National Mining Association v. Jackson et alMemorandum in opposition to re MOTION for Preliminary InjunctionD.D.C.October 20, 2010IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA ) NATIONAL MINING ASSOCIA nON, ) )Plaintiff, ) )v. ) ) LISA JACKSON, ADMINISTRATOR, ) U.S. ENVIRONMENTAL PROTECTION ) AGENCY, et aI., ) ) Defendants. ) ) No.l:10-CV-1220-RBW UNITED STATES' MEMORANDUM IN OPPOSITION TO NATIONAL MINING ASSOCIATION'S MOTION FOR PRELIMINARY INJUNCTION IGNACIA S. MORENO Assistant Attorney General Environment and Natural Resources Division /s/Kenneth C. Amaditz CYNTHIA J. MORRIS KENNETH C. AMADITZ Environmental Defense Section Environment and Natural Resources Division United States Department of Justice P.O. Box 23986 Washington, DC 20026-3986 (202) 616-75 54 (Morris) (202) 514-3698 (Amaditz) Fax: (202) 514-8865 c. i .morris~usdoi .gov kenneth.amaditz~usdoi .gov Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 1 of 56 TABLE OF CONTENTS INTRODUCTION .............................................................................................................................1 STATUTORY AND REGULATORY BACKGROUND .................................................................2 i. THE CLEAN WATER ACT .................... ............................ ......... ....... ........................... ......2 A. CW A Section 303 Water Quality Standards............. .......... ................................ .......2 B. CW A Section 404 Permits.........................................................................................3 C. CW A Section 402 Permits...................................... .......................... ................ .........6 D. CW A Section 401 State Water Quality Certification .................................................7 II. THE NATIONAL ENVIRONMENTAL POLICY ACT .....................................................8 FACTUAL BACKGROUND........................... .................................................................................8 i. The "Enhanced Coordination" Process.................................................................................9 II. EPA's Multi-Criteria Integrated Resource Assessment ("MIRA") ......................................10 III. EP A's Detailed Guidance.. ....... .... .............. .............. .................................... ....................... ..11 STANDARD OF REVIEW.............................................................................................................. .13 ARGUMENT .....................................................................................................................................14 I. NMA IS NOT LIKELY TO SUCCEED ON THE MERITS................................................ 14 A. NMA's Claims Must Be Dismissed for Lack of Finality, Ripeness, and Standing................ .................................................... ............ ................................... ..14 B. Notice and Comment Rulemaking Was Not Required Because the Challenged Agency Policies Are Not Legislative Rules...............................................................15 1. The EC Process Memoranda Are Not Legislative Rules...............................15 2. The Detailed Guidance Is Not a Legislative Rule .........................................18 C. The EC Memoranda and the Detailed Guidance are Fully Consistent With the CW A and NEP A...... ..................................................... ..... ...... .............. .....21 1. The EC Process is Consistent With the CW A ...............................................22 Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 2 of 56 2. The Detailed Guidance is Consistent With the CW A....................................24 a. The Detailed Guidance does not establish a water quality standard............................................................................................ .24 b. The Detailed Guidance properly applies to section 404 PermIts.......26 3. The Detailed Guidance is Consistent With NEPA ........................................28 II. NMA HAS NOT ESTABLISHED THAT ITS MEMBERS WILL FACE IRRPARABLE INJURY ABSENT EXTRAORDINARY INJUCTIVE RELIEF ................................................. ................................................................................ .29 A. NMA Has Not Demonstrated that the Challenged Agency Policies Pose a Certain and Immediate Threat to the Survival of Any oflts Members ..................30 B. The Cost of Regulatory Compliance Is Not Irreparable Har ..................................34 C. NMA Has Not Demonstrated Irreparable Harm to Property Interests......................38 D. NMA's Delay in Seeking Injunctive Relief Furher Undermines Its Claims of Irreparable Harm................................................................................................... .40 III. THE BALANCE OF EQUITIES WEIGHS IN FAVOR OF THE UNITED STATES.............................................................................................. .................................. .40 IV. DENIAL OF THE PRELIMINARY INJUCTION IS IN THE PUBLIC INTEREST .......42 CONCLUSION ..................................................................................................................................42 11 Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 3 of 56 TABLE OF AUTHORITIES CASES A.O. Smith Corp. v. FTC, 530 F.2d 515 (3d Cir. 1976)..........................................................34,35 Ashcroft v. ACLU, 542 U.S. 656 (2004) .......................................................................................13 *Cement Kiln Recycling CoaL. v. EP A, 493 F.3d 207 (D.C. Cir. 2007) .......................................19 Chamber of Commerce v. Edmondson, 594 F.3d 742 (lOth Cir. 2010)........................................34 Chaplaincy of Full Gospel Churches v. England, 454 F.3d 290 (D.C. Cir. 2006) ........................29 CoaL. For Common Sense In Gov't Procurement v. United States, 576 F. Supp. 2d 162 (D.D.C. 2008) ............................................................................................36 Coeur Alaska, Inc. v. Se. Alaska Conservation Council, 129 S. Ct. 2458 (2009)...................22, 27 Ctr. for Auto. Safety v. NHTSA, 452 F.3d 798 (D.C. Cir. 2006)..................................................15 Ctr. for Marine Conservation v. Brown, 917 F. Supp. 1128 (S.D. Tex. 1996)................................8 *Doran v. Salem Inn, Inc., 422 U.S. 922 (1975) .....................................................................13, 29 FPC v. Transcom Gas Pipe Line, 423 U.S. 326 (1976) .................................................................29 Freedom Holdings, Inc. v. Spitzer, 408 F.3d 112 (2d Cir. 2005) ..................................................34 General Electric Co. v. EPA, 290 F.3d 377 (D.C. Cir. 2002)..................................................15, 17 Hi-Technology Pharacal Co., Inc. v. FDA, 587 F. Supp. 2d 1 (D.D.C. 2008)...........................29 Hunt v. Wash. State Apple Advertising Comm'n, 432 U.S. 333 (1977).......................................31 IMS Health Inc. v. Sorrell, 631 F. Supp. 2d 429 (D. Vt. 2009).....................................................35 Marsh v. Oregon Natural Resource Council, 490 U.S. 360 (1989) .................................................8 *Mazek v. Arstrong, 520 U.S. 968 (1997) ............................................................13, 29, 35, 39 Meghrig v. KFC Western, Inc., 516 U.S. 479 (1996)....................................................................33 * Authorities chiefly relied upon are marked with an asterisk. ii Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 4 of 56 Mylan Phars., Inc. v. Shalala, 81 F. Supp. 2d 30 (D.D.C. 2000)................................................40 National Ass'n of Home Builders v. Defenders of Wildlife, 551 U.S. 644 (2007) .........................6 National Medical Care, Inc. v. Shalala, No. 95-0860 WBB, 1995 WL 465650 (D.D.C. June 6, 1995) ....................................................................................34 Ohio Valley Envt' CoaL. v. Aracoma Coal Co., 556 F.3d 177 (4th Cir. 2009) ..............................4 Pelfresne v. Vilage of Wiliams Bay, 865 F.2d 877 (7th Cir. 1989) ............................................39 Pennsy Supply, Inc. v. Susquehana River Basin Comm'n, No. I:CV-06-2454, 2007 WL 551573 (M.D. Pa. Feb. 20, 2007)...............................................35 *Power Mobility CoaL. v. Leavitt, 404 F. Supp. 2d 190, supplemented by No. 05cv2027, 2005 WL 3312962 (D.D.C., Dec. 7,2005) ................................29,30,33,36,37 RoDa Driling Co. v. Siegal, 552 F.3d 1203 (lOth Cir. 2009).......................................................39 Robertson v. Methow Valley Citizens Council, 490 U.S. 332 (1989)................................... .......... 8 Steel Co. v. Citizens for a Better Environment, 523 U.S. 83 (l998).............................................14 Syncor International Corp. v. Shalala, 127 F.3d 90 (D.C. Cir. 1997) ...........................................15 University of Tex. v. Camenisch, 451 U.S. 390 (1981).................................................................13 Vt. Yanee Nuclear Power Corp. v. NRDC, 435 U.S. 519 (1978)................................................29 S.D. Waren Co. v. Maine Board of Environmental Prot., 547 U.S. 370 (2006) ............................7 *Winter v. NRDC, Inc., 129 S. Ct. 365 (2008)..............................................................................13 Wisconsin Gas Co. v. FERC, 758 F.2d 669 (D.C. Cir. 1985) .....................................29,30,35,37 STATUTES Clean Water Act ("CWA"), 33 U.S.c. §§ 1251-1387: 33 U. S.C. § 1251 (a) .........................................................................................................................2 33 U.S. C. § 1311........................................................ ............................. .......................... ...............2 33 U.S.C. § 1311 (a) .........................................................................................................................2 iv Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 5 of 56 * 3 3 U.S .C. § 1311 (b)( 1 )(C) .......................................................... ........................................... ..6, 25 33 U .S.C. § 1313..............................................................................................................................2 * 33 U. S. C. § 1313( a)-( c)...................... ................. ................... ..................... ...................................2 33 U .S.C. § 1313( c) .......... ....... ;............................ ......... ......... ..... ................ ................................. ....3 33 V.S.C. § 1313( c )(3)-( 4)............ ................................. ........... .......................................................3 33 U.S. C. § 1314( a) .........................................................................................................................3 33 U. S. C. § 1341 (a)( 1 ) .. ... .. .. .. ... .. .. ... .. .. . .. .. .. ... .. .. .. .. .. .... .. . .. ... .. .. .... .. .. .. . .. ...... . .. .. ... .. .. .. .. .. .. .. .. .. .. .........7 * 33 U. S.C. § 1342............................................................................................................................6 * 33 U .S.C. § 1342(b )-( c) .................................................................................................................6 * 33 U .S.C. § 1342( c )(2)............................................................................................................... ..25 * 3 3 U .S.C. § 1342( d) ................................................................................................................. 7, 25 * 3 3 U .S.C. § 1342( d)( 4) .................................................................................................................. 7 * 33 U. s.c. § 1344( a) .......................................................................................................................3 * 33 U . S.C. § 1344(b).......................................................................................................................5 * 3 3 U. S. C. § 13 44(b )( 1) .................................................................................................................. 4 * 3 3 U .S.C. § 1344( c) .......................................................................................................................5 * 3 3 U.S. C. § 1344( q) ................................................................................................................ .4, 23 National Environmental Policy Act ("NEP A"), 42 U.S. C. 4321-43 7 Of. ....................... .................8 REGULATIONS 33 C.F .R. Par 230......................................................................................................... ...................8 33 C.F .R. § 320.4(b)( 4)....................................................................................................................4 33 C.F .R. § 320.4( d) .............................................................................................................. ..27, 28 33 C.F .R. Par 325............................................................................................................................4 v Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 6 of 56 33 C.F .R. Part 325, Appendix B ...................................................................................... ............. ...8 33 C.F .R. § 325 .2( a)( 6) ....................................................................................................................4 33 C.F .R. § 325 .3( d) ................................................................................................................. .4, 24 *40 C.F .R. § 122.44( d)(I).......................... ......... ..................... ..........................................3, 6, 7, 25 40 C.F .R. § 122.44( d)(1 )(v) & (vi) . ............................... ............ ........... ..................... ......................6 40 C.F.R. § 122.44( d)( 1 )(vi).............. .................. .................... ...................................... ............7, 25 40 C.F .R. § 122.44(k)(3)..................................................................................................................6 40 C.F .R. § 123 .25( a).................................................................................................................... .25 40 C.F .R. § 123.44........................................................................................................................... 