aug. 22, 1919) (statements by Senators Lenroot and Smoot that a lease can only be cancelled through a judicial proceeding); 58 Cong Rec. 7604 (Oct. 27, 1919) (statement by Representative Sinnott that the “law abhors a forfeiture and there must be a showing made in court before the forfeiture [of a lease] can be secured.”). 8 This interpretation of the MLA is entitled to substantial deference because it “involve[d] a contemporaneous construction of a statute by the men charged with the responsibility of setting its machinery in motion; of making the parts work efficiently and smoothly while they are yet untried and new.” Power Reactor Dev. Co. v. Int’l Union of Elec., Radio & Mach. Workers, 367 U.S. 396, 408 (1961) (quotation omitted). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 25 of 65 12 adequate remedy at law because the Secretary could only cancel the leases through a judicial proceeding: The Secretary, under the terms of the act, has no power by his own fiat to cancel these leases. He is required to go into a District Court of the United States to accomplish that result by a proceeding in equity. In that proceeding, plaintiff can set up as a defense the action of the Secretary in attempting to exact the 15 cents per barrel over and above the market price, and the legality of the Secretary’s action would then be for the determination of the court. Id. at 257 (emphasis added). In 1935, Congress reaffirmed that the Secretary lacked any inherent authority to cancel a lease when it amended the MLA. Recognizing that prospecting permits were not achieving their goal, Congress amended the MLA by phasing out prospecting permits and replacing them with noncompetitive leases, which were issued for lands within unproven areas. 49 Stat. at 674–79. At the same time, Congress conferred upon the Secretary limited authority to cancel a lease after notice for a violation committed by the lessee, so long as the lands covered by the lease were not known to contain valuable deposits of oil or gas.9 49 Stat. at 678. If the Secretary already possessed inherent authority to administratively cancel a lease this amendment would have been largely superfluous. Despite the limited delegation of authority, the Secretary soon reversed his earlier position, as reflected in Melish, and arrogated to himself the authority to cancel non-producing leases. See Blair, The Cancellation of Oil and Gas Leases: An Administrative or Judicial 9 This provision, as amended, is now codified as Section 31(b) of the MLA and provides: Any lease issued after August 21, 1935, under [30 U.S.C. § 226] shall be subject to cancellation by the Secretary … after 30 days notice upon the failure of the lessee to comply with any of the provisions of the lease, unless or until the leasehold contains a well capable of production of oil or gas in paying quantities …. 30 U.S.C. § 188(b). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 26 of 65 13 Function? 51 Geo. L.J. 221, 221–23 (1963). To some, this arrogation of authority was endorsed by the D.C. Circuit in McKay v. Wahlenmaier, 226 F.2d 35, 41–47 (D.C. Cir. 1955), wherein the court, in a 2-1 decision, ordered the Secretary to cancel a lease and issue a new lease to a competing lease applicant. Yet, in so doing, the majority simply suggested that the Secretary had a duty to cancel an improvidently granted lease in an administrative appeal brought by a competing lease applicant. Id. at 42 n.11, 46. A few years later, the D.C. Circuit impliedly suggested that the Secretary may have the inherent authority to cancel a lease when it ruled the Secretary had arbitrarily cancelled a lease. Seaton v. Texas Company, 256 F.2d 718, 720–24 (D.C. Cir. 1958); but see Blair, 51 Geo. L.J. at 241–45 (explaining why Wahlenmaier and Texas Company are weak precedent for the Secretary’s claimed inherent authority to cancel leases). In 1960, the Tenth Circuit, however, emphatically rejected the Secretary’s claimed inherent authority to cancel leases. In Pan Am. Petroleum, a lessee brought suit to enjoin the Secretary from attempting to cancel numerous leases, the issuance of which had been allegedly procured by fraud. 284 F.2d at 651. In reversing the district court’s denial of the injunction, the Tenth Circuit first noted that the Secretary’s claimed inherent authority would defeat the purpose of the MLA: If there may be administrative cancellation of an oil and gas lease for fraud in procurement, the practical operation of the [MLA] is seriously impaired. It is common knowledge that exploration for oil and gas is costly. The drilling of wells requires substantial financial risks and the expense of putting those wells on production and of marketing the product is burdensome. If the continued existence of the granted leasehold estate is dependent upon the fluctuating policies of governmental departments uninhibited by any limitations upon time of action, the value of federal oil and gas leases as a title basis for oil and gas development is greatly diminished if not practically destroyed. No prudent operator would be willing to accept the financial risks if he were subject to ouster because of some administrative decision based upon improper conduct of an assignor occurring at some distant time in the past. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 27 of 65 14 The Secretary … has no powers except those granted or those necessarily implied from granted powers…. The courts have repeatedly held that he is without power to annul a patent once it has issued. That power is reserved to the courts. In the absence of some statutory provision giving him power to annul leases under the [MLA], that power also is reserved to the courts. Otherwise the new system created by the [MLA] for the disposition of the mineral reserves found on the public lands fails of its purpose. Certainty of title is an elementary prerequisite for the sound development of any mineral resource. Id. at 655 (footnotes omitted). The Tenth Circuit then ruled that the Secretary is “without statutory authority, either express or implied, to cancel or annul federal oil and gas leases by administrative proceedings taken after the issuance of such leases and because of any conduct of a lessee which preceded such issuance ….” Id. at 656; see id. at 656–57 (rejecting the Secretary’s reliance on Wahlenmaier and Texas Company). As the foregoing demonstrates, except for an implied suggestion in Texas Company, it was largely recognized that the Secretary lacked any inherent authority to cancel a lease after title became vested in a lessee. B. Boesche Confirms That The Secretary Lacked Authority To Cancel Solenex’s Lease. Contrary to the Secretary’s position, the Supreme Court’s decision in Boesche did not magically confer authority on the Secretary to cancel a lease for alleged mistakes made by the BLM decades earlier. In Boesche, the petitioner had applied for an 80-acre noncompetitive lease, but neglected to include in his lease application an adjoining 40-acre tract that was available for leasing. 373 U.S. at 474. Following issuance of the lease to the petitioner, two competing lease applicants administratively appealed the rejection of their application on the ground that the petitioner’s lease application violated an MLA regulation that provided no offer for a noncompetitive lease may be made for less than 640 acres, except where the lands covered by the application are surrounded by lands not available for leasing. Id. at 473–74. In deciding the Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 28 of 65 15 administrative appeal, the Secretary ruled that the petitioner’s lease should be cancelled and a lease issued to the competing applicants. Id. at 474. After the Secretary’s decision was affirmed upon judicial review, the Court granted certiorari on the narrow issue of whether the Secretary may cancel an improperly issued lease in an administrative appeal brought by a competing lease applicant. Id. at 473 (“The question presented in this case is whether the Secretary … has authority to cancel in an administrative proceeding a lease … issued under the [MLA], in circumstances where such lease was granted in violation of the Act and regulations promulgated thereunder.”); see Brief for Respondent, Boesche v. Udall, 1963 WL 105567, at *2 (Feb. 6, 1963) (Framing the question presented as: “Whether the Secretary … has authority to cancel an oil and gas lease issued in violation of the Department’s regulations and in derogation of a competing applicant’s statutory preference rights.” (emphasis added)). The petitioner argued that Section 31(b) of the MLA, 30 U.S.C. § 188(b), provides the exclusive means by which the Secretary may cancel a lease. Boesche, 373 U.S. at 475. Specifically, the petitioner argued that the Secretary may only cancel a lease if the lessee violates the terms of the lease and then only so long as the lands covered by the lease have not been determined to contain valuable deposits of oil and gas. Id. at 475. Because the petitioner had not violated the terms of the lease, but, at most, had merely violated an MLA regulation prior to lease issuance, the petitioner argued that the Secretary’s sole remedy was to institute a judicial proceeding for lease cancellation pursuant to 30 U.S.C. § 188(a). Id. at 475–76. In contrast, the Secretary argued that the provisions in Section 31(a) and (b) of the MLA, 30 U.S.C. §§ 188(a), (b), address only the authority to forfeit or cancel leases for violations occurring after lease issuance. Boesche, 373 U.S. at 476. The Secretary further argued that he has inherent authority to cancel leases for a pre-lease violation of the MLA and/or the regulations Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 29 of 65 16 promulgated thereunder when the rights of competing lease applicants are at stake. Brief for Respondent, Boesche v. Udall, 1963 WL 105567, at *6–7 (arguing that the claimed inherent authority “is essential both to protect the public interest and also to assure other applic[ants] the benefit of their statutory rights”); id. at *36 (“the existence of some power of cancellation, at least while timely conflicting applications are pending, is essential to secure the rights of competing applicants”). The Secretary also stressed the limited nature of his claimed inherent authority: It must be emphasized that the authority, [sic] claimed is no broader than the necessities of practical administration. The Secretary claims no broad power to cancel any mineral lease for any cause.... The Secretary affirms only his responsibility to rescind leases erroneously granted, whether the error was fraudulently induced or resulted from inadvertence by his own subordinates. The claim, in short, is restricted to the correction of errors which affect the initial validity of the lease. Furthermore, for the purposes of this case …, it is necessary to establish only that a lease issued on a defective application can be cancelled by the Secretary upon the timely appeal of a competing applicant taken from the denial of his application. Id. at *14 (italics in original, underlined added). Importantly, the Secretary also promised that the claimed authority would not be abused. Id. at *18 (“Recognition of the power ... does not license administrative abuses.”); id. at *36–37 (“[I]n practice the Secretary has not used his [inherent] power to cancel where the irregularity is minor unless necessary, as in the present case, to prevent prejudice to a competing applicant whose application was on file before the lease was erroneously issued.” (emphasis added)). In sustaining the Secretary’s actions, the Court issued a very narrow holding that it felt was necessary to protect the rights of competing lease applicants: [T]he power of cancellation, at least while conflicting applications are pending, is essential to secure the rights of competing applicants. We sanction no broader rule that is called for by the exigencies of the general situation and the circumstances of this particular case. We hold only that the Secretary has the power to correct administrative errors of the sort involved here by Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 30 of 65 17 cancellation of leases in proceedings timely instituted by competing applicants for the same land. In so holding we do not open the door to administrative abuses. Boesche, 373 U.S. at 485–86 (all emphasis added) (footnote omitted). This holding proves that the Secretary’s cancellation of Solenex’s lease was ultra vires.10 First, the petitioner in Boesche had submitted an application that violated an MLA regulation. 373 U.S. at 473–74. There is no suggestion that Solenex or its predecessors violated the MLA or the regulations promulgated thereunder either prior to or after lease issuance. Instead, the purported mistakes were made by the Secretary’s own subordinates. Dkt. # 68-1 at 8–12. It is one thing for the Secretary to cancel a lease issued to one who violated the MLA; it quite another thing for the Secretary to cancel a lease because of purported mistakes made by a subordinate. In short, the Secretary should not be able punish Solenex for purported mistakes made by the Secretary’s subordinate decades ago. Cf. Del-Rio Drilling Programs, Inc. v. U.S., 46 Fed. Cl. 683, 689 (2000) (The government is asking this court “to punish plaintiffs for the government’s failure to abide by its own record keeping requirements; we see no legal or equitable reason to do so.”). 10 This holding is consistent with the Court’s earlier opinions upholding the authority of the Secretary to correct mistakes of subordinates before legal title had passed into private ownership. See Boesche, 373 U.S. at 477 (listing cases). As the Secretary noted in arguing the limited nature of his claimed authority, the existing regulations provided that a competing lease applicant had 30 days to appeal an adverse decision, which appeal could ultimately be heard by the Secretary. Brief for Respondent, Boesche v. Udall, 1963 WL 105567, at *37–38. Thus, only after all appeals were exhausted “was the administrative action in any sense final.” Id. at *38. Therefore, in light of these appeal procedures, the Secretary argued that legal title does not truly pass until all administrative appeals are exhausted because until then the successful applicant would be on notice that the award of the lease was still tentative. Id. at *38–40; see also id. at *41 (“[T]he cancellation in this case should be upheld as appellate action taken before the decision to award the lease to petitioner had become ‘final’ under the departmental practice pursuant to published regulations.” (emphasis in original)). In contrast, the Department’s actions in issuing Solenex’s lease had been final for more than 33 years! Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 31 of 65 18 Second, there were competing lease applicants in Boesche who were prejudiced by the issuance of a lease based upon an unlawful application. 373 U.S. at 473–74. It is undisputed that there are no competing lease applicants and no administrative appeals regarding issuance of Solenex’s lease. See Dkt. # 45-4 at 13. Because the Secretary has no competing lease applicants to protect, Boesche provides no support for the Secretary’s actions in this case. Boesche, 373 U.S. at 485 (“We hold only that the Secretary has the power to correct administrative errors of the sort involved here by cancellation of leases in proceedings timely instituted by competing applicants for the same land.”). Therefore, contrary to the Secretary’s argument, Boesche does not stand for the proposition that the Secretary had the inherent authority to cancel Solenex’s lease. Instead, Boesche proves that the Secretary’s actions were ultra vires. See Dkt. # 45-6 at 22 (Secretary recognizing the lack of authority to cancel the lease in 1993); 1990 FEIS Chapter II at 11–14, 37 (BLM recognizing the lack of authority to cancel the lease). This is especially true because the Secretary’s cancellation of a 33-year-old lease is an egregious abuse of any inherent authority the Secretary may possess.11 See Boesche, 373 U.S. at 485 (“In so holding we do not open the door to administrative abuses.”). Accordingly, this Court should hold unlawful and set aside the Secretary’s decision. 11 No agency may bestow authority upon itself by promulgating a regulation. See Manhattan Gen. Equip. Co. v. Comm’r of Internal Revenue, 297 U.S. 129, 134–35 (1936) (a regulation that exceeds an agency’s delegated authority is a “nullity”). Therefore, to the extent that the Secretary’s decision was based upon 43 C.F.R. § 3108.3(d), which provides that “[l]eases shall be subject to cancellation if improperly issued[,]” her decision was still ultra vires because the regulation is unlawful as applied in this case. Similarly, a decision by a subordinate agency may not bestow more authority on the Secretary than that delegated by Congress. Therefore, to the extent that the Secretary’s decision was based on Clayton W. Williams, Jr., 103 IBLA 192 (1988), her decision was still ultra vires. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 32 of 65 19 III. THE SECRETARY’S CANCELLATION OF THE LEASE WAS UNLAWFUL BECAUSE SOLENEX IS ENTITLED TO BONA FIDE PURCHASER PROTECTION. Even if the Secretary had the inherent authority to cancel Solenex’s lease, the Secretary’s actions were unlawful because Solenex is entitled to bona fide purchaser (“BFP”) protection. In 1959, the Secretary initiated proceedings to cancel hundreds of leases that were held by the original lessees and their assignees. See H.R. Rep. No. 86-1062, reprinted in 1959 U.S.C.C.A.N. 2620, 2621. The asserted basis for these proceedings was that the original lessees of the challenged leases had fraudulently acquired their leases in furtherance of a scheme to evade the acreage limitations in the MLA. See generally Pan Am. Petroleum Corp., 284 F.2d at 651 (describing aspects of the purported scheme). In response to the Secretary’s actions, Congress quickly passed emergency legislation to protect the interests of the assignees. Pub. L. No. 86-294, 73 Stat. 571–72 (1959). Specifically, Congress amended Section 27 of the MLA, 30 U.S.C. § 184, to provide statutory protection for BFPs from the Secretary’s massive cancellation attempt.12 73 Stat. at 572; see H.R. Rep. No. 86-1062, reprinted in 1959 U.S.C.C.A.N. 2620, 2621 (explaining that the amendment to Section 27 of the MLA would remove the cloud placed on the titles of BFPs by the Secretary’s action and encourage investment in developing the Nation’s oil and gas resources). One year later, Congress further strengthened the BFP protection in Section 27 of the MLA. Pub. L. No. 86-705, § 3, 74 Stat. 781, 785–89 (1960). As amended, Section 27(h)(2) now provides: 12 This amendment may have been a “belt and suspenders” approach because the Supreme Court had long recognized that neither the Secretary nor the judiciary could cancel a previously conveyed property interest after that property interest had been transferred to a BFP. See, e.g., Colo. Coal & Iron Co. v. U.S., 123 U.S. 307, 313–14 (1887) (a fraudulently obtained patent cannot be attacked by the United States after it has been transferred to a BFP); U.S. v. Burlington & M.R.R. Co., 98 U.S. 334, 342 (1878) (noting that the United States “certainly could not insist upon [the] cancellation of … patents so as to affect innocent purchasers”). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 33 of 65 20 The right to cancel or forfeit for violation of any of the provisions of [the MLA] shall not apply so as to affect adversely the title or interest of a bona fide purchaser of any lease …, which lease … was acquired and is held by a qualified person, association, or corporation in conformity with those provisions, even though the holdings of the person, association, or corporation from which the lease … was acquired, or of his predecessor in title (including the original lessee of the United States) may have been canceled or forfeited or may be or may have been subject to cancellation or forfeiture for any such violation. 30 U.S.C. § 184(h)(2); 30 U.S.C. § 184(i) (requiring BFPs to be “dismissed promptly” from any judicial proceeding for the cancellation of a lease (or an interest therein)). These BFP provisions have been interpreted broadly to give full protection to all BFPs. J. Penrod Toles, 68 Interior Dec. 285, 289–91 (1961) (recognizing that the BFP amendments were passed in response to Congress’s concern regarding the Secretary’s attempt to cancel leases held in excess of the acreage limitation, but ruling that the language employed in the statute and in the legislative history is broad enough to cover other situations); 43 C.F.R. § 3108.4 (“A lease or interest therein shall not be cancelled to the extent that such action adversely affects the title or interest of a bona fide purchaser even though such lease or interest, when held by a predecessor in title, may have been subject to cancellation.”). Thus, neither the Secretary nor the judiciary may cancel a lease owned by a BFP. A BFP is generally described as one who acquired his interest in good faith, for valuable consideration, and without notice of any deficiency in his grantor’s title. Sw. Petroleum Corp. v. Udall, 361 F.2d 650, 656 (10th Cir. 1966). As the evidence shows, Solenex is entitled to BFP protection. It is undisputed that Solenex and its predecessors acquired the lease in good faith and with no notice that the lease may have been improperly issued. In fact, the Secretary first suggested that the lease may have been improperly issued in 2015—after this Court granted summary judgment in favor of Solenex. Dkt. # 53 at 2. Notably, this suggestion arose 33 years after the BLM issued the lease and 11 years after Solenex was assigned the lease. Dkt. # 24-2 at Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 34 of 65 21 34. It is further undisputed that valuable consideration had been paid for the lease after it was originally issued. In 1982, the BLM issued the lease to Sidney M. Longwell. Dkt. # 24-2 at 4. In 1983, Fina paid valuable consideration to Mr. Longwell for the assignment of the lease. Dkt. # 24- 2 at 33 (indicating that the lease was assigned in return for a production payment);13 see Waskey v. Chambers, 224 U.S. 564, 566 (1912) (lessee who agreed to work the mine and remit to the lessor 30 percent of the minerals extracted paid valuable consideration for the lease). In 1999, Fina— tired of “Defendants’ endless delays”— assigned the lease back to Mr. Longwell, who ultimately assigned it to Solenex in 2004. Dkt. # 24-2 at 33–34. Thus, at a minimum, Solenex is entitled to BFP protection based upon the fact that its predecessor, Fina, was a BFP. Home Petroleum Corp., 54 IBLA 194, 213–14 (1981) (successor in interest to a BFP may take advantage of its predecessor’s status as a BFP to prevent its lease from being cancelled), aff’d sub nom, Geosearch, Inc. v. Watt, 721 F.2d 694, 699 (10th Cir. 1983); U.S. v. Parcel of Land, Bldgs., Appurtenances & Improvements, Known as 92 Buena Vista Ave., Rumson, N.J., 507 U.S. 111, 142 (1993) (Kennedy, J., dissenting) (“[A] transferee who acquires property from a good-faith purchaser for value … obtains good title, even if the transferee did not pay value or act in good faith.”). Solenex is also entitled to BFP protection in its own right. Although Solenex did not pay money to Mr. Longwell for the assignment of the lease, Solenex did assume Mr. Longwell’s legal obligations under the lease. 30 U.S.C. § 187a (indicating that an assignee assumes all the duties and obligations in the lease). In addition, after being assigned the lease, Solenex expended substantial time and money seeking to fulfill its legal obligation under the lease, which included initiating this case in an effort to end Defendants’ interminable delay. See Dkt. # 24-2 at 36 (indicating that Solenex incurred out-of-pocket expenses in seeking to develop the lease and has 13 If required, Solenex can prove that Fina also paid money for the assignment of the lease. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 35 of 65 22 posted a $10,000 bond for the lease); see also Dkt. # 77 to Dkt. # 77-3 (documenting time and expenses incurred in litigating this case prior to the Secretary’s decision). The expenditure of this time and money entitles Solenex to BFP protection. See Lykins v. McGrath, 184 U.S. 169, 173 (1902) (“To enable the grantee to claim protection as a [BFP] he must have parted with something possessing an actual value, capable of being estimated in money, or he must on the faith of the purchase have changed, to his detriment, some legal position that he before had occupied.” (emphasis added) (quotation omitted)); 2 Summers Oil and Gas § 12:14 (3d ed., Nov. 2015) (“[I]f the lessee has actually expended a substantial sum of money in drilling …, or in the preparation therefor, prior to notice of a prior conveyance … he should be considered as having paid value sufficient to make him a [BFP] for value.” (emphasis added) (footnote omitted)). The Secretary does not dispute Solenex’s good faith or that Solenex acquired the lease for valuable consideration. Instead, the Secretary argues that Solenex is not entitled to BFP protection solely on the grounds that Solenex had notice that the lease was suspended when it acquired the lease. Dkt. 68-1 at 1 n.2 (“Solenex LLC acquired the lease with full knowledge that lease operations were suspended in 1985 because of a legal challenge and they remain suspended to date.”). The Secretary’s argument borders on the frivolous. First, the breadth of the Secretary’s argument is truly amazing. If an assignee of a suspended lease is not entitled BFP protection, the Secretary has rendered most, if not all, suspended leases worthless because no reasonable person would purchase a suspended lease without the BFP protection provided by the MLA. See Winkler v. Andrus, 614 F.2d 707, 711 (10th Cir. 1980) (noting that the BFP protection was added to the MLA “to foster development of oil and gas resources on public lands and to protect innocent investors and operators”). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 36 of 65 23 Second, the notice that could deny an assignee BFP protection is notice of a defect in the assignor’s title. Sw. Petroleum Corp., 361 F.2d at 657 (“The [BFP] amendment [to the MLA] ... necessarily contemplates some inquiry be made into the records pertaining to title.” (emphasis added). That a lease is suspended does not suggest that there is a defect in the title. See 30 U.S.C. § 209 (indicating that the Secretary may suspend operations and production “in the interest of conservation”). To be sure, an assignee may be charged with constructive notice of documents in the BLM’s lease file. See Winkler, 614 F.2d at 713. But the Secretary failed to cite a single document in the BLM’s lease file as of 2004 that would have put Solenex on notice that there was a purported defect in Mr. Longwell’s title. Without citing any evidence, the Secretary’s argument is unavailing. See State Farm, 463 U.S. at 43 (a court “may not supply a reasoned basis for the agency’s action that the agency itself has not given” (quotation omitted)). Finally, contrary to the Secretary’s suggestion, Dkt. # 68-1 at 1 n.2, the so-called 1985 legal challenge would not have put Solenex on notice that there was a purported defect in the title of the lease. In November 1983, Fina submitted the APD. PSOF ¶ 23. In January 1985, the Forest Service and the BLM issued the 1985 EA with respect to the APD. Id. ¶¶ 29 –30. The conclusion of the two agencies was that the proposed project, as limited by the lease stipulations and the additional conditions of approval imposed by the agencies, could be performed without any adverse environmental effects. Id. ¶ 30. Thus, based upon the 1985 EA, the BLM approved the APD. Id. Clearly, the BLM would not have approved the APD if there were a defect in the title to the lease. After the BLM’s approval of the APD was appealed to the IBLA, the IBLA generally affirmed the BLM’s use of an EA to approve the APD. Glacier–Two Medicine All., 88 IBLA 133, 139–47 (1985). The IBLA did, however, set aside the approved APD and remand for Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 37 of 65 24 further consideration of four issues. Id. at 148–55. Noticeably absent from the appeals and the IBLA’s decision is any suggestion that the lease may have been improperly issued. Thus, contrary to the Secretary’s suggestion, the so-called 1985 legal challenge would not have put Solenex on notice that there was a purported defect in the title to the lease. As the foregoing demonstrates, the Secretary’s cancellation of the lease was unlawful because Solenex is entitled to BFP protection. Therefore, this Court should hold unlawful and set aside the Secretary’s decision. IV. THE SECRETARY’S CANCELLATION OF THE LEASE WAS BARRED BY THE PASSAGE OF TIME. Even if the Secretary had the authority to cancel Solenex’s lease and assuming Solenex is not entitled to BFP protection, the Secretary was still barred from cancelling the lease in light of the passage of time. Noticeably absent from the Secretary’s decision is the citation to a single case where the Secretary cancelled a lease more than three decades after it was issued. This is not surprising considering that 28 U.S.C. § 2462 bars such belated action: Except as otherwise provided by Act of Congress, an action, suit or proceeding for the enforcement of any civil fine, penalty, or forfeiture, pecuniary or otherwise, shall not be entertained unless commenced within five years from the date when the claim first accrued …. (Emphasis added). This section is a “a catch-all statute of limitations [for] situations where Congress did not specifically include a time limitation in the statute.”14 FEC v. Nat’l Republican 14 The statute of limitations in the MLA provides that “[n]o action contesting a decision of the Secretary involving any oil and gas lease shall be maintained unless such action is commenced or taken within ninety days after the final decision of the Secretary relating to such matter.” 30 U.S.C. § 226-2; see S. Rep. No. 86-1549, reprinted at 1960 U.S.C.C.A.N. 3313, 3316 (indicating that this provision was added to the MLA in 1960 to provide lessees additional certainty of title). This provision should bar the Secretary’s actions because the Secretary is effectively contesting her predecessor’s decision to issue the lease in 1982. At a minimum, this provision reveals that Congress would not condone the Secretary’s belated actions because, if the Secretary can cancel a 33-year-old lease, no lease is safe. That Congress would not condone the Secretary’s belated Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 38 of 65 25 Senatorial Comm., 877 F. Supp. 15, 17 (D.D.C. 1995). As recognized by the D.C. Circuit, the 5- year limitation period in 28 U.S.C. § 2462 applies to both administrative and judicial proceedings. 3M Co. (Minn. Min. & Mfg.) v. Browner, 17 F.3d 1453, 1457 (D.C. Cir. 1994). Moreover, because Congress used forfeiture and cancellation interchangeably in the MLA, 30 U.S.C. § 188(a), the use of “forfeiture” in 28 U.S.C. § 2462 indicates that the Secretary’s cancellation of Solenex’s lease came 28 years too late. This is especially true, considering that the Secretary’s cancellation of Solenex’s 33-year- old lease was “punitive” in nature. Indeed, the Secretary never suggested that the lease may have been improperly issued until after this Court granted summary judgment in favor of Solenex. Dkt. # 53 at 2. Because the Secretary’s’ new position is in direct response to this Court’s adverse ruling, 28 U.S.C. § 2462 and/or the Due Process Clause bar the Secretary’s belated actions. Cf. Bordenkircher v. Hayes, 434 U.S. 357, 363 (1978) (“To punish a person because he has done what the law plainly allows him to do is a due process violation of the most basic sort …, and for an agent of the State to pursue a course of action whose objective is to penalize a person’s reliance on his legal rights is patently unconstitutional.” (internal quotations and citations omitted)). Even if the Secretary’s belated actions are not statutorily time-barred, they are barred by laches. See Powell v. Zuckert, 366 F.2d 634, 636 (D.C. Cir. 1966) (“The defense of laches stems from the principle that equity aids the vigilant, not those who slumber on their rights ....” (quotation omitted)). The Supreme Court has recognized that laches is a valid defense to the dilatory actions of the federal government. Clearfield Trust Co. v. U.S., 318 U.S. 363, 369–70 (1943). To establish a defense of laches a party must prove: “(1) lack of diligence by the party against whom action is also proven by 43 U.S.C. § 1166, which provides that no suits “to vacate and annul any patent shall” be brought after six years of issuance. Cf. Witbeck v. Hardeman, 51 F.2d 450, 452 (5th Cir. 1931) aff’d, 286 U.S. 444 (1932) (analogizing a lease to a patent because a “lease is the final action of [the Secretary] in “disposing of the land”). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 39 of 65 26 the defense is asserted, and (2) prejudice to the party asserting the defense.” Costello v. U.S., 365 U.S. 265, 282 (1961). These elements are easily satisfied in the instant case. First, the Secretary waited more than 33 years before suggesting that the lease may have been improperly issued. On its face, this delay is unconscionable, especially considering that title to an oil and gas lease is at stake. Cf. Patterson v. Hewitt, 195 U.S. 309, 321 (1904) (noting that laches is strictly enforced when mining property is at stake). Making this unconscionable delay even more egregious is that, if the lease were improperly issued as the Secretary now suggests, those facts were available since 1982. See Dkt. # 68-1 at 8–12. Second, the prejudice to Solenex caused by the Secretary’s egregious delay is undisputed. Indeed, if the Secretary had immediately cancelled the lease in 1982, Mr. Longwell would not have suffered through the subsequent three decades hoping to see the well drilled. Dkt. # 24-2 at 32–35. Nor would have Solenex invested all the time and money in an effort to get the suspension lifted so that it could exercise its valuable lease rights. See Dkt. # 77 to Dkt. # 77–3. As the foregoing demonstrates, the Secretary was barred from cancelling Solenex’s 33- year-old lease by the passage of time. Therefore, this Court should hold unlawful and set aside the Secretary’s decision. V. THE SECRETARY IS ESTOPPED FROM ASSERTING THAT THE LEASE WAS IMPROPERLY ISSUED AFTER REPEATEDLY REPRESENTING THAT THE LEASE WAS VALID AND PROPERLY ISSUED FOR MORE THAN 33 YEARS. Assuming that the Secretary had the authority to cancel Solenex’s lease and assuming the Secretary’s actions are not otherwise barred, the Secretary is estopped from now asserting that the lease was improperly issued. See Floyd Higgins, 147 IBLA 343, 347–48 (1999) (ruling that equitable estoppel applies against the government). Estoppel is based upon the principle that: [H]e who by his language or conduct leads another to do what he would not otherwise have done, shall not subject such person to loss or injury by Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 40 of 65 27 disappointing the expectations upon which he acted. Such a change of position is sternly forbiddden [sic]. It involves fraud and falsehood, and the law abhors both. This remedy is always so applied as to promote the ends of justice…. It accomplishes that which ought to be done between man and man, and is not permitted to go beyond this limit. Dickerson v. Colgrove, 100 U.S. 578, 580–81 (1879); see U.S. v. Georgia-Pacific Co., 421 F.2d 92, 95 (9th Cir. 1970) (“Equitable estoppel is a doctrine adjusting the relative rights of parties based upon consideration of justice and good conscience.”); Heckler v. Cmty. Health Servs. of Crawford Cnty., Inc., 467 U.S. 51, 60–61 (1984) (equitable estoppel should apply when necessary to ensure that private parties are treated with a “minimum standard of decency, honor, and reliability in their dealings with their Government”). The elements for invoking estoppel against the government are: (1) The party to be estopped must know the facts; (2) he must intend that his conduct shall be acted on or must so act that the party asserting the estoppel has a right to believe it is so intended; (3) the latter must be ignorant of the facts; and (4) he must rely on the former’s conduct to his injury. Floyd Higgins, 147 IBLA at 347 (quoting Georgia-Pacific, 421 F.2d at 96). These elements are easily satisfied in the instant case. First, if one were to accept the Secretary’s new position that the lease was improperly issued, the Secretary and the BLM must be charged with knowing this fact in 1982. See Dkt. # 68- 1 at 8 (Secretary suggesting that the lease was improperly issued based upon purported mistakes made by the BLM in 1982). Despite this knowledge, the Secretary and the BLM repeatedly represented—through their actions and their official documents—that the lease was valid and properly issued for more than 33 years.15 See, e.g., Transcript of June 10, 2015 Oral Argument at 15 For example, on April 19, 2002, in response to an inquiry from Mr. Longwell as to whether the approved APD was still valid, the BLM responded: “The answer is yes, you have a valid permit.” Dkt. # 45-6 at 55; see also Dkt # 34-1 at 10. An approved APD necessarily means that the lease is valid and properly issued. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 41 of 65 28 22:1–40:8 (Defendants arguing that they have not unreasonably delayed in lifting the suspension on the lease—a lease they now contend was improperly issued).16 Second, the Secretary and the BLM intended that Solenex and its predecessors would act on their representations that the lease was properly issued by investing time and money in seeking to develop the oil and gas resources, in accordance with the terms of the lease. See Dkt. # 24-2 at 32–36. Third, Solenex and its predecessors had no knowledge that the Secretary and the BLM’s repeated representations that the lease was valid and properly issued were—based upon the Secretary’s new position—“misrepresentations.” In fact, the Secretary first suggested that the lease may have been improperly issued only after this Court had ruled that Defendants’ 29-year delay was unlawful. Dkt. # 53 at 2. Finally, it is undisputed Solenex and its predecessors changed their position to their detriment in reasonable reliance on the Secretary and the BLM’s repeated representations that the lease was valid and properly issued. See, e.g., Dkt. # 24–2 at 33–34; Dkt. # 77 to Dkt. # 77–3. As the foregoing demonstrates, the elements for applying estoppel against the Secretary are established.17 See U.S. v. Eaton Shale Co., 433 F. Supp. 1256, 1272 (D. Colo. 1977) (“[T]he 16 Even if the Secretary is not equitably estopped, the Secretary should be judicially estopped from now suggesting that the lease was improperly issued after arguing to this Court that the 29- year delay was not unreasonable. See N.H. v. Maine, 532 U.S. 742, 749–51 (2001) (explaining that judicial estoppel is an equitable doctrine that protects the integrity of the judicial process by preventing parties from taking inconsistent positions). Arguing that the 29-year delay was not unreasonable is entirely inconsistent with the Secretary’s new position that the lease was improperly issued. Moreover, if the Secretary had taken the position that the lease was improperly issued when this case was filed in 2013, it would have saved this Court a lot of time and would have saved Solenex both time and money. See U.S. v. Jenks, 129 F.3d 1348, 1352 (10th Cir. 1997) (the United States’ “flip-flopping of its position … has resulted in an enormous waste of judicial resources” (quotation omitted)). 17 Some authorities suggest that there must be “affirmative misconduct,” such as misrepresentation or concealment of material facts, to estop the federal government. Floyd Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 42 of 65 29 government is estopped from asserting the invalidity of the patent. The action taken by the government in granting the patent, and the consistent course of administrative conduct from the mid-1930’s to the early 1960’s, are persuasive grounds for application of the doctrine of estoppel.”). Therefore, this Court should hold that the Secretary is estopped from now asserting that Solenex’s lease was improperly issued. And, because that assertion was the only basis upon which the Secretary cancelled the lease, this Court should hold unlawful and set aside the Secretary’s decision. VI. CONTRARY TO THE SECRETARY’S NEW POSITION, THE LEASE WAS PROPERLY ISSUED. Assuming that the Secretary had the authority to cancel Solenex’s lease and assuming the Secretary is not otherwise barred from cancelling the lease, the Secretary’s new position that the lease was improperly issued is erroneous. According to the Secretary, the lease was issued in violation of, inter alia, the National Environmental Policy Act (“NEPA”), 42 U.S.C. § 4331 et seq. and the National Historic Preservation Act (“NHPA”), 54 U.S.C. § 300101 et seq. Dkt. # 68-1 at 8–12. As demonstrated below, the Secretary’s arguments are fallacious. A. There Were No NEPA Violations In The Issuance Of The Lease. NEPA is a procedural statute designed to foster informed decision-making that does not impose any substantive requirements. Baltimore Gas and Elec. Co. v. NRDC, 462 U.S. 87, 97–98 (1983). Instead, “NEPA merely prohibits uninformed—rather than unwise—agency action.” Higgins, 147 IBLA at 347; see Morris Commc’ns, Inc. v. FCC, 566 F.3d 184, 191 (D.C. Cir. 2009). The D.C. Circuit has defined “affirmative misconduct” as acts or omissions “that can be characterized as misrepresentation or concealment,” or behavior that “ha[s] or will cause an egregiously unfair result.” Pierce v. SEC, 786 F.3d 1027, 1038 (D.C. Cir. 2015) (quotation omitted). Assuming “affirmative misconduct” must be shown, the facts in the case prove—if one were to accept the Secretary’s new position—that the Secretary and the BLM engaged in a concerted pattern of “misrepresentation” and “concealment” regarding the true status of the lease for over 33 years. To condone this dishonest behavior would “cause an egregiously unfair result,” considering the time and money invested by Solenex in seeking to develop the lease. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 43 of 65 30 Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 351 (1989); New York v. NRC, 681 F.3d 471, 476 (D.C. Cir. 2012) (“NEPA is an ‘essentially procedural’ statute intended to ensure ‘fully informed and well-considered’ decisionmaking, but not necessarily the best decision.” (quoting Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 558 (1978))). Moreover, federal agencies must comply with NEPA only “to the fullest extent possible[.]” 42 U.S.C. § 4332; see Flint Ridge Dev. Co. v. Scenic Rivers Ass’n, 426 U.S. 776, 787–93 (1976) (NEPA compliance may be excused if it would conflict with another statutory mandate). NEPA is triggered when an agency proposes a “major Federal action[.]” 42 U.S.C. § 4332(C). All “major Federal actions,” however, do not require a full-blown EIS. In order to determine whether an EIS is required, an agency may prepare an EA. 40 C.F.R. §§ 1501.4(b), 1508.9. If, based upon the EA, the agency concludes there would be no significant environmental effects, it may issue a Finding of No Significant Impact (“FONSI”), obviating the need to prepare an EIS. See 40 C.F.R. §§ 1501.3, 1501.4(c), (e), 1508.9. Moreover, when an agency provides a full and fair discussion of environmental impacts in a NEPA document, the agency has satisfied NEPA by taking the requisite “hard look” at environmental consequences. Nevada v. Dep’t of Energy, 457 F.3d 78, 93 (D.C. Cir. 2006). In suggesting that the lease was issued in violation of NEPA, the Secretary makes two primary arguments. First, the Secretary argues that the lease was issued in violation of Conner v. Burford, 848 F.2d 1441, 1448–51 (9th Cir. 1988), which ruled that an EIS was required before a non-No Surface Occupancy (“NSO”) lease may be issued.18 Dkt. # 68-1 at 8–10. Second, the 18 An NSO-lease includes a stipulation covering the entire lease that prohibits the lessee from using any of the surface without further governmental approval. Conner, 848 F.2d at 1444. Solenex’s lease had an NSO stipulation that covered more than 18 percent of the lease. Outside the area covered by the NSO stipulation, surface disturbing activities were prohibited without further governmental approval after full NEPA compliance. Dkt. # 45-10 at 10-11. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 44 of 65 31 Secretary argues, in the alternative, that the lease was issued in violation of Bob Marshall All. v. Hodel, 852 F.2d 1223, 1230 (9th Cir. 1988), which ruled that a no-action alternative must be considered before issuing a lease. Dkt. # 68-1 at 8–10. Neither of the Secretary’s arguments holds water. In Conner, the Ninth Circuit ruled that an EIS was required before issuance of a non-NSO lease because, according to the Ninth Circuit, the issuance of such a lease constitutes an “irreversible and irretrievable commitment” of resources.19 848 F.2d at 1446, 1448–51. To be sure, the Ninth Circuit based its ruling on the D.C. Circuit’s decision in Sierra Club v. Peterson, 717 F.2d 1409 (D.C. Cir. 1983). Conner, 848 F.2d at 1449. But, with all due respect to the Ninth Circuit and the D.C. Circuit, the mere issuance of a non-NSO lease is not an “irreversible and irretrievable commitments of resources” and does not automatically require an EIS in all situations. Park County Res. Council, Inc. v. U.S. Dep’t of Agric., 817 F.2d 609, 620–24 (10th Cir. 1987) (upholding the issuance of a non-NSO lease based upon an EA and a FONSI). As explained by the 10th Circuit, this is because: [An] oil and gas lease, by itself, does not cause a change in the physical environment. In order to work the lease, the lessee must submit site-specific proposals to the Forest Service and BLM who can then modify those plans to address any number of environmental considerations. Each action is subject to continuing NEPA review. Id. at 622. The facts in this case prove the truth of the 10th Circuit’s reasoning. 19 The “‘irreversible and irretrievable commitment of resources’ criterion is derived from 42 U.S.C. § 4332(C)(v) which requires an EIS to include a statement of ‘any irreversible and irretrievable commitments of resources which would be involved in the proposed action should it be implemented.’” Conner, 848 F.2d at 1446 n.13. The facts in this case demonstrate the fallacy of the suggestion that the mere issuance of Solenex’s lease was an “irreversible and irretrievable commitment of resources.” Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 45 of 65 32 On February 18, 1981, the Forest Service issued a Decision Notice (“DN”) and FONSI, selecting Alternative 3 of the 1981 EA.20 Dkt. # 45-10 at 9–11. Under this Alternative: ● Leases with surface occupancy would be issued only for accessible areas that could be protected; ● Lease denial or issuance of a NSO-lease would be recommended when the area cannot be adequately protected; ● Leases partially located in areas that cannot be protected would receive a NSO stipulation for those areas; ● All leases would be subject to: (a) standard stipulations; (b) special stipulations, and (c) comprehensive surface use guidelines; and ● After lease issuance, any proposed oil and gas activities would be fully analyzed under NEPA. Id. at 78. Following the DN and FONSI, the Forest Service conducted additional site-specific analyses on the acres not recommended for lease denial to determine the specific stipulations and mitigation requirements to be applied on an acre-by-acre basis. Dkt. # 45-4 at 13. Based upon this site-specific analysis, special stipulations were attached to Solenex’s lease to protect surface resources. Dkt. # 45-12 at 3–9. More importantly, in accordance with the 1981 EA, Solenex’s APD was indeed subjected to comprehensive NEPA reviews. PSOF ¶¶ 27–59. The Secretary has not seriously attacked the sufficiency of the 1981 EA; instead, the Secretary makes the argument that the issuance of a non-NSO lease requires an EIS in each and every situation. This argument, however, elevates form over substance. This is especially true considering that the comprehensive, 162-page 1981 EA was the functional equivalent of a full- blown EIS. See Spiller v. White, 352 F.3d 235, 240–45 (5th Cir. 2003) (upholding an agency’s 20 In the 1981 EA, six alternatives were considered in detail. Dkt. # 45-10 at 48–49. These alternatives included a no-action alternative (Alternative 1) and an alternative that would lease all acreage with an NSO stipulation (Alternative 4). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 46 of 65 33 decision not to prepare an EIS when the EA was “akin to a full-blown EIS”). Because the Secretary’s argument would not succeed if raised by a third party challenging the 1981 EA in light of the deference accorded to an agency’s decision not to prepare an EIS, see TOMAC, Taxpayers of Mich. Against Casinos v. Norton, 433 F.3d 852, 860–61 (D.C. Cir. 2006), the Secretary’s argument is nothing more than a pretext for cancelling Solenex’s lease. The Secretary’s no-action alternative argument fairs no better. The no-action alternative was fully considered in the 1981 EA, which defined this alternative as to delay making recommendations on all pending lease applications until completion of the forest plan.21 Dkt. # 45-10 at 48, 62. This alternative was equivalent to a “no-lease” alternative because to delay making lease recommendations has the same effect as making a decision not to lease. See MSLF v. Andrus, 499 F. Supp. 383, 386–395 (D. Wyo. 1980) (failure to make recommendations on lease applications constituted an unlawful withdrawal). Although this alternative would violate the Energy Security Act of 1980, 42 U.S.C. § 8855, the environmental effects of this alternative were fully compared to the effects of the other alternatives. Dkt. # 45-10 at 62, 75–79. That the Secretary may now wish that the no-action alternative had been selected does not make the analysis of the no-action alternative deficient. See Hammond v. Norton, 370 F. Supp. 2d 226, 242 (D.D.C. 2005) (refusing to second-guess any agency’s decision not to select the no-action alternative). This conclusion is confirmed by reviewing the EA at issue in Bob Marshall, which addressed leasing in the Deep Creek RARE II Further Planning Area (“Deep Creek EA”).22 852 21 The selected alternative, Alternative 3, mandated “lease denial” or issuance of an NSO-lease for areas that could not be adequately protected. Dkt. # 45-10 at 78. Denying all lease applications was also considered as a component of Alternative 4. Dkt. # 45-10 at 48. 