7 40 C.F .R. § 131.5.............................................................................................................................3 40 C.F .R. § 131.21 ..................................................... .............. ..................................................... ...3 40 C.F .R. Part 230............................................................................................................................4 40 C.F .R. § 230.1 O( c)( 1 )-(3) ...................................................................................... ......................4 40 C.F .R. § § 1500-1508...................................................................................................................8 FEDERAL REGISTER 54 Fed. Reg. 23,968, 23,875 (June 2, 1989) ....................................................................................3 75 Fed. Reg. 18,500 (Apr. 12, 2010) .......................................................................................13, 18 MISCELLANEOUS Webster's New International Dictionar of English Language 1245 (2d ed. 1934) ......................33 vi Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 7 of 56 INTRODUCTION The United States Environmental Protection Agency ("EP A") and the United States Army Corps of Engineers ("Corps") respectfully oppose the motion for preliminar injunction fied by National Mining Association ("NMA"). First, as we demonstrated in our Memorandum in Support of Defendants' Motion to Dismiss fied on September 27,2010 (Dkt. No. 14) (hereinafter, "U.S. MTD Br."), the Complaint should be dismissed because NMA has challenged non-binding agency policies that qualify neither as legislative rules nor "final agency action" under the Administrative Procedure Act ("APA"), and NMA's generalized challenges to the agency policies are not ripe for judicial review because the claims can only be determined in a more concrete setting. Furhermore, NMA lacks standing to challenge two ofthe policies because it has not identified an injur-in- fact caused by the policies. And finally, one of those two challenged policies is committed to agency discretion by law and, thus, is immune from review under the AP A. For all these reasons, this Court lacks subject matter jurisdiction over the claims asserted in the Complaint and/or the Complaint fails to state a claim upon which relief can be granted. Accordingly, the requested preliminary relief canot be granted. Even ifNMA could overcome these jurisdictional hurdles, it is not entitled to the preliminar injunctive relief it seeks because it has not, and cannot, establish a likelihood of success on the merits of its claims. On the contrar, as demonstrated below, the challenged policy documents are not legislative rules subject to the procedural requirements of the AP A, and, moreover, the policies reflected in the documents are fully consistent with, and authorized by, the Clean Water Act ("CW A") and the National Environmental Policy Act ("NEP A"). - 1 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 8 of 56 In addition, even ifNMA could establish a likelihood of success on the merits of its claims, it has not, and cannot, establish that failure to grant preliminary injunctive relief would result in irreparable harm. The procedural delays and potential economic har and damage to property interests alleged by NMA are not supported by any evidence and, in any event, are flatly insuffcient to warant the extraordinary relief requested here. Finally, the balance of the equities tips decidedly in favor of the United States, and the public interest wil be served by denial of the preliminar relief requested. ST A TUTORY AND REGULATORY BACKGROUND i. THE CLEAN WATER ACT The Clean Water Act ("CW A") establishes a comprehensive program designed to "restore and maintain the chemical, physical, and biological integrity of the Nation's waters." 33 U.S.C. § 1251(a). To achieve this goal, the CWA authorizes the development of water quality standards pursuant to CW A section 303,33 U.S.C. § 1313, and prohibits the discharge of pollutants from point sources into navigable waters unless consistent with the requirements of the Act. Id. § 1311(a). The CW A authorizes the discharge of pollutants into waters of the United States under two permitting programs under Sections 404 and 402 of the Act. Id. §§ 1344, 1342. A. CW A Section 303 Water Quality Standards Section 303 of the CW A requires States to adopt water quality standards applicable to its intrastate and interstate waters. 33 U.S.C. § 1313(a)-(c). Water quality standards assist in maintaining the physical, chemical and biological integrity of a water body by designating its uses, setting criteria to protect those uses, and establishing provisions to protect water quality - 2- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 9 of 56 from degradation. Anti-degradation implementation procedures identify the issues that must be addressed when regulated activities are proposed that may affect water quality. Water quality criteria can be expressed as numeric chemical-specific concentrations or toxicity levels ("numeric criteria"), or as narative statements representing the quality of water necessary to support a particular use of the waterbody ("narrative criteria"). Narrative water quality criteria have the same force and effect as numeric criteria, and must be attained and maintained in the same way. See 40 C.F.R. §122.44(d)(l) (requiring that NPDES permits contain effluent limits "necessary to ... (a)chieve water quality standards established under section 303 of the CW A, including State narrative criteria for water quality"); 54 Fed. Reg. 23,968, 23,875 (June 2, 1989). State-adopted water quality standards are subject to EPA review. 40 C.F.R. § 131.5; 33 U.S.C. § 1313(c). EPA may object to state-adopted water quality standards and may require changes to the state-adopted water quality standards. 40 C.F.R. §§ 131.5, 131.21; 33 U.S.C. § 1313(c)(3)-(4). If the state does not respond to EPA's objections, EPA may promulgate federal standards. 40 C.F.R. § 131.5,33 U.S.c. § 1313(c)(3)-(4). To assist states in adopting water quality standards that wil meet with EPA's approval, EP A may develop and publish criteria for water quality that accurately reflect "the latest scientific knowledge." 33 U.S.C. § 1314(a). B. CW A Section 404 Permits Section 404(a) of the CWA authorizes the Secretar of the Ary, acting through the Chief of Engineers, to "issue permits. . . for the discharge of dredged or fill material into the navigable waters at specified disposal sites." 33 U.S.C. § 1344(a). By this authority, the Corps regulates discharges of dredged and fill material associated with surface coal mining and - 3 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 10 of 56 reclamation activities, such as the construction of valley fills, stream chanel diversions, sediment ponds, road crossings, and disposal of coal waste, into waters of the United States, including primarily ephemeral and intermittent streams and some perennial streams. See Ohio Valley EnvtI. CoaL. v. Aracoma Coal Co., 556 F.3d 177, 190-91 (4th Cir. 2009). The Corps' regulations set forth the requirements for Section 404 permit applications and the procedures for the Corps' review of permit applications. 33 C.F.R. pt. 325. Although the Corps is the permitting authority under Section 404, EP A has an important role in the permitting process. Section 404(b) of the CW A requires that the Corps' permit decisions must comply with guidelines developed by EPA. 33 U.S.C. § 1344(b)(l). These regulations, which are referred to as the "404(b)(l) Guidelines," provide that the Corps must ensure that the proposed fill wil not cause significant adverse effects on human health or welfare, aquatic life, and aquatic ecosystems. 40 C.F.R. § 230.10(c)(1)-(3). EPA's 404(b)(1) Guidelines are codified at 40 C.F.R. pt. 230, and are incorporated in the Corps' regulations. See 33 C.F.R. §§ 320.4(b)(4), 325.2(a)(6). Corps regulations also require that before the Corps issues a CW A Section 404 permit, it must provide notice to EP A and other resource agencies, and those agencies may provide comments for consideration by the Corps. 33 C.F.R. § 325.3(d). The Corps and EPA have entered into a Memorandum of Agreement ("MOA") (Ex. 1), i pursuant to Section 404(q) of the CW A, 33 U.S.c. § 1344(q), that expressly recognizes that "the EP A has an important role in the Deparment of the Ary Regulatory Program under the Clean Water Act(.)" MOA (Ex. 1) at 1. The MOA provides that "(p)ursuant to its authority under Section 404(b)(l) of the Clean Water i The MOA was attached to the United States' Motion to Dismiss as Exhibit 1 (Doc. # 13-1). To avoid confusion, this Brief wil refer to exhibits submitted with the Motion to Dismiss by the same exhibit number, and new exhibits will be numbered consecutively. - 4 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 11 of 56 Act, the EP A may provide comments to the Corps identifying its views regarding compliance with the Section 404(b)(1) Guidelines" and "(t)he Corps wil fully consider EPA's comments when determining (compliance) with the National Environmental Policy Act, and other relevant statutes, regulations, and policies." Id. Although the Corps need not defer to EPA's comments, the Corps must "fully consider the EPA's views when determining whether to issue the permit, to issue the permit with conditions and/or mitigation, or to deny the permit." Id. It fuher provides for an "elevation" procedure to resolve certain differences that may arise between the agencies. Id. at 4-7. Finally, although the final decision on any permit application rests with the Corps, that decision is subject to the exercise of EPA's authority under Section 404(c) of the CW A, often referred to as EP A's "veto" authority. Section 404(c) provides: The (EP A) Administrator is authorized to prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, and he is authorized to deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, whenever he determines, after notice and opportunity for public hearings, that the discharge of such materials into such area wil have an unacceptable adverse effect on municipal water supplies, shellfish beds and fishery areas (including spawning and breeding areas), wildlife, or recreational areas. Before making such determination, the (EP A) Administrator shall consult with the Secretary (of the Ary). The (EPA) Administrator shall set forth in writing and make public his findings and his reasons for making any determination under this subsection. 33 U.S.C. § 1344(c). The "specification" of a disposal site refers to the process by which a disposal site is specified by a Section 404 permit. See 33 U.S.C. § 1344(b) ("each such disposal site shall be specified for each such permit by the (Corps)"). Because Section 404(c) authorizes EP A to prohibit, withdraw, deny, or restrict the specification of such disposal sites that would otherwise be authorized by a Section 404 permit, EP A's authority under Section 404( c) is often designated as the authority to "veto" the permit. - 5 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 12 of 56 c. CW A Section 402 Permits Section 402 of the CWA, 33 U.S.C. § 1342, governs discharges of pollutants other than dredged or fill materiaL. Section 402 permits are issued by EP A, unless the state has an approved program, in which case the state is authorized to issue the permits, subject to EP A oversight. See id. § 1342(b)-(c); see generally Nat' Ass'n of Home Builders v. Defenders of Wildlife, 551 U.S. 644,650-51 (2007). All of the Appalachian states relevant to this case (Kentucky, Ohio, Pennsylvania, Tennessee, Virginia, and West Virginia) have approved programs and, thus, are authorized to administer the Section 402 permitting programs within their states. Permits issued under the authority of Section 402 are known as National Pollutant Discharge Elimination System ("NPDES") permits, and typically contain numerical limits called "effuent limitations" that restrict the amounts of specified pollutants that may be discharged. NPDES permits must contain technology-based effuent limits, and more stringent water quality- based effuent limits when necessary to meet state "water quality standards." 33 U.S.c. §§ 1311(b)(1)(C), 1342(a); 40 C.F.R. § 122.44(d)(l). State water quality standards may be expressed as numeric or narrative criteria. Where necessar to ensure compliance with the state's narative water criteria, an NPDES permit must contain effuent limits based on whole effluent toxicity and/or a chemical-specific numeric interpretation of the narative criteria. 40 C.F.R. § 122.44(d)(l)(v) & (vi). Ifit is infeasible to calculate a numeric effuent limit, the NPDES permit must include best management practices to control or abate the discharge of pollutants. 40 C.F.R. § 122.44(k)(3). In order to determine whether water quality-based effluent limits are necessary, the permitting authority is required to conduct a "reasonable potential analysis." A reasonable potential analysis evaluates whether a discharge wil cause, or has the reasonable potential to - 6 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 13 of 56 cause or contribute to, an excursion above a numeric or narative water quality criterion. The permit must include limitations for any pollutants for which there is a reasonable potential to exceed either numeric or narative water quality criteria. 40 C.F.R. § 122.44(d)(1), (d)(l)(vi). Because all of the states in the Appalachian region are authorized by EP A to administer the CW A Section 402 permitting program, NPDES permits are issued by the states, subject to EP A oversight. EP A retains authority to review proposed state-issued permits and to object to the issuance of a permit. 33 U.S.C. § 1342(d); 40 C.F.R. § 123.44. If the state does not adequately address EPA's objections, authority to issue the permit transfers to EPA. 33 U.S.C. § 1342(d)(4). EPA's procedures for the review of state-issued permits are set forth in regulations at 40 C.F.R. § 123.44. D. CW A Section 401 State Water Qualitv Certifcation CW A Section 401,33 U.S.C. § 1341, requires each applicant to submit a certification from the affected state that the discharge wil be consistent with certain water quality requirements, including those set by the state. 