22 Importantly, the area around of Solenex’s lease was not eligible for wilderness designation; whereas, the Deep Creek area was eligible. Compare Dkt. # 45-2 at 31 with Bob Marshall, 852 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 47 of 65 34 F.2d at 1225–27; HC11590–756 (Deep Creek EA). Under the no-action alternative in the Deep Creek EA, no recommendations on pending lease applications would be made. HC11646. As the Forest Service believed that such an alternative would be unlawful, it eliminated the no- action alternative from further consideration. HC11646, 11674–75. Because the no-action alternative had been eliminated from further consideration, it was not an available alternative when it came time to select the preferred alternative. HC11676–82. Therefore, as the Ninth Circuit found and the government admitted on appeal, the no-action alternative had not been seriously considered. Bob Marshall, 852 F.2d at 1228–29. In contrast, the no-action alternative was fully considered in the 1981 EA and it was still available for selection when Alternative 3 was selected. Dkt. # 45-10 at 78–79. Therefore, because the no-action alternative was fully considered in the 1981 EA, the Secretary’s reliance on Bob Marshall is misplaced. In any event, even if a violation of NEPA may have occurred prior to issuance of Solenex’s lease, it was subsequently corrected. Since lease issuance, additional NEPA processes were completed that thoroughly analyzed oil and gas leasing on the Lewis and Clark National Forest and, in particular, the APD submitted by Solenex’s predecessor in 1983. The results of these processes are reflected in the following documents: (1) the 1985 EA;23 (2) the 1986 Forest Plan and the 1986 FEIS;24 and (3) the 1990 FEIS (which comprehensively analyzed the effects of F.2d at 1225–26; see 1990 FEIS, Appendix J-7 to J-11 (Blackfeet Tribe explaining that the area around the lease is “not a ‘roadless wild area’” and that designating the area as wilderness would deny the lessees “their property rights ….”). 23 Importantly, the BLM was largely successful in defending its approval of the APD based upon the 1985 EA. Glacier–Two Medicine All., 88 IBLA 133, 139–47 (1985). Because the 1985 EA supported approval of the APD, it would necessarily support issuance of the lease. The 1985 EA also expressly incorporated the 1981 EA. A0003:FS000053, 57–58, 62, 70–71. 24 Both the 1986 Forest Plan and the 1986 FEIS expressly incorporated the 1981 EA. 1986 Forest Plan at 1-10 to 1-11; 1986 FEIS at 2–82 to 2-84. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 48 of 65 35 the APD).25 PSOF ¶¶ 29–30, 35–37, 45–46. Based upon these documents, the BLM, with the concurrence of the Assistant Secretary, issued the 1993 ROD approving the APD. Dkt. # 45-5 at 40 to 45-6 at 33. In the 1993 ROD, the Assistant Secretary officially determined that any NEPA violation that may have occurred prior to lease issuance had been corrected by, inter alia, the 1990 FEIS and 1986 FEIS. Dkt. # 45-6 at 21–24; PSOF ¶ 59 (quoting from the 1993 ROD). In making this determination, the Assistant Secretary expressly noted that the 1990 FEIS was specifically prepared to meet the requirements set forth by the Ninth Circuit in Conner. Dkt. # 45-6 at 22; PSOF ¶ 59. More importantly, because the 1993 ROD was a final decision for the Secretary, it constituted the official position of the Secretary for 23 years. Thus, the Secretary’s new position that the lease was improperly issued in violation of NEPA is not only factually and legally wrong—it is the epitome of arbitrariness. See Tex. Oil & Gas Corp. v. Watt, 683 F.2d 427, 431– 34 (D.C. Cir. 1982) (reversing a lease cancellation decision that was based upon the Secretary’s “eleventh-hour” change in position, because to allow such a decision to stand “would be sanctioning a retroactive exercise of discretion to which it is impossible to ascribe any rational purpose”). It is anticipated that the Secretary will argue that she has the inherent authority to reverse the position of her predecessor. Even if that were true, well-established precedent and fundamental fairness prevent the Secretary from “flip-flopping” under the facts in this case. See Smiley v. Citibank (S. Dakota), N.A., 517 U.S. 735, 742 (1996) (a change in position “that does not take account of legitimate reliance on” the prior position may constitute arbitrary and capricious action). 25 The 1990 FEIS expressly incorporated the 1981 EA, as well as the 1986 Forest Plan and the 1986 FEIS. Dkt. # 45-4 at 6–14; see Dkt. # 45-6 at 22. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 49 of 65 36 Indeed, any inherent authority to change position cannot be exercised out of spite or based upon a current aversion to the earlier position. See Am. Trucking Ass’ns v. Frisco Transp. Co., 358 U.S. 133, 146 (1958) (“[T]he power to correct inadvertent ministerial errors may not be used as a guise for changing previous decisions because the wisdom of those decisions appears doubtful in the light of changing policies.”); U.S. v. Seatrain Lines, 329 U.S. 424, 428–33 (1947) (rejecting the federal government’s attempt to revoke a certificate of convenience in light of a change in policy). Here, the only thing of substance that occurred between the 1993 ROD and the Secretary’s new position was this Court’s ruling that Defendants’ 29-year delay was unlawful. See Dkt. # 52 at 2–3. It goes without saying that the Secretary should not be allowed to take her frustrations out on Solenex by reversing the position of her predecessor. See Iceland S.S. Co. v. U.S. Dep’t of the Army, 201 F.3d 451, 461 (D.C. Cir. 2000) (agency action motivated by subjective bad faith is arbitrary and capricious). In addition, any authority to change position must be exercised within a reasonable amount of time. See Bookman v. U.S., 453 F.2d 1263, 1265 (Ct. Cl. 1972) (“[A]bsent contrary legislative intent or other affirmative evidence, this court will sustain the reconsidered decision of an agency, as long as the administrative action is conducted within a short and reasonable time period.”). Here, the Secretary’s 23-year delay in reversing the position of her predecessor is unreasonable under any definition. Gratehouse v. U.S., 512 F.2d 1104, 1109 (Ct. Cl. 1975) (“What is a short and reasonable time period [for reconsideration] will vary with each case, but absent unusual circumstances, the time period would be measured in weeks, not years.”). Therefore, even if the Secretary has the inherent authority to change the position of her predecessor after 23 years, that authority cannot now be exercised under the facts in this case. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 50 of 65 37 In a final desperate attempt to justify her egregious actions, the Secretary argues that the lease was issued improperly in violation of NEPA because, according to the Secretary, the BLM never adopted the 1981 EA. Dkt. # 68-1 at 10. Assuming that the BLM was required to adopt the Forest Service’s 1981 EA, the Secretary cites no evidence that the BLM failed to do so. See Dkt. # 68-1 at 10. In any event, the BLM’s actions prove that it did, indeed, adopt the 1981 EA. First, the BLM participated in the preparation of the 1981 EA as a cooperating agency. Dkt. # 45-10 at 11. Thus, the BLM was actively involved in all aspects of the decision-making process that culminated in the 1981 EA. Dkt. # 45-10 at 80–82. Second, in accordance with an existing Memorandum of Understanding (“MOU”) between the Forest Service and the BLM,26 upon receipt of the leasing recommendation by the Forest Service as to the acres at issue, the BLM reviewed both the recommendation and 1981 EA, and independently determined that the Forest Service’s recommendation was “appropriate.” See PSOF ¶¶ 6–8. Based upon that independent determination, the BLM then: (1) designated those acres as “Parcel No. MT 73”; (2) attached the required stipulations from the Forest Service’s recommendation and 1981 EA to the applicable acres in Parcel No. MT 73; (3) posted Parcel No. MT 73 for the September 1981 noncompetitive lease drawing; (4) drew Mr. Longwell’s application for Parcel No. MT 73; (5) accepted Mr. Longwell’s money for the lease; (6) issued the lease to Mr. Longwell: and (7) treated the lease as valid and properly issued for the next 33 years.27 See PSOF ¶¶ 7–11. Finally, as noted above, the BLM formally adopted the 1981 EA, by, inter alia, expressly incorporating it into both the 1985 EA and the 1990 FEIS. 26 A copy of this MOU is attached hereto as Exhibit 1. 27 This evidence belies the Secretary’s suggestion, Dkt. # 68-1 at 10, that the BLM never determined that issuance of the lease was in the public interest. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 51 of 65 38 In short, it strains credulity for the Secretary to suggest that the BLM did not adopt the 1981 EA.28 As the foregoing demonstrates, there were no NEPA violations associated with issuance of the lease. Therefore, this Court should hold unlawful and set aside the Secretary’s decision. B. There Were No NHPA Violations In The Issuance Of The Lease. Like her NEPA argument, the Secretary’s NHPA argument is also devoid of merit.29 The NHPA is designed to identify potential conflicts between federal undertakings and historic properties and to provide a mechanism for attempting to resolve any purported conflicts. Section 106 of the NHPA requires that an agency having jurisdiction over an undertaking “take into account the effect of the undertaking on any historic property.” 54 U.S.C. § 306108; see 54 U.S.C. § 300308 (defining “historic property”). Like NEPA, the NHPA is a strictly procedural statute that neither confers a substantive right nor dictates a particular outcome. See Oglala Sioux Tribe v. U.S. Army Corps of Eng’rs, 537 F. Supp. 2d 161, 173 (D.D.C. 2008) (“‘The case law in this and other circuits holds that an agency’s duty to act under the NHPA … is procedural in nature.’” (quoting Nat’l Trust for Historic Pres. v. Blanck, 938 F. Supp. 908, 925 (D.D.C. 28 This is especially true considering that the BLM issued leases covering more than 400,000 acres of the National Forest based upon the same 1981 EA. Dkt. # 45-2 at 26. Many of those leases were issued for lands near Solenex’s lease and still exist today. Dkt. # 68-1 at 7 n.24. 29 Most of the Secretary’s NHPA argument is based on changes that occurred after the lease was issued in 1982. Dkt. # 68-1 at 2 (“subsequent factual and legal developments” indicate that the lease “was improperly issued.”); see id. at 5–7, 10–11. The major change, of course, was that this Court held that Defendants’ 29-year delay was unlawful. Dkt. # 52 at 2-3. In addition, the NHPA was amended in 1992 to provide for more involvement by tribes and to provide that properties of religious importance to tribes may be determined eligible for inclusion on the National Register. Pub. L. No. 102-575 § 4006, 106 Stat. 4600 (1992); 65 Fed. Reg. 77,698 (Dec. 12, 2000) (final rule amending regulations in light of 1992 statutory amendments); see Dkt. # 68-1 at 5 n.15 (Exec. Order No. 13007 issued in 1996); Dkt. # 43 at 7 (Defendants arguing that the 1992 NHPA changes justified their unlawful delay); see also Dkt. # 68-1 at 5 (a purported traditional cultural district (“TCD”) was discovered in 2002); but see PSOF ¶¶ 71–72 (no historic properties in 2004). Legal and factual changes occurring after lease issuance cannot be used to support an argument that the lease was improperly issued in 1982. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 52 of 65 39 1996), aff’d 203 F.3d 53 (D.C. Cir. 1999))). Instead, the NHPA simply requires agencies to “stop, look, and listen” before proceeding with an undertaking. Ill. Commerce Comm’n v. ICC, 848 F.2d 1246, 1261 (D.C. Cir. 1988) (quotation omitted); see U.S. v. 162.20 Acres of Land, More or Less, Etc., 639 F.2d 299, 302 (5th Cir. 1981) (“[Section 106] neither … forbid[s] the destruction of historic sites nor command[s] their preservation ….”). Assuming that the issuance of the lease was an “undertaking,” it is undisputed that the mere issuance of the lease did not, and cannot, have an impact on historic properties. Dkt. # 45-10 at 10 (“Lease issuance is an action which does not result in effects on the environment.”); see Nat’l Indian Youth Council v. Andrus, 501 F. Supp. 649, 674–76 (D.N.M. 1980), aff’d sub nom. Nat’l Indian Youth Council v. Watt, 664 F.2d 220, 228 (10th Cir. 1981) (approval of a mining plan—not approval of a lease—requires compliance with the NHPA). Accordingly, in the 1981 EA, it was determined that full NHPA compliance would be deferred until a specific surface-disturbing activity was proposed. Dkt. # 45-10 at 54; see also Dkt. # 45-12 at 6 (lease stipulation for the protection of cultural resources). The Secretary has not proven that this determination was in error.30 See Nat’l Indian Youth, 501 F. Supp. at 674–76 (approval of a coal lease did not trigger detailed NHPA compliance when compliance was to be performed before any mining activities would occur). This is especially true considering that, in keeping with the 1981 EA, the NHPA was fully complied with after the APD was submitted. Indeed, both the 1985 EA and the 1990 FEIS demonstrate full compliance with the NHPA. HC06943–7042 (BLM explaining how both NEPA and the NHPA were complied with in approving the APD in 1985); Dkt. # 45-6 at 19–20 30 The Secretary’s suggestion, Dkt. # 68-1 at 11, that the more than 400,000 acres of nonwilderness lands on the National Forest should have been inventoried before any leases were issued is ridiculous. See Nat’l Indian Youth, 664 F.2d at 228 (“The argument that a complete survey must be made of 40,000 acres before mining begins on eight acres borders on the absurd.”). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 53 of 65 40 (1993 ROD explaining that interviews with the Blackfeet Tribe did not result in the identification of any historic properties). Therefore, the Secretary’s NHPA argument is devoid of merit. As the foregoing demonstrates, there were no NHPA violations associated with issuance of the lease.31 Therefore, this Court should hold unlawful and set aside the Secretary’s decision. VII. THE SECRETARY’S CANCELLATION OF THE LEASE WAS ARBITRARY AND CAPRICIOUS. Assuming there are any uncorrected violations associated with issuance of the lease, those violations would not justify cancelling the lease. Instead, these non-MLA, procedural violations would, at most, constitute “harmless error,” which would not serve as a basis for a court to set aside the lease. 5 U.S.C. § 706 (the reviewing court “shall” take account of “the rule of prejudicial error”); see Nevada, 457 F.3d at 90–91 (applying the “harmless error” rule to NEPA violation). Even if the “harmless error” rule does not apply, the Secretary should have fixed the violations while the lease was suspended, as is the standard practice in similar cases.32 See S. Utah Wilderness All. v. U.S. Dep’t of Interior, No. 2:06-CV-342-DAK, 2007 WL 31 Contrary to the Secretary’s suggestion, Dkt. # 68–1 at 8, there were no American Indian Religious Freedom Act (“AIRFA”), 42 U.S.C. § 1996, violations associated with issuance of the lease. The 1981 EA, the 1985 EA, and the 1990 FEIS all demonstrate compliance with the AIRFA. Dkt. # 45-10 at 71, 81; 1985 EA at 128, 132–33, 140 [A003:FS000173, 177–78, 185]; Dkt. # 48-1 at 30–41 (demonstrating AIRFA compliance from 1972 to 1990); see HC06440–527 (demonstrating compliance with AIRFA in developing the 1986 Forest Plan) (margin notes by unknown author in original); see also Wilson v. Block, 708 F.2d 735, 747 (D.C. Cir. 1983) (“AIRFA requires federal agencies to consider, but not necessarily to defer to, Indian religious values.”). In addition, because there were no violations of NEPA, the NHPA, or the AIRFA associated with issuance of the lease, the Secretary’s argument that the BLM violated a trust responsibility vis-à-vis activities on non-Indian lands in baseless. See Dkt. # 68-1 at 11. 32 In Conner, the Ninth Circuit refused to cancel the non-NSO leases, but merely suspended them pending compliance with NEPA. 848 F.2d at 1458–62; In Bob Marshall, the Ninth Circuit remanded for determination of an appropriate remedy for the NEPA violation. 852 F.2d at 1230. On remand, the government argued that the leases should be suspended pending NEPA compliance. Bob Marshall All. v. Lujan, 804 F. Supp. 1292, 1295, 1297–98 (D. Mont. 1992). The lessee argued for cancellation. Id. at 1295, 1298. Influenced by the lessee’s desire, the court cancelled the leases. Id. at 1298. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 54 of 65 41 2220525, at *1–2 (D. Utah 2007). By failing to do so, the Secretary abused her discretion. See Ass’n of Data Processing, 745 F.2d at 683. The Secretary argues, however, that Section 403 of Pub. L. No. 109-432, 120 Stat. 2922 (2006), which withdrew the area from future leasing, prevents her from correcting the purported violations. Dkt. # 68-1 at 13. Yet, that withdrawal was made “subject to valid existing rights[.]” Pub L. No. 109-432, § 403(b)(1). Even if the Secretary were correct in suggesting that Solenex’s lease was voidable, Dkt. # 68-1 at 7, a voidable lease is a “valid existing right” under this saving clause because these types of saving clauses protect similar interests, especially when money has been paid for the interest. See, e.g., Stockley v. U.S., 260 U.S. 532, 536, 543–44 (1923). The Secretary also argues that correcting the violations would be futile because the exercise of any lease rights would adversely affect the purported TCD. Dkt. # 68-1 at 13. Yet, in correcting the purported violations, the relevant facts and laws are those in existence prior to lease issuance, not those in existence in 2016. See Conner, 848 F.2d at 1461 (in correcting the NEPA violation, the agencies shall not consider the existence of the leases). In any event, the mere existence of a purported TCD “does not serve in any manner as a veto to uses of the property[.]” Dkt. # 32-2 at 18. This is especially true considering that the purported TCD and the purported finding of adverse effects were merely pretexts for Defendants’ unlawful delay and now the Secretary’s cancellation of the lease. See H0038:FS006507–31 (highlighting by unknown person in original); Solenex’s Comments (Sept. 4, 2015). In addition, the stipulations, mitigation and monitoring requirements, and conditions of approval that were incorporated into the approved APD would adequately protect the purported TCD. Solenex’s Comments at 10–23. Instead of objectively considering these protective measures, the Secretary simply capitulated to the religious demands of the Blackfeet, in violation of the Establishment Clause. U.S. Const. Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 55 of 65 42 amend I; Solenex’s Comments at 20–23; Lyng v. Nw. Indian Cemetery Protective Ass’n, 485 U.S. 439, 451–53 (1988). Finally, the Secretary failed to comply with NEPA before cancelling the lease. Cancelling a lease, or any property interest, is a “major Federal action[,]” that triggers NEPA. 42 U.S.C. § 4332(C); see Cal. ex rel. Cal. Coastal Comm’n v. Norton, 150 F. Supp. 2d 1046, 1055– 58 (N.D. Cal. 2001) aff’d sub nom. Cal. v. Norton, 311 F.3d 1162, 1175–78 (9th Cir. 2002) (suspending offshore leases triggers NEPA). In fact, in other situations, the BLM has complied with NEPA before making a decision to cancel leases. See 81 Fed. Reg. 51,936 (Aug. 5, 2016) (notice of availability of a FEIS for cancelling previously issued leases).33 The Secretary’s failure to comply with NEPA before cancelling the lease was necessarily unlawful. The Secretary tries to justify her failure to comply with NEPA by arguing that cancelling the lease preserved the status quo. Dkt. # 68-1 at 13–14. This is not true because the status quo is “the last uncontested status which preceded the pending controversy.” Consarc Corp. v. U.S. Treasury Dep’t, 71 F.3d 909, 913 (D.C. Cir. 1995) (quotation omitted). Prior to the Secretary’s decision, Solenex owned the lease and the right to drill a well through the approved APD, Dkt. # 45-6 at 5–33, although activities under the approved APD were suspended. Dkt. # 45-6 at 55. In cancelling the lease, the Secretary altered the status quo by: (a) destroying valuable property rights; (b) causing an “irreversible and irretrievable” loss of the oil and gas resources; and (c) denying “present and future generations of Americans” the benefits of the those resources. 42 U.S.C. § 4332(C)(v); 42 U.S.C. § 4331(a); see Cal. Co. v. Udall, 296 F.2d 384, 388 (D.C. Cir. 1961) (“The public does not benefit from resources that remain undeveloped, and the Secretary 33 See also EA DOI-BLM-CO-N040-2015-0023 (Jan. 2015) (EA for the cancellation of leases on the Roan Plateau), available at: http://www.blm.gov/co/st/en/BLM_Information/nepa/gsfo/completed_2015_nepa.html (last visited Sept. 8, 2016). Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 56 of 65 43 must administer the [MLA] so as to provide some incentive for development.”). The Secretary’s decision also puts a cloud on the title of all existing lessees and will have a chilling effect on all prospective lessees. This will destroy the onshore oil and gas leasing program and, thereby, frustrate Congress’s intent in passing the MLA. See Geosearch, Inc. v. Andrus, 508 F. Supp. 839, 845 (D. Wyo. 1981) (“Predictability and certainty of title are mandatory to the entire oil and gas leasing system.”). Because of the significant and controversial nature of her decision, the Secretary was required to comply with NEPA so as to ensure her decision was well-informed, and not simply a punitive response to this Court’s adverse ruling. For these reasons, the Secretary’s cancellation of the lease was arbitrary and capricious. Therefore, this Court should hold unlawful and set aside the Secretary’s decision. VIII. THE SECRETARY’S DISAPPROVAL OF THE APPROVED APD WAS ARBITRARY AND CAPRICIOUS. As demonstrated above, the Secretary’s cancellation of the lease was unlawful because of, inter alia, the passage of time and equitable estoppel. Similarly, the Secretary’s disapproval of the 23-year-old approved APD was unlawful for these same reasons. In addition, the regulation cited by the Secretary for the purported authority to disapprove the approved APD does not support her actions. See Dkt. # 68-1 at 13. That regulation allows the Secretary to disapprove an unapproved APD within 35 days of receipt of the APD. 43 C.F.R. § 3162.3- 1(h)(2). Notwithstanding the fact that the Secretary’s disapproval came 30 years too late, nothing in that regulation allows the Secretary to disapprove an approved APD, especially one that was approved by her predecessor 23 years earlier. The Secretary’s disapproval of the approved APD also violated the APA. Under the APA, the approved APD was a “license,” 5 U.S.C. § 551(8), which could only be “withdraw[n], revo[ked], or annul[led]” after notice and an opportunity to be heard. 5 U.S.C. § 558(c). It is Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 57 of 65 44 undisputed that Solenex was not provided notice and an opportunity to be heard before the Secretary disapproved the 23-year-old approved APD. For these reasons, the Secretary’s disapproval of the approved APD was arbitrary and capricious. Therefore, this Court should hold unlawful and set aside the Secretary’s disapproval of the 23-year-old approved APD. CONCLUSION This Court should grant summary judgment in Solenex’s favor and hold unlawful and set aside the Secretary’s decision that cancelled Solenex’s 33-year-old lease and disapproved Solenex’s 23-year-old approved APD. DATED this 12th day of September 2016. Respectfully submitted, /s/ Steven J. Lechner Steven J. Lechner, D.D.C. Bar No. AZ 0001 MOUNTAIN STATES LEGAL FOUNDATION 2596 South Lewis Way Lakewood, Colorado 80227 (303) 292-2021 (303) 292-1980 (facsimile) lechner@mountainstateslegal.com Attorney for Plaintiff Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 58 of 65 45 CERTIFICATE OF SERVICE I hereby certify that on this 12th day of September 2016, I electronically filed the foregoing using this Court’s CM/ECF system. I certify that all participants in this case are registered CM/ECF users and service will be accomplished by this Court’s CM/ECF system. /s/ Steven J. Lechner Steven J. Lechner Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 59 of 65 Exhibit 1 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 60 of 65 INTERIM MEHORANDUH OF UNDERSTANDING BETWEEN THE BUREAU OF LAND MANAGEMENT AND THE FOREST SERVICE The Bureau of Land Management, Department of the Interior, and the Forest Service, Department of Agriculture, hereby agree that the procedures set forth below shall be followed with respect to mineral leasing, mineral lease applications, and mineral prospecting permit applications as described below which involve National Forest System lands. These procedures are adopt~d to ensure cooperative, timely W0-177 and orderly action by the Bureau of Land Management and the Forest Service with respect to such leasing and permitting activity consistent with the assigned functional responsibilities of each agency. The agencies also agree to issue regulations which explain their respective re~ponsibilities. This Memorandum will expire when final regulations governing these procedures become effective. I. PURPOSE This agreement establishes the procedures for recommendation or consent by the Forest Service in the issuance of leases and prospecting permits on National Forest System lands for all minerals except coal. A. Recommendation Recommendations by the Forest Service are the mechanism established by this agreement to allow the Forest Service, as surface mana~in~ agency, to review potential leasing and permitting actions on National Forest System lands, for all minerals except coal, under the Mineral Leasing Act of 1920, 30 u.s.c. § 181 .!!_ !!S.• B. Consent Consent by the Forest Service is statutorily required for potential leasing and permitting actions on Forest Service lands under the Mineral Leasing Act for Acquired Lands, 30 U.S.C. § 351 ~!!S.·• section 402 of Reorganization Plan No. 3 of 1946, 5 u.s.c. Appendix, the Geothermal Steam Act of 1970, 30 u.s.c. I 1001 ~!!S.·• and any statute creating a special area under Forest Service jurisdiction which requires such consent (e.g. 30 u.s.c. I 192c). Encl. 3-1 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 61 of 65 W0-177 II. RESPONSIBILITIES A. Initiation - Bureau of Land Management 1. Applications for noncompetitive leases and prospecting permits. Noncompetitive oil and gas lease applications (43 CFR Subpart 3111), noncompetitive geothermal lease applications (43 CFR Subpart 3210) and prospecting permit applications (43 CFR Subpart 3510) shall be filed with the Bureau of Land Management. After preliminary adjudication, applications which involve National Forest System lands will be submitted to the Forest Service for review as described below in section II.B. 2. Noncompetitive simultaneous leasing and competitive leasing. Noncompetitive simultaneous leasing shall be conducted under the procedures set out in 43 CFR Subparts 3112 and 3211. Competitive leasing shall be conducted in accordance with the procedures set out in 43 CFR Subparts 3120 and 3220 and § 3521.2. The Bureau of Land Management will first identify parcels or areas which are available for simultaneous or competitive leasing. Descriptions of these parcels or areas will then be submitted to the appropriate Forest Service office for review as described below in section II.B. B. Forest Service Review 1. Basis for review. The Forest Service will review mineral leasing and permitting sub- mittals to determine the effect of the potential mineral activities on other resource values and on the purposes for which the particular lands are administered. The Forest Service will be responsible for compliance with the National Environmental Policy Act of 1969 with respect to activities being reviewed by that agency. 2. Recommendation or consent. Based on its review of the proposed leasing or permitting activities, the Forest Service will either: a. Recommend, or consent to, the proposed activity with standard stipulations included in the lease or permit and, if necessary, add special stipulations to be included in the lease or permit in order to protect other identified resource values, including a prohibition against occupancy of the surface of all or part of the lease or permit; or Encl. 3-2 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 62 of 65 W0-177 b. Recommend against, or refuse consent to, the proposed activity if it would seriously interfere with other resource values or with the purposes for which the lands are being administered, and special stipulations will not provide adequate mitigation. 3. Completion of review. Upon completion of review, the Forest Service will forward to the appropriate Bureau of Land Management office its recommendation, or its decision whether to consent, on the proposed leasing or permitting activity. c. Bureau of Land Management Action 1. Applications for noncompetitive leases and prospecting permits. a. Forest Service recommendation. Where the Forest Service recommends a course of action for a particular lease or permit application, the Bureau of Land Management will review the Forest Service analysis and exercise its independent judgment whether the recommended special stipulations are appropriate or whether the lease or permit should not be issued. Upon request from the Bureau of Land Management, the Forest Service will provide additional information or justification for its recom- mendations If agreement cannot be reachedi the matter will be submitted to the Washington, n.c., offices of both agencies. If the Bureau of Land Management concurs in the recommendation of the Forest Service, it will notify the applicant at the appropriate time of the Forest Service recommendation and its basis and the decision of the Bureau of Land Management based upon its independent judgment. b. Forest Service consent. Where the Forest Service forwards a decision concerning a particular lease or permit application based upon its statutory authority to consent to mineral leasing, the Bureau of Land Management will treat the parcel or area in accordance with the decision of the Forest Service. The Bureau of Land Management will inform the applicant at the appropriate time of the Forest Service decision and its basis and the speciific statutory authority of the Forest Service with regard to the particular application. 2. Noncompetitive simultaneous leasing and competitive leasing a. Forest Service recommendation. Where the Forest Service submits a recommendation concerning a particular parcel or area, the Bureau of Land Management will review the analysis of the Forest Service to determine whether the recommendation is appropriate. Upon request from the Bureau of Land Management, the Forest Service will provide additional information or justification for its recoJllillendation. If agreement cannot be reached, the matter will be submitted to the Washington, D.C. office of both agencies. If a particular parcel or area is Encl. 3-3 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 63 of 65 made available for leasing, the Bureau of Land Management will notify the prospective lessee at the appropriate time of the Forest Service recommendation and its basis and the decision W0-177 of the Bureau of Land Management based upon its independent judg- ment. b. Forest Service Consent. Where the Forest Service forwards a decision concerning a particular parcel or area based upon its statutory authority to consent to mineral leasing, the Bureau of Land Management will treat the parcel or area in accordance with the decision of the Forest Service. The Bureau of Land Management will inform the applicant at the appropriate time of the Forest Service decision and its basis and the specific statutory authority of the Forest Service with regard to the particular application. 3. Further processing. After the procedures described above are completed, the Bureau of Land Management will process all mineral lease applications, all prospecting permit applications, and the leasing of all parcels or areas in accordance with the regulations set out in 43 CFR Subchapter C and other relevant regulations, as supplemented by this agreement. 4. Final authorityo a. The Bureau of Land Management has the ultimate discretionary authority to decide whether a particular mineral lease or prospecting permit will be issued, except where the Forest Service exercises its statutory authority and does not consent to leasing. b. It is the general practice of the Bureau of Land Management to accept Forest Service recommendations. III. TIMELY PROCESSING Each agency will strive to process applications in a timely manner. Delays may occur, however, when a particular lease application requires extensive review under the National Environmental Policy Act of 1969-or when a particular office of either agency is burdened with an unusually large number of applications. IV. EFFECT ON PRIOR AGREEMENTS This Memorandum of Understanding implements the agreements contained in (1) an exchange of letters between the Secretaries of Agriculture and Interior in 1945 concerning leasing under the Mineral Leasing Act of 1920 of lands under Forest Service administration, and (2) a procedure, dated November 8, 1946, agreed to by the two Secretaries concerning leasing under section 402 of Reorganization Plan No. 3 of 1946. This Memorandum supersedes, to the extent inconsistent, the exchange of letters between the Acting Chief, Encl. 3-4 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 64 of 65 Date: W0-177 Forest Service, dated April 20, 1972, the Acting Director, Geological Survey, dated July 7, 1942 and the Acting Director, Bureau of Land Management, dated April 29, 1974. Date: /2.b" 1~ ----4,:....