33 U.S.C. § 1341(a)(l); S.D. Waren Co. v. Maine Bd. ofEnvtI. Prot., 547 U.S. 370, 374 (2006). CW A Section 401 provides that "(n)o license or permit shall be granted until the certification required by this section has been obtained or has been waived" and "(n)o license or permit shall be granted if certification has been denied by the State." 33 U.S.C. § 1341 (a)(1). If individual or cumulative effects of a project violate state water quality requirements, the state may deny certification. The states are responsible for providing CW A § 401 water quality certifications. Neither a CW A § 404 permit nor a CW A § 402 permit can be issued without a state CW A § 401 certification that state water quality standards wil not be violated by authorizing the proposed activity, unless a state waives its right to fie such a certification. - 7 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 14 of 56 II. THE NATIONAL ENVIRONMENTAL POLICY ACT NEPA, 42 U.S.C. §§ 4321-70f, focuses the attention of federal decisionmakers and the public on potential environmental effects of proposed federal agency action. It is purely procedural because it does not compel paricular results, and it does not impose substantive obligations. Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 350-51 (1989). NEP A does not require that an agency select any paricular course of action. Rather, it requires only that the agency make its decision to proceed with a paricular action after taking a "hard look" at environmental consequences. Ctr. for Marine Conservation v. Brown, 917 F. Supp. 1128, 1136 (S.D. Tex. 1996). "NEPA merely prohibits uninformed - rather than unwise- agency action." Methow Valley Citizens Council, 490 U.S. at 351. "NEPA ensures that the agency wil not act on incomplete information, only to regret its decision after it is too late to correct." Marsh v. Oregon Natural Res. Council, 490 U.S. 360, 371 (1989). When a section 404 permit application requires analysis of environmental impacts under NEP A, the Corps follows three sets of guidelines: (l) the Corps' own NEP A guidelines, set forth at 33 C.F.R. Parts 230 and 325, Appendix B; (2) the Corps' general regulatory policies at 33 C.F.R. Par 320; and (3) the regulations promulgated by the Council on Environmental Quality ("CEQ"), set forth at 40 C.F.R. §§ 1500-1508. FACTUAL BACKGROUND On June 11,2009, EPA, the Corps, and the Deparment of the Interior entered into a Memorandum of Understanding ("MOU") (Ex. 2) to establish an Interagency Action Plan on Appalachian surface coal mining. In the MOU, the Corps and EP A agreed to strengthen and coordinate review of CW A Section 404 permit applications to ensure compliance with the - 8 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 15 of 56 Section 404(b)(l) Guidelines. EP A also committed to strengthen its oversight and review of Section 402 permits issued by states in connection with surface coal mining projects. I. The "Enhanced Coordination" Process One component of the Interagency Action Plan adopted by the Corps and EP A in the MOU was an "enhanced coordination process" to facilitate the joint review of approximately 108 pending applications for CW A Section 404 permits in connection with surface coal mining projects in Appalachia. See "EPAlCorps of Engineers Enhanced Coordination Process for Pending Clean Water Act Permits Involving Appalachian Surface Coal Mining" (June 11, 2009) ("EC Memo") (Ex. 3). The process agreed upon by EPA and the Corps applies only to these 108 permit applications? As explained in the EC Memo, EP A and the Corps agreed to a two-step approach to expedite the review of these applications. First, EP A would identify which of the pending applications raised environmental concerns and thus waranted fuher review and coordination. Id. at 2. The remaining applications would be processed by the Corps without further review by EP A. Second, the EC Memo lays out a process for coordination between EP A and the Corps as they review the applications EP A identified. Id. at 2-3. The EC Memo does not address the substantive criteria for review of CW A Section 404 permit applications. It merely establishes procedures designed to allow the agencies to work efficiently through the backlog of pending permit applications. The EC Memo expressly provides that: This document does not, and is not intended to, impose any legally binding requirements on Federal agencies, States, or the regulated public, and does not restrict the authority of the employees of the signatory agencies to exercise their 2 Permit applications received after March 31, 2009, would be processed pursuant to the agencies' existing procedures. EC Memo (Ex. 3) at 1. - 9 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 16 of 56 discretion in each case to make regulatory decisions based on their judgment about the specific facts and application of relevant statutes and regulations. Id. at 3. II. EP A's Multi-Criteria Intee:rated Resource Assessment ("MIRA") In accordance with the approach set forth in the EC Memo, EP A identified the "regulations and key factual considerations" that the Agency "intend(ed) to use to screen and evaluate the pending permit applications to determine which permit applications require further coordination between EPA and the Corps." Letter from L. Jackson, EPA Adm'r, to T. Salt, Acting Ass't Sec'y of Civil Works (June 11,2009) ("Jackson Letter") (Ex. 4) at 1-2. In paricular, EPA identified provisions of the Section 404(b)(I) Guidelines and factual considerations that relate to those provisions. Id. at 1-2. Furher, EPA explained that it "intend(ed) to utilize a database containing information on each of the pending permit applications" in order "(t)o expedite this process and assist in making EP A's decisions effcient, consistent, and transparent(.)" Id. at 2. The database EPA employed was the key component in a process known as the Multi-Criteria Integrated Resource Assessment ("MIRA"). MIRA is a tool EP A developed to assist in the organization and analysis of a broad array of scientific and technical information in various regulatory contexts. See Multi-Criteria Integrated Resource Assessment Questions and Answers (Ex. 5) at 1. With respect to the 108 pending permit applications at issue here, EP A used MIRA to organize an extensive set of technical data relevant to the considerations under the Section 404(b)(I) Guidelines. Id. Use of MIRA in this fashion "allow( ed) decision makers from three EP A (regional offices) to review, discuss and reach consistency and consensus using a common set of data for discussion and analysis." Id. The relevant data inputs were obtained from a variety of sources, including the Section 404 permit applications, surface mining permit applications, and other data available - 10- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 17 of 56 from public sources. Id. The permit applicants had the opportunity to confirm or correct certain categories of data, and many took advantage of that opportunity. Id. MIRA did not create a new standard or compel any particular outcome, nor was it used as a substitute for the Section 404(b)(l) Guidelines. Id. at 2. Instead, MIRA allowed EP A officials to consider the available data in various combinations, identify potential areas of concern, and consider the proposed projects in the context of the Guidelines. Id. at 1. After considering the data and performing additional analysis - including consultations with other federal agencies - EP A officials determined which permit applications would be subject to the enhanced coordination procedures. Id.; "Appalachian Surface Coal Mining Initial List Resulting from Enhanced Coordination Procedures" (Sept. 11, 2009) ("Initial ECP List Fact Sheet") (Ex. 6) at 1. On September 11, 2009, EP A published on its web site for a 14-day public review period the initial list of 79 permit applications that the Agency had determined should be subject to enhanced coordination. Id.; CompI. ~ 64. By letter dated September 30, 2009, EP A advised the Corps of its view that all 79 permit applications raised environmental concerns and should be subject to the procedures in the EC Memo. See Letter from P. Silva, EPA Ass't Adm'r, to J. Darcy, Ass't Sec'y of the Ary (Sept. 30, 2009) (Ex. 7); CompI. ~ 65. III. EP A's Detailed Guidance EP A issued interim guidance on April 1, 2010, to provide clarification of EP A's role and expectations in coordinating with other federal agencies and with states, with regard to environmental review of Appalachian surface coal mining operations under the CW A and other authorities. See "Detailed Guidance: Improving EP A Review of Appalachian Surface Coal Mining Operations under the Clean Water Act, National Environmental Policy Act, and the Environmental Justice Executive Order" (Apr. 1,2010) ("Detailed Guidance") (Ex. 8). The - 11 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 18 of 56 Detailed Guidance does not establish any new standards or requirements, but rather explains how EP A intends to apply its existing legal authorities in its review of CW A Section 402 and 404 permit applications associated with surface coal mining operations in Appalachia. As EP A emphasized in the Detailed Guidance: The CW A and NEP A provisions and regulations described in this document contain legally binding requirements. This guidance does not substitute for those provisions or regulations, nor is it a regulation itself. It does not impose legally binding requirements on EPA, the U.S. Ary Corps of Engineers (Corps), the States, or the regulated community, and may not apply to a paricular situation depending on the circumstances. Any decisions regarding a paricular permit wil be based on the applicable statutes, regulations, case-specific facts and circumstances, and case law. Therefore, interested persons are free to raise questions about the appropriateness of the application of this guidance to a paricular situation, and EP A and/or the Corps wil consider whether or not the recommendations or interpretation of this guidance are appropriate in that situation based on the statues, regulations, and case law. Detailed Guidance (Ex. 8) at 2 n.3. Among other things, the Detailed Guidance identifies several areas of concern that EP A's regional offices "should evaluate" when reviewing state-issued Section 402 permits associated with surface coal mining projects. Id. at 8-15. For example, EPA explained its view that a recent EP A report, which indicates adverse environmental impacts associated with stream "conductivity" levels, "should be considered by Appalachian states as relevant information" under EP A's regulations when states set effuent limits in permits issued under CW A Section 402. Id. at 12. The Detailed Guidance also sets forth recommendations for strengthening EPA's environmental review of Section 404 permits issued by the Corps. Id. at 16-28. For example, the Detailed Guidance identifies types of data EP A's regional offces "should evaluate" for Section 404 permits, and sets forth "EP A's expectations" for the types of analyses necessary to achieve compliance with the Section 404(b )( 1) Guidelines. Id. at 19-20. - 12 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 19 of 56 In light of emerging science on water quality, and in recognition of "the importance of this guidance to (EP A's) Federal and state partners, to the regulated community, and to the public," EPA issued the document as "interim" guidance, published it in the Federal Register, and solicited public comment until December, 2010. 75 Fed. Reg. 18,500 (Apr. 12,2010); Detailed Guidance (Ex. 8) at 1 n.l. EP A expects to issue final guidance no later than April 1, 2011. Detailed Guidance (Ex. 8) at 1 n.l. STANDARD OF REVIEW "A plaintiff seeking a preliminar injunction must establish that he is likely to succeed on the merits, that he is likely to suffer irreparable harm in the absence of preliminar relief, that the balance of equities tips in his favor, and that an injunction is in the public interest." Winter v. NRDC, Inc., 129 S. Ct. 365,374 (2008). Because a "preliminary injunction is an extraordinary and drastic remedy," Mazuek v. Arstrong, 520 U.S. 968, 972 (1997) (per curiam), whose "purpose. . . is merely to preserve the relative positions of the paries until a trial on the merits can be held," Univ. of Tex. v. Camenisch, 451 U.S. 390, 395 (1981), the party seeking such an injunction must make a "clear showing" that temporary equitable relief is necessary. Mazurek, 520 U.S. at 972; see Doran v. Salem Inn, Inc., 422 U.S. 922,931 (l975) ("stringent" showing required). The movant therefore caries a heavy burden not only of demonstrating that "he is likely to prevail on the merits" but also that "he wil suffer irreparable injur" without injunctive relief. Doran, 422 U.S. at 931 (emphasis added); see Ashcroft v. ACLU, 542 U.S. 656, 666 (2004) ("likelihood of irreparable injur" required). - 13 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 20 of 56 ARGUMENT I. NMA IS NOT LIKELY TO SUCCEED ON THE MERITS A. NMA's Claims Must Be Dismissed for Lack of Finalitv. Ripeness. and Standine:. Before addressing NMA's motion for a preliminar injunction, the Court must first satisfy itself that NMA's claims are properly before the Cour. See Steel Co. v. Citizens for a Better Env't, 523 U.S. 83, 94 (1998) (where subject matter jurisdiction does not exist, '''the court canot proceed at all in any cause.' ") (citation omitted). In its Motion to Dismiss, fied September 27,2010 (dkt. No. 12), the United States has challenged the Cour's subject matter jurisdiction over the claims asserted by NMA. As demonstrated therein, NMA's claims must be dismissed as a matter oflaw for lack of finality, ripeness and standing. First, NMA's claims must be dismissed for failure to state a claim because the agency policies NMA challenges are not "final agency action" subj ect to review under the AP A. U. S. MTD Br. at 13 -18. Second, the Court lacks subject matter jurisdiction over NMA's challenge because NMA's claims are not ripe for review. Id. at 19-29. Third, NMA lacks standing to challenge MIRA and the EC Memo. Id. at 29-32. Finally, NMA canot challenge MIRA because EPA's screening process was a decision committed to agency discretion by law and, thus, is not subject to review under the APA. Id. at 32-34. For these reasons, the Court must dismiss the Complaint and deny NMA's motion for preliminar injunctive relief as moot.3 3 Because the issues raised in the U.S. Motion to Dismiss establish that NMA has no likelihood of success on the merits, the United States incorporates herein its Motion to Dismiss and its Memorandum in Support of its Motion to Dismiss, and the United States intends to address the jurisdictional arguments presented in its Motion to Dismiss at the hearing scheduled for November 5, 2010. - 14 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 21 of 56 B. Notice and Comment Rulemakine: Was Not Reauired Because the Challene:ed Ae:encv Policies Are Not Lee:islative Rules. Even if the Cour decides not to dismiss NMA's claims, the Cour nevertheless should deny NMA's motion for preliminary relief because NMA is unlikely to prevail on the merits. As we demonstrated in our memorandum in support of our motion to dismiss, U.S. MTD Br. at 34- 45, and as explained further below, the APA requires public notice and opportunity to comment only for "substantive" or "legislative" rules. Here, NMA canot prevail on its claim that MIRA, the EC Memo and the Detailed Guidance are legislative rules because none of those challenged policies is binding or creates any new legal standards. See Syncor Int' Corp. v. Shalala, 127 F.3d 90, 94 (D.C. Cir. 1997). 