-~.---- Chief, Forest Setvice Encl. 3-5 Case 1:13-cv-00993-RJL Document 89-1 Filed 09/12/16 Page 65 of 65 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA SOLENEX LLC, Plaintiff, v. SALLY JEWELL, et al., Defendants. ) ) ) ) ) ) ) ) ) ) ) Civil Case No. 13-00993 (RJL) STATEMENT OF MATERIAL FACTS IN SUPPORT OF PLAINTIFF’S MOTION FOR SUMMARY JUDGMENT Pursuant to LCvR 7(h)(1), Plaintiff, Solenex LLC, hereby sets forth the material facts as to which it contends there is no genuine issue.1 1. In the late 1970s, this Nation was facing an energy crisis that had been brought on by its increasing consumption of oil, its failure to discover new domestic supplies of oil, and its growing dependency on foreign supplies of oil. S. Rep. No. 96-387, at 5–6, reprinted in 1980 U.S.C.C.A.N. 1751, 1755–56. In response to this crisis, Congress passed the Energy Security Act of 1980, which provides, inter alia: 1 These facts are supported by the documents in Defendants’ administrative record. See Dkt. # 84 (indexes to Defendants’ administrative record). Many of the documents (or excerpts thereof) in Defendants’ administrative record were included in the appendix that was previously filed in support of the parties’ earlier motions for summary judgment. See Dkt. ## 45, 48. To avoid duplication, previously filed documents will be cited as Dkt. # __ at __. Individual page citations will be to the page number assigned by this Court’s CM/ECF system. New documents will be cited as A0000:FS000000 (Forest Service), HC00000 (BLM), or a descriptive name will be used. Copies of the new documents will be filed with the Court in an appendix following completion of briefing. See Dkt. # 82. Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 1 of 26 2 It is the intent of the Congress that the Secretary of Agriculture shall process applications for leases of National Forest System lands and for permits to explore, drill, and develop resources on land leased from the Forest Service, notwithstanding the current status of any plan being prepared under [the National Forest Management Act of 1976]. 42 U.S.C. § 8855. 2. In 1980, the Lewis and Clark National Forest in Montana had a backlog of over 200 oil and gas lease applications, some of which had been pending since 1971. Dkt. # 45-10 at 13. 3. To alleviate this backlog of applications and to comply with the 1980 Energy Security Act of 1980, the Forest Service prepared, in conjunction with the BLM as a cooperating agency, a comprehensive, 162-page, environmental assessment (“EA”) for oil and gas leasing on non-wilderness lands administered by the Lewis and Clark National Forest (“1981 EA”). Dkt. # 45-10 at 11 to Dkt. # 45-11 at 45. 4. In preparing the 1981 EA, the Forest Service complied with the American Indian Religious Freedom Act (“AIRFA”), 42 U.S.C. § 1996, by consulting with the Blackfeet Tribe. Dkt. # 45-10 at 45; see Dkt. # 48-1 at 30–41 (documenting consultation with the Tribe from 1972 through 1990). 5. In the 1981 EA, six alternatives were considered. Dkt. # 45-10 at 48–49. These alternatives included a no-action alternative (Alternative 1) and an alternative that would lease all acreage with a no-surface occupancy (“NSO”) stipulation (Alternative 4). Id. Alternative 3 was ultimately selected. Id. at 78. Under this Alternative: ● Leases with surface occupancy would be issued only for accessible areas that could be protected; ● Lease denial or issuance of a NSO-lease would be recommended when an application is located entirely within an area that cannot be adequately protected; Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 2 of 26 3 ● Leases partially located in areas that cannot be protected would receive a NSO stipulation for those areas; ● All leases would be subject to the standard stipulations (listed in Appendix A of the 1981 EA); additional stipulations (listed in Appendix B of the 1981 EA); and the comprehensive surface use guidelines in Sections 6C and 6D of the 1981 EA; and ● After lease issuance, any proposed oil and gas activities would be fully analyzed under NEPA. Id. 6. On February 18, 1981, the Forest Service issued a Decision Notice (“DN”) and Finding of No Significant Impact (“FONSI”), approving implementation of Alternative 3. Dkt. # 45-10 at 9–10. Adversely affected parties had 45 days to file an appeal. Id. at 10. No appeals were filed regarding the DN and FONSI. Dkt. # 45-4 at 13. 7. Following the DN and FONSI, the Forest Service conducted additional site- specific analysis on the acres recommended for leasing to determine the specific stipulations and mitigation requirements to be applied on an acre-by-acre basis. Dkt. # 45-4 at 13. 8. On June 9, 1981, the Forest Service grouped 6,247 acres from expiring leases to form lease tract NW-21 and, based upon the 1981 EA and its site-specific analysis, recommended to the BLM that the tract be leased with special stipulations. Dkt. # 45-9 at 31–32. 9. Based upon the Forest Service’s recommendation, the BLM designated lease tract NW-21 as “Parcel No. MT 73” for the upcoming September 1981, noncompetitive lease drawing. Dkt. # 45-9 at 30; see generally, 45 Fed. Reg. 35,156, 35,163 (May 23, 1980) (describing the BLM’s “lottery system” for noncompetitive leases). 10. On April 6, 1982, the BLM advised Sidney M. Longwell that his application for Parcel No. MT 73 obtained a priority at the September 1981 lease drawing. Dkt. # 45-9 at 30. Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 3 of 26 4 The BLM further advised that the application would become an offer to lease upon Mr. Longwell’s payment of the first year’s rental in the amount of $1 per acre, i.e., $6,247.00. Id. 11. On May 24, 1982, after receiving Mr. Longwell’s payment of the first year’s rental, the BLM accepted Mr. Longwell’s offer to lease and issued lease M-53323 to Mr. Longwell, which became effective on June 1, 1982. Dkt. # 45-9 at 19. Prior to the BLM’s issuance of the lease, the U.S. Geological Survey re-verified that the lands to be leased were not within a known geologic structure. Id. No protests were filed regarding the BLM’s issuance of the lease to Mr. Longwell. Dkt. # 45-4 at 13. 12. Mr. Longwell was 44 years old when the lease was issued; he is now 78 years old. Dkt. # 24-2 at 32. 13. The lease covered 6,247 contiguous acres in Glacier and Flathead Counties, Montana. The leased acres were basically surrounded by the Lewis and Clark National Forest, although Glacier National Park formed part of the western boundary, and private lands formed part of the northern boundary. Dkt. # 45-12 at 12 (map depicting lease and surrounding lands); Dkt. # 50-1 at 2 (same). 14. Section 1 of the lease granted Mr. Longwell: [E]xclusive right and privilege to drill for, mine, extract, remove and dispose of all of the oil and gas deposits, except helium gas, in the lands leased, together with the right to construct and maintain thereupon, all works, buildings, plants, waterways, roads, telegraph or telephone lines, pipelines, reservoirs, tanks, pumping stations, or other structures necessary to the full enjoyment thereof, for a period of 10 years, and so long thereafter as oil or gas is produced in paying quantities …. Dkt. # 45-12 at 2. 15. In return for those exclusive rights, Section 2(d)(1) of the lease obligated Mr. Longwell to pay rentals and royalties to the United States. Dkt. # 45-12 at 2. Prior to Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 4 of 26 5 “discovery,” Section 2(d)(1) required the payment of rental of $1 per acre for the first five years and $3 per acre for the second five years. Id. After “discovery,” a minimum royalty of $1 per acre or a royalty of 12½ percent of the value of the production was due. Id. 16. Section 2(j) obligated Mr. Longwell to “exercise reasonable diligence in drilling and producing the wells herein provided for unless consent to suspend operations temporarily is granted by the lessor ….” Dkt. # 45-12 at 2 (emphasis added). 17. Section 2(q) obligated Mr. Longwell “to take such reasonable steps as may be needed to prevent operations on the leased lands from unnecessarily” damaging the surface, natural resources and improvements, including objects of historic value. Dkt. # 45-12 at 2. 18. The lease also contains a surface disturbance stipulation and a stipulation for lands under the jurisdiction of the Department of Agriculture. Dkt. # 45-12 at 3–5. 19. The lease also contained standard stipulations for the protections of the surface, cultural and paleontological resources, endangered and threatened species, esthetics, etc. Dkt. # 45-12 at 6. 20. In accordance with the 1981 EA, the lease was also subject to the following special stipulations: ● Eighteen percent of the lease was subject to a NSO stipulation; ● Forty-eight percent of the lease was subject to a surface use timing stipulation for elk winter range. Under this stipulation, surface occupancy for pre-production activities, such as drilling, would be allowed only from May 1 to December 1. ● Fifty-seven percent of the lease was subject to a limited surface use stipulation, which strictly controlled surface use or occupancy within identified areas. ● One hundred percent of the lease was subject to an activity coordination stipulation, which allows the imposition of special time and space Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 5 of 26 6 conditions to be imposed on activities for the protection of threatened and endangered species. Dkt. # 45-12 at 7–9. 21. The lease also contained an additional lease term that was provided for by Pub. L. No. 97-78, which was signed into law by the President on November 16, 1981. Dkt. # 45-12 at 10. 22. On June 2, 1983, Mr. Longwell assigned the lease to America Petrofina Company of Texas (25%), Petrofina Delaware, Inc. (25%), and AGIP Petroleum Company, Inc. (50%) (hereinafter collectively and individually referred to as “Fina”). Dkt. # 45-9 at 17–18; Dkt. # 24- 2 at 33. The BLM approved this assignment on December 9, 1983, effective July 1, 1983. Dkt. # 45-9 at 17. In making this assignment, Mr. Longwell reserved a production payment “to be paid out of five percent of ninety-five percent (5% of 95%) of the value of all the oil and gas which is produced and sold from lands covered by the lease ....” Dkt. # 24-2 at 33. 23. On or about November 18, 1983, and in full compliance with all relevant statutes and regulations, Fina submitted a surface use plan and an application for permit to drill (“APD”) the Federal South Glacier #1-26 well on the lease in Section 26, T30N, R13N, PMM, Glacier County, MT. Dkt. # 45 at 8–24; Dkt. # 45 at 26. The proposed well site is approximately 2 miles from private land, approximately 3 miles southeast of the Great Northern Railroad, Glacier National Park, and U.S. Highway 2, and approximately 9 miles southwest of East Glacier, Montana. Dkt. # 45 at 41; Dkt. # 45-1 at 17; Dkt. # 50-1 at 2 (map depicting well site location). Specifically, Fina proposed drilling a 13,510-foot exploratory well. Dkt. # 45 at 8. Fina did not propose any production activities. Dkt. # 45 at 40. 24. Contemporaneously, Fina submitted a cultural resource inventory report, prepared by Historical Research Associates, that documented the survey for cultural resources performed Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 6 of 26 7 on the well site and the three proposed access routes. No cultural resources were located during the survey. Dkt. # 45 at 16–24. 25. The area of the proposed well site has a very high potential for discovery of natural gas and a somewhat lesser potential for discovery of oil. Dkt. # 45 at 44–45. Specifically, The proposed well site is situated within the Northern Disturbed Belt[,] which is a local portion of the Western Overthrust Belt. The Western Overthrust Belt is a north-south trending geologic province which has yielded substantial amounts of oil and gas in southwestern Alberta for decades. (Proven reserves of natural gas in the Alberta portion of the Overthrust Belt exceed 15 trillion cubic feet)…. [T]he Overthrust Belt has yielded major discoveries of oil and gas in Utah and Wyoming. * * * The USGS has estimated that as much as a billion barrels of undiscovered crude oil and 25 trillion cubic feet of natural gas may be recoverable from the Montana portion of the Overthrust Belt. Id. 26. The area of the proposed well site was designated by Forest Service as a roaded area subject to multiple use management, and was determined not suitable for wilderness designation. Dkt. # 45-1 at 17. Major uses in the area included automobile traffic (viewing), snowmobiling, livestock grazing, hunting, and firewood gathering. Dkt. # 45 at 42; Dkt. # 45-1 at 17 n.3 (noting that the area was within a livestock grazing allotment and the area was used for motorized recreation). 27. In November 1983, the BLM and the Forest Service began reviewing the surface use plan and APD under all applicable laws and responsibilities. See Dkt. # 45 at 26. 28. On December 2, 1983, the Blackfeet Tribal Business Council unanimously approved Resolution 94-84, which provided: Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 7 of 26 8 The Blackfeet Tribal Business Council is desirious [sic] of entering into a joint venture agreement with Forest Oil Corporation to acquire any and all rights to the surface and minerals within the Ceded Strip area as identified in all Treaties, Presidential Proclamations and other documents between the Blackfeet Tribe and the Congress of the United States[.] Dkt. # 45-12 at 13–14. The “ceded strip” refers to the area of the Lewis and Clark National Forest where the lease and proposed well site were located. See Dkt. # 24-2 at 1–2; Dkt. # 45-2 at 27–28. This area is also commonly referred to as the Badger-Two Medicine (“B2M”) area, after two streams in the area. Importantly, leasing of the B2M area first began in the late 1940s and seismic exploration activities began in the mid-1950s and continued through the 1960s. 1986 Forest Plan at 6-22. 29. In January 1985, the Forest Service and the BLM issued a 318-page, joint EA (“1985 EA”) for the surface use plan and the APD. Dkt. # 45 at 31 to Dkt. # 45-1 at 12 (excerpts of 1985 EA); A0003:FS000037–354 (entire 1985 EA). In preparing the 1985 EA, the Forest Service and BLM expressly incorporated the analysis provided in the 1981 EA in formulating alternatives. A0003:FS000070–71. In accordance with the 1981 EA, the agencies considered a no action alternative, which would deny the APD (Alternative 1). A0003:FS000076. The agencies also considered 6 other alternatives. Id. Based upon their comprehensive analysis, the agencies selected as their preferred alternative to approve the surface use plan and APD, but only after imposing additional conditions of approval to minimize any adverse environmental effects. A003:FS000205–241. 30. Based on the comprehensive 1985 EA, the Forest Service issued a decision approving the surface use plan, Dkt. # 45 at 29–30, and the BLM issued a Record of Decision and FONSI approving the APD. Dkt. # 45 at 26–28. The conclusion of the two agencies was that the proposed project, as limited by the lease stipulations and the additional conditions of Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 8 of 26 9 approval imposed by the agencies, should be approved because the proposed drilling activities could be performed without causing a significant environmental impact. Dkt. # 45 at 26–30; Dkt. # 45-1 at 3–12 (listing conditions of approval). Importantly, activities under the surface use plan and APD would not affect the Blackfeet Tribe’s reserved rights in the “ceded strip” and “[n]o religious sites or activities were identified in the project area ….” Dkt. # 45 at 46 to Dkt. # 45-1 at 1; see also A0003:FS000134; A0003:FS000177–78; A0003:FS000185 (demonstrating consultation with the Blackfeet Tribe and compliance with both the NHPA and the AIRFA). 31. The BLM’s approval of the APD was appealed to the Interior Board of Land Appeals (“IBLA”). Dkt. # 45-1 at 16. 32. On August 9, 1985, the IBLA generally affirmed the BLM’s use of an EA to approve the APD, based upon the lease stipulations and the additional conditions of approval imposed by the agencies. Dkt. # 45-1 at 19 to Dkt. # 45-2 at 7; Glacier–Two Medicine All., 88 IBLA 133, 139–47 (1985). The IBLA did, however, set aside the approved APD and remand for further consideration of four issues. Dkt. # 45-2 at 8–15; Glacier–Two Medicine All., 88 IBLA at 148–55. 33. On August 16, 1985, in light of the IBLA’s decision, Fina requested a temporary suspension of the lease to toll the running of the primary term while the BLM addressed the remanded issues. Dkt. # 45-9 at 15–16. 