1. The EC Process Memoranda Are Not Legislative Rules. NMA contends that the "EC Process memoranda,,4 are legislative rules because they "effectively amend the longstanding permitting regime set forth in Section 404, as well as the Corps' regulations implementing that section." NMA PI Br. at 14. But NMA vastly overstates and mischaracterizes the stated intent and the effect of those policy memoranda. The primary criterion used to distinguish between a legislative rule and a policy statement is whether the agency action "binds private parties or the agency itself with the 'force oflaw.'" Gen. Elec. Co. v. EPA, 290 F.3d 377, 382 (D.C. Cir. 2002). In making this determination, courts consider whether the agency has imposed any rights and obligations, or left itself genuinely free to exercise discretion. Ctr. for Auto Safety v. NHTSA, 452 F.3d 798, 806 (D.C. Cir. 2006). 4 NMA defines this term to include the EC Memo, which was Ex. 3 (Doc. # 13-3) to the U.S. MID Hr. and is Ex. 1 to the NMA PI Hr., and the Jackson Letter, which was Ex. 4 (Doc. # 13-4) to the U.S. MTD Hr. and is Ex. 2 to the NMA PI Hr. Although NMA alleged separate challenges to MIRA and the EC Memo procedures in its Complaint, it has lumped the two documents together for the purposes of its PI briefing. - 15 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 22 of 56 Here, the EC Process memoranda are plainly not legislative rules. The first of the two memoranda -- the Jackson Letter (Ex. 4) -- describes in general terms the consideration EP A intended to use to screen permit applications, but it suggests no intent to bind EP A to any paricular approach or to otherwise curb the Agency's discretion. See Jackson Letter (Ex. 4) at 1-2 (describing "how we Intend to conduct the review of the approximately 110 pending permit applications" and the "factors EP A intends to use to screen and evaluate the pending permit applications") (emphasis added). Moreover, the Jackson Letter created no new legal norms. To the contrary, it made clear that EP A planed to base its screening process on the already-existing Section 404(b)(1) Guidelines. Id. Furhermore, the Jackson Letter established no legal obligations or requirements for the regulated community - it merely stated the approach EP A planed to use to screen permit applications for enhanced review. Id. The selected permit applications were not granted or denied, and they remained subject to the same CW A standards that apply to every permit, the only difference being that those applications would be subject to the procedures set forth in the EC Memo, which procedures are themselves non-binding. See EC Memo (U.S. MTD Br. Ex. 3) at 3. Thus, the Jackson Letter does not constitute a legislative rule. The same is true for the EC Memo. The Memo itself makes it clear that EP A and the Corps did not intend it to be binding. It was not published in the Federal Register or incorporated in the Code of Federal Regulations, and the Memo's plain text states that it is "intended solely as guidance" and "does not, and is not intended to, impose any legally binding requirements on Federal agencies, States, or the regulated public(.)" Id. Furthermore, the EC Memo does not create a new legal norm: permit applicants remain subject to the substantive requirements of the CW A and relevant regulations. Id. The Memo only establishes new procedures for EP A-Corps coordination, but those procedures are non-binding and the agencies - 16 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 23 of 56 retain discretion to vary from them in any particular case. Id. (the agencies "will work to adhere" to the time frames and procedures in the Memo "to the maximum practical extent" though "flexibility may be needed under particular circumstances"; fuher, the Memo "does not restrict the authority of the employees of (EP A and the Corps) to exercise their discretion in each case to make regulatory decisions based on their judgment about the specific facts and application of relevant statutes and regulations."). The EC Memo does not bind EPA, the Corps, or the regulated community with the force of law and, therefore, it does not qualify as a legislative rule.s See Gen. Elec. Co., 290 F.3d at 382. In spite of this plain language establishing that the EC Process memoranda are not binding, NMA asserts that the memoranda are in fact binding because the agencies used the word "wil" as opposed to "may" in a handful of statements. NMA PI Br. at 16. These words, however, naturally draw their import from context. Thus, the word "wil" is only a useful indicator that a document is binding in a case where the agency does not explicitly state in plain terms that the document is not binding, as EPA and the Corps stated in the EC Memo. Accordingly, a statement such as the one cited by NMA -- where EPA wrote to the Corps that "108 CW A Section 404 permit applications for surface coal mining activities in Appalachia wil be subject to review in accordance with these procedures," NMA PI Br. at 16 (citing NMA Ex. 14 at 1) -- does not support the conclusion that EP A and the Corps meant the EC Memo to be binding, because the procedures referred to in that statement are explicitly not binding. EC Memo (U.S. MTD Br. Ex. 3) at 3. For the same reason, the two additional statements from the EC Memo cited by NMA (NMA PI Br. at 16) do not support NMA's contention because they, too, are subject to the EC Memo's explicit statement that the procedures are not binding and that 5 Furthermore, even if the EC Memo could qualify as a "rule," it would easily constitute a procedural rule that is exempt from notice-and-comment under the APA. See U.S. MTD Br. at 38-40. - 17 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 24 of 56 the agencies retain discretion. The statements cited by NMA from the Jackson letter (NMA PI Br. at 16 (citing NMA Ex. 2)), also miss the mark, because they appear in a letter that makes it clear that EP A is describing "factors EP A intends to use to screen and evaluate the pending permit applications(.)" NMA PI Br. Ex. 2 (also U.S. MTD Br. Ex. 4) at 2 (emphasis added). Thus, NMA's reliance on the use ofthe word "wil" is misplaced.6 NMA has no likelihood of prevailng on its claim that the EC Process memoranda are legislative rules. 