34. On November 13, 1985, the BLM suspended the lease, effective October 1, 1985. Dkt. # 45-9 at 14. The lease was then kept in suspension for more than 30 years, until the Secretary cancelled the lease in March 2016. Dkt. # 52; Dkt. # 68-1. 35. In June 1986, the Forest Service approved the 1986 Forest Plan. See Dkt. # 45-2 at 17–44 (Record of Decision approving the 1986 Forest Plan (“1986 ROD”)). Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 9 of 26 10 36. The 1986 Forest Plan established management direction through standards and guidelines and mitigation and monitoring requirements, to minimize any effects of oil and gas related activity on the Lewis and Clark National Forest, including the area where the lease was located. Dkt. # 45-2 at 19, 39, 42–43. In approving the 1986 Forest Plan, the Forest Service specifically concluded that exploration for oil and gas was in the public interest and should continue because of the protective measures provided in the 1986 Forest Plan, which expressly incorporated the restrictions imposed by the 1981 EA. Dkt. # 45-2 at 27–28; Dkt. # 45-4 at 14; 1986 Forest Plan at 6–22. In approving the 1986 Forest Plan, the Forest Service fully complied with NEPA and other laws by preparing a comprehensive Final EIS (“1986 FEIS”) A0005:FS000379–1080 (1986 FEIS, Volume I). The Forest Service also fully complied with the AIRFA by consulting with the Blackfeet Tribe. See HC00644–6527 (margin notes by unknown author in original). 37. On April 13, 1987, after addressing the remanded issues, the BLM reactivated the approved APD by issuing a DN and FONSI. Dkt. # 45-2 at 45–53. That same day, the Forest Service concurred in the decision to reactivate the approved APD. Id. at 54–55. In so doing the agencies fully considered the 1986 Forest Plan and accompanying 1986 FEIS; in which the Forest Service had thoroughly evaluated the environmental effects of oil and gas exploration and development on the Lewis and Clark National Forest, including the area where the lease was located. Id. at 51–53. The BLM also considered the recent district court opinions in Conner v. Burford, 605 F. Supp. 107 (D. Mont. 1985) and Bob Marshall Alliance v. Watt, 685 F. Supp. 1514 (D. Mont. 1986). Dkt. # 45-2 at 51–53. 38. The BLM’s decision to reapprove the APD was appealed to the IBLA. See Dkt. # 45-2 at 56. Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 10 of 26 11 39. On July 10, 1987, the Forest Service asked the BLM to move the IBLA for a voluntary remand of the approved APD. See Dkt. # 45-2 at 56. 40. On July 28, 1987, based upon the Forest Service’s request, the BLM filed a motion for a voluntary remand of the approved APD. See Dkt. # 45-2 at 57. 41. On July 31, 1987, the IBLA granted the BLM’s motion and vacated the BLM’s decision approving the APD and remanded to the BLM for further action. Dkt. # 45-2 at 57. 42. On August 14, 1987, the BLM advised Fina that the suspension would remain in effect until the completion of an additional environmental analysis. Dkt. # 45-2 at 58. 43. On February 23, 1988, notice was published in the Federal Register that the Forest Service decided to combine the study for Fina’s surface use plan and APD with a surface use plan and APD submitted by Chevron on a nearby lease. 53 Fed. Reg. 5,290 (Feb. 23, 1988). The notice further provided that a draft EIS was expected to be released for public comment within 12 months, and that a Final EIS was expected by April 1989. Id. 44. On October 23, 1989, Notice of Availability of the draft EIS was published in the Federal Register. 54 Fed. Reg. 43,188 (Oct. 23, 1989). The notice solicited comments and advised that the draft EIS: [A]nalyzes the impacts of proposed drilling applications submitted by Chevron USA, near Badger Creek, and Fina Oil and Chemical Company, near Hall Creek. Based on the issues and concerns identified during the scoping process, the [draft EIS] focuses on impacts to water resources, air quality, Glacier National Park resources, adjacent Bob Marshall and Great Bear Wilderness, the Badger-Two Medicine Roadless area, wildlife and fisheries (including the grizzly bear), vegetation, outdoor recreation and visual resources, archaeological resources, Blackfeet Tribe reserved rights and traditional religious practices, local economic and social conditions, including public health and safety associated with the drilling proposals. The analysis addresses 33 combinations of alternatives, including roaded access, helicopter mobilization of the drilling projects, and no action. The [draft] EIS also addresses each of the exploration proposals independently. The [draft] EIS Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 11 of 26 12 preferred alternative is to permit the exploration projects, utilizing roaded access and mitigation requirements that minimize adverse environmental effects. Id. at 43,188–89. 45. On December 4, 1990, after all the comments were considered, a comprehensive, 982-page, Final EIS for the Fina and Chevron proposals was issued (“1990 FEIS”). Dkt. # 45-3 at 1 to Dkt. # 45-4 at 14 (excerpts of 1990 FEIS). The 1990 FEIS was tiered to the 1986 Forest Plan and accompanying 1986 FEIS, and incorporated the 1981 EA. Dkt. # 45-4 at 19. In the 1990 FEIS, the agencies considered seven alternatives with respect to Fina’s surface use plan and APD, including a no action alternative. Dkt. # 45-5 at 7–8. In the 1990 FEIS, the BLM recognized the lack of authority to cancel the lease. 1990 FEIS Chapter II at 11–14, 37. 46. Based upon the 1990 FEIS, the Forest Service and the BLM issued a joint Record of Decision approving Fina’s surface use plan and APD (“1991 ROD”). Dkt. # 45-4 at 15 to Dkt. # 45-5 at 30. In so doing, the agencies fully complied with all applicable statutes, regulations, policies, and trust responsibilities. Dkt. # 45-4 at 20; see Dkt. # 45-5 at 19 (documenting compliance with the NHPA and the AIRFA). In fact, the agencies approved an action alternative only after concluding that there were no sites of properties eligible for listing on the National Register of Historic Places that would be affected by the approved project. Dkt. # 45-5 at 13–14. This conclusion was made after consulting with the Blackfeet Tribe and the State Historic Preservation Officer. Id.; see id. at 6, 19 (describing efforts to consult with the Blackfeet Tribe). 47. On March 6, 1991, the BLM notified Fina that the APD was approved subject to compliance with all lease stipulations and additional mitigation measures that were imposed as conditions of approval. Dkt. # 45-5 at 31–36. These conditions of approval included measures Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 12 of 26 13 to protect cultural resources. Id. at 36. The BLM also advised that no activities could occur prior to July 1, 1991. Id. at 31. 48. On March 8, 1991, notice that the Forest Service and the BLM had approved Fina’s surface use plan and APD was published in the Federal Register. 56 Fed. Reg. 9,935, 9,936 (Mar. 8, 1991). The notice further provided that Chevron’s project had not been approved. Id. 49. Around April 1991, the Forest Service received appeals, including an appeal from the Blackfeet Tribe, regarding the approved surface use plan. The Tribe appealed on, inter alia, its belief that it still owned the mineral resources in the ceded strip. Dkt. # 45-9 at 33–39. The Tribe did not appeal on the ground that the area had religious and/or cultural significance. Id. The Forest Service denied all of the appeals. Dkt. # 45-6 at 7. 50. Around April 1991, the BLM also received requests for state director review of the BLM’s approval of the APD. Dkt. # 45-6 at 7. These requests were denied. Id. Appeals were then filed with the IBLA. Id. 51. On July 18, 1991, the BLM once again moved for a voluntary remand. Dkt. # 45- 9 at 8; Dkt. # 45-6 at 7. 52. On August 5, 1991, the IBLA granted the BLM’s motion for voluntary remand, dismissed the appeal without prejudice, and remanded for further proceedings. Dkt. # 45-5 at 37. 53. On August 30, 1991, the BLM reversed its decision approving the APD and began its own independent study of the surface-related issues, even though it had previously adopted the Forest Service’s approval of the surface use plan. Dkt. # 45-9 at 8–9. Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 13 of 26 14 54. On December 4, 1992, after the BLM completed its independent study of the surface-related issues regarding Fina’s APD and surface use plan, the BLM asked for secretarial- level approval of Fina’s APD because of the unreasonable delay that had already occurred: We would like to get the issues involved in this case resolved once and for all. The decisions concerning the Fina well have been delayed long enough. A timely resolution would benefit all parties involved, including the applicant, the Federal government, the appellants and the American taxpayers. We would like the Secretary to render the final decision for the Fina ROD, thereby allowing all remaining issues to be addressed in Federal District Court. Dkt. # 45-9 at 68–69 (emphasis added). 55. On January 14, 1993, the Assistant Secretary, Department of the Interior (“DOI”), concurred in the Record of Decision issued by the BLM approving Fina’s APD (“1993 ROD”). Dkt. # 45-5 at 40 to Dkt. # 45-6 at 1–33; Dkt. # 45-6 at 3 (“I hereby concur with approval of the Fina APD.”). In so doing, the Assistant Secretary recognized the lack of authority to cancel the lease. Dkt. # 45-6 at 22. The Assistant Secretary also determined that the BLM had fully complied with all applicable statutes, regulations, policies, and trust responsibilities. Dkt. # 45-6 at 13, 24; see id. at 8 (consultation with the Blackfeet tribe); id. at 19–20 (cultural issues and reserved rights). The Assistant Secretary’s concurrence constituted a final decision for the Secretary. Dkt. # 45-6 at 2. 56. The 1993 ROD authorized: Fina to build 4.5 miles of access road on National Forest Land to drill a single exploratory well to determine if geologic structures contain accumulations [of] oil and/or natural gas. If the well is dry, the access road and well pad would be reclaimed to as near natural conditions as possible. Should the well encounter commercial quantities of oil and/or gas, additional environmental analysis will be conducted. Dkt. # 45-6 at 2. Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 14 of 26 15 57. This authorization was subject to Fina complying with all lease stipulations, mitigation and monitoring requirements, and additional mitigation measures that were imposed as conditions of approval. Dkt. # 45-6 at 3; see id. at 25–26 (mitigation and monitoring requirements); id. at 27–33 (listing conditions of approval). The conditions of approval limited activities from July 1 through November 30 each year, to minimize the effects on wildlife. Dkt. # 45-6 at 31. The conditions of approval included measures to protect any cultural/religious resources. Id. at 33. 58. Importantly, activities under the approved surface use plan and the approved APD would not affect any identified cultural/religious resources or the Blackfeet Tribe’s reserved rights: I agree with the Forest Supervisor’s finding that [the selected] alternative … will result in no effect to identified sites or properties that are eligible for listing on the National Register of Historic Places. The identification effort for historic properties included a literature review, field inventory, and interviews with Blackfeet Traditionalists. The interviews did not result in the identification of any properties having significance as traditional cultural properties as defined by the National Historic Preservation Act. These efforts, taken as a whole, resulted in a determination that no properties included on or eligible for inclusion to the National Register of Historic Places would be affected by the proposed action. The Montana State Historic Preservation Office commented on the identification effort and further stated that they had no information which disputed this finding. Compliance with the implementing regulations of Section 106 of the National Historic Preservation Act has, therefore, been completed. Like the Forest Supervisor, I also recognize that the area is used by some members of the Blackfeet Tribe for religious purposes and for other uses, including the exercise of rights reserved in the Agreement of 1896. Past use includes motorized access for hunting, wood cutting and recreation. Other uses of the area include motorized winter recreation by snowmobiles. Not until 1988, with implementation of the Forest Travel Plan, were vehicle restrictions imposed in the area. As stated in the [1990 FEIS] (Chapter IV-150), Blackfeet traditionalists view all action alternatives as negatively impacting their culture and religion. However, they have been reluctant to discuss any specific potential effects caused by the project to the practice and belief in their traditional religion ([1990 FEIS], Chapter IV-152). I have considered what actions could be undertaken to reduce the impact of the project on traditional practitioners. Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 15 of 26 16 Mitigation measures that will minimize visual, auditory, and physical changes have been developed and are included in Appendix A of this ROD. In case traditional practitioners choose to use the area around the wellsite regardless of the disturbance, notice will be made in local newspapers of planned drilling activity. This will enable religious practitioners to plan their activities so they can be conducted at locations and during time periods when the effects of the project are not evident. Visual intrusions which might affect traditional religious practices will be minimized by employing a professional landscape architect to review all project location plans and to develop mitigation measures. In summary, I concur with the Forest Supervisor's decision to allow roaded access to the wellsite, recognizing that there may be some unavoidable impacts to traditional religious practitioners. I agree with the Forest Supervisor’s determination that this decision does not change a person’s freedom of religious belief. Mitigation measures that limit access and reduce noise levels will help to reduce project impacts on those who choose to practice traditional religion in the general area of the well site. Dkt. # 45-6 at 19–20 (all emphasis added). 59. By concurring in the 1993 ROD, the Assistant Secretary, on behalf of the Secretary, also officially acknowledged that any legal violations that may have occurred prior to lease issuance had been corrected by, inter alia, the 1990 FEIS and the 1986 FEIS: I agree with the Forest Supervisor’s [1991] response that no court has held the Fina lease invalid. Until such action occurs or there is some other administrative action by the [DOI-BLM], which issued the lease, the Forest Service must recognize the rights of the leaseholder. Furthermore, even if subsequent litigation on Fina’s lease resulted in a holding similar to the holding in Conner v. Burford, that holding would not invalidate the leases but would rather require full compliance with NEPA ... prior to any surface-disturbing activities. This has been clearly accomplished with the comprehensive analysis in [the 1990 FEIS], as tiered to the [1986 FEIS].... The [1990] FEIS analyzed the effects of numerous alternatives, including alternatives which would require changes to the existing lease terms and conditions of approval, and analyzed the effects of the no action alternative…. By analyzing the effects of the no action alternative in relation to the effects of action alternatives, including the effects of exploration as well as possible future production and development, I have been able to consider whether I should recommend, in addition to denying the current proposal, that lease terms be Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 16 of 26 17 changed or the lease cancelled. I have no authority to cancel or change lease terms, but I can recommend that these actions be considered based on this environmental review. Under Alternative E (APD Not Approved) Fina’s APD would be denied. Should the Government determine to cancel the Fina lease, three courses of action could be taken to secure from the lessee any rights granted in the original lease transaction. These include buying back the leases, condemning the leases, and enacting legislation. In a buy back situation, the government would offer the lessees (in this case Fina) a cash settlement for relinquishing the leases. Condemnation proceedings could be initiated by the Government to prevent enjoyment of lease rights. It would have to be shown that proposed operations were environmentally unacceptable before initiating condemnation proceedings. Lastly, legislation could be enacted by Congress to stop lease development. Based on the environmental effects disclosed in th[e] [1990] FEIS, I concur in the Forest Supervisor’s determination not to select Alternative E (no action) which would deny the Fina Surface Use Plan. I also do not recommend lease cancellation or a change in lease terms to require 100 percent no surface occupancy. In making my decision, I considered the dual objectives of conservation of our physical and biological surface resources and providing for opportunity to explore and develop oil and gas resources. I concluded that the selected alternative provides for meeting these dual objectives…. [The 1990 FEIS] is intended to fully meet the requirements stated in the Ninth Circuit Court’s ruling in Conner v. Burford. I [also] agree with the Forest Supervisor’s determination that the requirements of Conner v. Burford are met by the [1986 FEIS] which considered additional leasing alternatives which did not take into consideration the commitments embodied in the existing leases .... Dkt. # 45-6 at 22–23 (all italics added). 60. On June 4, 1993, after a change in administrations, the new Secretary of the Interior, Bruce Babbitt, sought to reverse what his predecessor had done for policy reasons. For example, despite acknowledging the approved APD, then-Secretary Babbitt advised Fina that he was continuing the suspension of the lease. Dkt. # 45-6 at 34–35. Then-Secretary Babbitt further advised that the suspension would remain in effect for one year. Id. at 35. The stated purpose for continuing the suspension was in aid of proposed legislation regarding the area where the lease was located. Id. Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 17 of 26 18 61. On May 4, 1994, although no action had been taken on any proposed legislation regarding the area where the lease was located, the DOI/BLM suspended the lease for another year. Dkt. # 45-9 at 12. 62. On May 19, 1995, although no action had been taken on any proposed legislation regarding the area where the lease was located, the DOI/BLM suspended the lease for another year. Dkt. # 45-6 at 36. 63. On May 17, 1996, the Forest Service requested that the BLM suspend the lease for purported NHPA purposes. Dkt. # 45-9 at 11. 64. On June 11, 1996, based upon the Forest Service’s request, the BLM suspended the lease for one year, effective July 1, 1996. Dkt. # 45-6 at 37–38. 65. On February 18, 1997, the Forest Service requested that the BLM suspend the lease for purported NHPA purposes. Dkt. # 45-6 at 39. 66. On April 18, 1997, based upon the Forest Service’s request, the BLM suspended the lease for one year, effective July 1, 1997. Dkt. # 45-6 at 44–45. 67. On July 15, 1998, the BLM advised Fina that the lease was suspended again, effective July 1, 1998, and that the suspension would remain in effect indefinitely, “until conclusion of the historic property review under Section 106 of the National Historic Preservation Act.” Dkt. # 45-6 at 46–47. 68. On April 5, 1999, Fina, “fed up with the Defendants’ endless delay,” assigned the lease back to Mr. Longwell. Dkt. # 24-2 at 33. The BLM approved this assignment on June 15, 2000, effective July 1, 2000. Id. 69. On October 11, 2001, in response to a congressional inquiry, the BLM advised: “[w]e recognize that environmental reviews, and administrative and judicial review processes Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 18 of 26 19 have extended resolution of action on Mr. Longwell’s APD way beyond any reasonable time line.” Dkt. # 45-6 at 48–49 (emphasis added). The BLM further advised: “[w]e realize that an attempt to reach closure on this case has taken many years and share Mr. Longwell’s frustration with the extraordinary delays involved in the process.” Id. (emphasis added). 70. On April 19, 2002, in response to an inquiry by Mr. Longwell as to whether his approved APD was still valid, the BLM responded with “[t]he answer is yes, you have a valid permit.” Dkt. # 45-6 at 55. 71. In June 2003, the Forest Service began the scoping process for NorthWestern Corporation’s proposal to construct a 12-inch gas pipeline parallel to its existing 8-inch gas pipeline along the northwest boundary of the Lewis and Clark National Forest. Dkt. # 45-12 at 42, 53. The new pipeline would be buried 30 feet south of an existing line and would cross approximately 3 miles of the Lewis and Clark National Forest and approximately 2 miles of the lease. Dkt. # 45-12 at 42–44. The need for the pipeline was the increasing demand for energy in Montana. Id. at 42. 72. One year later, in June 2004, the Forest Service issued a DN and FONSI approving construction of the NorthWestern Corporation’s pipeline. Dkt. # 45-12 at 40–67. Importantly, the Forest Service determined that construction of the pipeline “w[ould] not have an adverse effect on any known or listed or eligible historic places.” Id. at 56–57. In fact, the Forest Service reported that consultation with the Blackfeet Tribe “identified no properties of traditional cultural interest to the tribe on the pipeline route or temporary construction sites.” Id. at 57–58. 73. In 2004, Mr. Longwell formed Solenex LLC, a Louisiana limited liability corporation. Dkt. # 24-2 at 34. Mr. Longwell is the Manager of Solenex. Id. at On July 9, Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 19 of 26 20 2004, Mr. Longwell assigned the lease and concomitant rights under the approved APD to Solenex. Id. The BLM approved the assignment, effective February 1, 2005. Id. 74. Between 2005 and 2013, the Forest Service and the BLM continued their use of the NHPA as a pretext for not lifting the suspension on the lease and approved APD. See Dkt. # 24-2 at 21–25. 75. For example, on April 15, 2011, Solenex sent a letter to the Forest Service reminding the Forest Service that the lease was a valid contract, that the approved APD remains valid, and that Solenex wished to commence drilling. Dkt. # 24-2 at 34, 38. 76. On May 27, 2011, the Forest Service responded to Solenex’s April 15, 2011 letter advising that the lease and approved APD would remain suspended until it completed the NHPA process. Dkt. # 45-6 at 62. 77. On February 16, 2012, Solenex sent a letter to the Forest Service expressing its desire to develop the lease under the approved APD and again requesting a timeline for when drilling operations may commence. Dkt. # 45-7 at 14. Solenex further explained: [I]t is important to proceed with the development of this lease based on the amount of drilling activity in the area, including that on the nearby Blackfeet reservation, as well as the need to develop domestic energy resources on both public and private lands as outlined by President Obama in his State of the Union Address. Id. 78. On March 27, 2012, the Forest Service responded to Solenex’s February 16, 2012 letter by advising that the lease and approved APD would remain suspended until it completed the NHPA process. Dkt. # 45-6 at 63 (referencing enclosed May 27, 2011 letter). 79. On June 28, 2013, Solenex filed this case against Defendants seeking to compel agency action “unlawfully withheld or unreasonably delayed” under 5 U.S.C. § 706(1). Dkt. # 1 at Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 20 of 26 21 7–10. Solenex requested either an order compelling Defendants to immediately lift the suspension or an order compelling Defendants to complete any remaining administrative action necessary to lift the suspension within 30 days. Id. at 10. 80. On September 9, 2013, Defendants filed an Answer to Solenex’s Complaint. Dkt. # 8 at 1–8. In answering Solenex’s Complaint, Defendants never suggested or hinted that the lease may have been issued prematurely in violation of any applicable statute, regulation, policy, or trust responsibility. Id. 81. In January 2014 and April 2014, Defendants forced Solenex to travel to Montana— at considerable expense to Solenex—to attend NHPA meetings that Defendants represented were necessary before the suspension could be lifted. Dkt. # 45-7 at 12; Dkt. # 45-8 at 1–30. During those meetings, Defendants never suggested or hinted that the lease may have been issued prematurely in violation of any applicable statute, regulation, policy, or trust responsibility. Dkt. # 45-8 at 1–30. 82. On July 7, 2014, Solenex filed a motion for summary judgment and supporting memorandum demonstrating that Defendants had unreasonably delayed in lifting the 29-year-long suspension. Dkt. ## 24, 24-1. 83. On August 26, 2014, Defendants filed their own motion for summary judgment and supporting memorandum. Dkt. ## 32, 33, 34-1. In their motion and supporting memorandum, Defendants argued that this Court was powerless to do anything about their 29-year-long suspension. Dkt. # 34-1 at 22–25. In the alternative, Defendants argued that they had not unreasonably delayed in lifting the suspension. Id. at 25–28. In their summary judgment filings, Defendants never suggested or hinted that the lease may have been issued prematurely in violation Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 21 of 26 22 of any applicable statute, regulation, policy, or trust responsibility. See Dkt. ## 32, 32-1, 32-2, 34- 1, 43, 43-1. Id. 84. In April 2015, Defendants forced Solenex to travel to Montana—at considerable expense to Solenex—to attend another NHPA meeting that Defendants represented was necessary before the suspension could be lifted. See Dkt. # 47 at 2. During that meeting, Defendants never suggested or hinted that the Lease may have been issued prematurely in violation of any applicable statute, regulation, policy, or trust responsibility. H0047:FS006555–64. 85. On June 10, 2015, this Court heard oral arguments on the pending motions for summary judgment. During that hearing, Defendants continued to maintain their position that this Court was powerless to do anything about their 29-year-long suspension. Defendants also continued to maintain their position that they had not unreasonably delayed in lifting the suspension. At no time during that hearing did Defendants suggest or hint that the lease may have been issued prematurely in violation of any applicable statute, regulation, policy, or trust responsibility. Transcript of June 10, 2015 Oral Argument. 86. On July 27, 2015, this Court ruled that Defendants’ 29-year delay was unreasonable as a matter of law: [S]ince the APD was first approved in 1985, the lease has been suspended for more than 29 years! No combination of excuses could possibly justify such ineptitude or recalcitrance for such an epic period of time. Under the APA, administrative agencies have a duty to decide issues presented to them within a reasonable time, 5 U.S.C. § 555(b), and reviewing courts have a duty to “compel agency action unlawfully withheld or unreasonably delayed.” 5 U.S.C. § 706(1) …. By any measure, defendants’ 29-year delay in reviewing plaintiff’s suspended lease, and reaching a final determination, is “unreasonable delay” within the meaning of the APA. Dkt. # 52 at 2–3 (all emphasis in original) (footnote omitted). Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 22 of 26 23 87. Based upon this ruling, this Court granted summary judgment in favor of Solenex and ordered Defendants to submit, within 21 days, “a schedule for the orderly, expeditious resolution of the decision whether to lift the suspension of plaintiff’s lease.” Dkt. # 52 at 5. This Court further advised that: This schedule shall include (1) the defendants’ proposed tasks remaining to be completed and rationales for why those tasks are legally necessary, and (2) an accelerated timetable for completing those tasks still necessary to expeditiously resolve the issues regarding plaintiff’s suspended lease. Id. 88. On August 17, 2015, Defendants submitted their proposed schedule. Dkt. # 53. In their proposed schedule, Defendants suggested—for the first time—that they may initiate a process for cancelling the lease, which they claimed could be completed by March 30, 2016. Id. at 2. Although Defendants argued that a lease could be cancelled if improperly issued, they failed to articulate any basis as to why Solenex’s lease may have been improperly issued. Id. In the alternative, Defendants suggested that they would need almost two more years to complete another NEPA process before they could lift the suspension. Id. 89. After Solenex filed a response demonstrating that Defendants’ proposed schedule was a pretext for further unlawful delay (Dkt. # 54), this Court held a status conference on October 6, 2015. Transcript of October 6, 2015 Status Conference. 90. Following that status conference, this Court ruled that Defendants’ proposed schedule was “clearly unacceptable” because it “would not only draw out this process another two years potentially, but also lacked rationales for the necessity of certain proposed steps as ordered.” Dkt. # 57 at 2. Accordingly, this Court ordered Defendants to file a memorandum by November 23, 2015: Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 23 of 26 24 [T]hat sets forth their decisions, and the factual and legal bases therefore, regarding: (1) whether to initiate the process for cancellation of the lease; (2) whether to continue the [NHPA] process for lifting the suspension of the lease; (3) if so, whether any additional NEPA compliance is necessary before lifting the suspension; and (4) a proposed accelerated schedule that sets forth the tasks remaining to be completed—either under the process for cancellation, or under NEPA before lifting the suspension—and the rationales for their necessity. Dkt. # 57 at 4 (emphasis in original). 91. On November 23, 2015, Defendants filed their memorandum. Dkt. # 58. Although Defendants stated that they “ha[d] not yet made a final cancellation decision,” id. at 2, they were prepared to cancel the Lease “as early as December 11, 2015 or as soon thereafter as th[is] Court approves the proposed schedule.” Id. at 1. After repeatedly reaffirming the validity of the Lease for over 33 years, Defendants suggested that they may have issued the lease prematurely in violation of NEPA. Id. at 4. Defendants also suggested that they may have issued the lease prematurely in violation of the NHPA, id. at 4–5, but that the alleged NHPA “defect has now been corrected ....” Id. at 5. Defendants also suggested that a lease issued prematurely in violation of NEPA makes a lease voidable and that the Secretary has the inherent authority to administratively cancel a voidable lease under the facts in this case. Id. at 2–3, 5. 92. Solenex timely filed its response and demonstrated that there was no factual or legal support for Defendants’ proposed course of action of cancelling the lease. Dkt. # 63 at 15–36. Specifically, Solenex demonstrated that the Secretary lacked the authority to administratively cancel the lease. Id. at 15–26. In the alternative, Solenex demonstrated that, even if the Secretary possessed such authority, the exercise of that authority under the facts in this case would be unlawful. Id. at 27–36. Because Defendants intended to embark on a course of action that would be ultra vires and unlawful, and that was simply a pretext for further unlawful delay, Solenex requested that this Court reject Defendants’ proposed course of action, enjoin Defendants from Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 24 of 26 25 taking any further steps toward administratively cancelling Solenex’s lease, and order Defendants to lift the suspension on Solenex’s lease immediately. See, e.g., id. at 43. 93. On March 16, 2016, the Court held a Status Conference, during which this Court “request[ed]” that Defendants act “within 24 hours.” Transcript of Mar. 16, 2016 Status Conference 9:17–20. 94. On March 17, 2016, the BLM issued a decision administratively cancelling the Lease and disapproving the approved APD. Dkt. # 68-1. According to the BLM, the lease was issued prematurely in violation of NEPA, the NHPA, the AIRFA, and the agencies’ trust responsibilities. Dkt. # 68-1 at 7–12. Based upon these alleged violations, the BLM advised that it was exercising its alleged authority to administratively cancel the lease and disapprove the approved APD. Id. at 13–14. 95. The BLM’s decision was concurrently approved by the Deputy Secretary. Dkt. # 68-1 at 14. Because the BLM’s decision was approved by the Deputy Secretary it constitutes a final decision for the Secretary and is subject to judicial review under the APA. See Dkt. # 68-1 at 14; see also 5 U.S.C. § 704. DATED this 12th day of September 2016. Respectfully submitted, /s/ Steven J. Lechner Steven J. Lechner, D.D.C. Bar No. AZ 0001 MOUNTAIN STATES LEGAL FOUNDATION 2596 South Lewis Way Lakewood, Colorado 80227 (303) 292-2021 lechner@mountainstateslegal.com Attorney for Plaintiff Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 25 of 26 26 CERTIFICATE OF SERVICE I hereby certify that on September 12, 2016, I electronically filed the foregoing using this Court’s CM/ECF system. I certify that all participants in this case are registered CM/ECF users and service will be accomplished by this Court’s CM/ECF system. /s/ Steven J. Lechner Steven J. Lechner Case 1:13-cv-00993-RJL Document 89-2 Filed 09/12/16 Page 26 of 26