2. The Detailed Guidance Is Not a Legislative Rule. NMA also has no likelihood of prevailng on its challenge to the Detailed Guidance because that document is a quintessential policy statement. As we established in our motion to dismiss brief, U.S. MTD Br. at 40-45, there is nothing about the Detailed Guidance to suggest that EP A intended it to be binding. The document was not incorporated in the Code of Federal Regulations, nor was it published as a proposed or final rule in the Federal Register. See 75 Fed. Reg. at 18,500. In addition, EP A issued the Detailed Guidance as an "interim" document that is open to revision, thus demonstrating that EP A did not intend for the document to create permanent standards. See id.; Detailed Guidance (U.S. MTD Br. Ex. 8) at 1 n.1. Furthermore, the Detailed Guidance states explicitly that it "does not impose legally binding requirements on EPA, the (Corps), the States, or the regulated community, and may not apply to a particular situation depending on the circumstances." Id. at 2 n.3. This statement is consistent with the remainder of the Detailed Guidance, which does not suggest that it imposes mandatory 6 NMA posits that EPA and the Corps have implemented the EC Memo as a binding rule because an EPA letter states that the agencies "committed to" follow the EC Memo procedures. NMA PI Br. at 17. But stating that the agencies have committed to procedures that allow flexibility and the exercise of discretion is hardly evidence of a legislative rule. Along the same lines, there is no merit to NMA's attempt to demonstrate that EPA has applied the MIRA process as a binding rule because letters from the Agency confirm that, in fact, EPA has performed the MIRA assessment. Id. at 18. To the extent that NMA means to suggest that a legislative rule is created whenever an agency says it wil apply procedures which themselves provide for flexibility and exercise of discretion, and then does so, that argument is specious and must be rejected. - 18 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 25 of 56 requirements on EPA's regional offces, state permitting authorities, or the regulated community. See U.S. MTD Br. at 42-44. Instead, as we demonstrated in our motion to dismiss brief, U.S. MTD Br. at 40-45, the document's "pages are replete with words of suggestion." Cement Kiln Recycling CoaL. v. EPA, 493 F.3d 207, 227 (D.C. Cir. 2007). NMA nevertheless alleges that the Detailed Guidance: "directs" permitting authorities to incorporate certain conductivity limits into Section 402 and 404 permits, NMA PI Br. at 20; "makes substantive legal additions to the Section 404(b)(l) guidelines," id. at 21; "has a present, binding effect" and "constrains agency decisionmakers' discretion," id. at 22; and "dictat(es) what constitutes acceptable mitigation measures for Section 404 permits," id. at 21. These allegations, however, are nothing but unsupported and conclusory statements that are contradicted by the plain language of the Detailed Guidance. Tellingly, NMA has failed to pinpoint a single statement in the Detailed Guidance that can be read to direct or dictate anything. For example, although NMA cites pages 12 and 18-21 of the Detailed Guidance for the proposition that the Detailed Guidance "directs State regulatory authorities and the Corps to incorporate (the) conductivity standard into permits," the cited pages include no such directive. Indeed, the document does not give any direction to the Corps (which, of course, is a separate agency and is not covered by EP A guidance)/ but instead is directed at EP A's regional offces. See, e.g., Detailed Guidance (U.S. MTD Br. Ex. 8) at 18 ("Regions should convey their conclusions. . . to the Corps and, if appropriate changes to the permit are not made. . . , may proceed under the (CW A Section) 404(q) (Memorandum of Agreement) and/or Section 404(c)."). As to EPA's regional offces, the document provides no directives, but rather advises 7 Nor does the Detailed Guidance give direction to the state agencies with respect to their CW A Section 402 permit programs. Those agencies are also separate and not covered by the Detailed Guidance. The Detailed Guidance provides direction to EPA's regional offices regarding their review of the states' draft CW A Section 402 permits. - 19 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 26 of 56 as to what steps and analyses they "should" take. Id. at 12, 18-21. In the end, NMA's conclusory and misleading statements do nothing to undermine the clarity of the Detailed Guidance on the key point here: it "does not impose legally binding requirements." Id. at 2 n.3. Unable to identify any text that would suggest the Detailed Guidance is binding, NMA makes a flawed and insubstantial attempt to show that EP A is applying the Detailed Guidance as a rule. As we established in our Memorandum in Support of our Motion to Dismiss, such a claim is, at best, unripe given EPA's limited application of the Detailed Guidance since April 1, 2010. U.S. MTD Br. at 26-29. Certainly, NMA canot conclusively establish that EPA is applying the Detailed Guidance as a rule because, as we demonstrated in' our earlier brief, there are several examples of permits that were issued that did not meet the recommended conductivity parameters set forth in the Detailed Guidance that NMA contends are "binding." Id. at 28-29 & n.12. NMA has failed to identify a single permit that was denied or vetoed as a result of application of the Detailed Guidance. Instead, NMA attempts to show that EP A is applying the Detailed Guidance in a binding fashion. Specifically, NMA contends that "(w)ithout question, EP A has followed through on its assurance that it would use the de facto water quality standard in the Detailed Guidance to impose conductivity limits in pending permits." NMA PI Br. at 20. Setting aside the fact that EPA made no such "assurance," a fair reading of the sources cited by NMA simply does not support the assertion that EP A has imposed conductivity discharge limits in permits. For example, the R. Johnson Declaration states only that "EP A asked the Corps to include conductivity monitoring(.)"8 NMA PI Br. Ex. 4 ~ 14 (emphasis added). The Wells 8 Furthermore, this statement is incorrect insofar as it pertains to conductivity. EPA's only comment letter to the Corps with respect to the Jagger Mine project was issued on September 29, 2010, which is two weeks after the Johnson Declaration was signed. See Letter from T. Wellborn, EPA Region 4, to Co!. S. Roemhildt, Corps Mobile (. . . continued) - 20- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 27 of 56 Declaration states only that a conductivity limit in a Corps permit authorization was "based on comments made by USEP A(.)" Id. Ex. 9 ~ 24 (emphasis added). The Dr. Johnson Declaration references a letter in which EP A explained to the Corps that the applicant agreed to perform conductivity monitoring and EP A "request( ed) that this be made a condition of the Section 404 permit." Id. Ex. 10 att. B (emphasis added). Finally, the EPA letter cited by NMA does not "require" any conductivity limit; rather, the letter is EPA's recommendation to the Corps that the subject permit "should limit" conductivity to below 500 ¡.S/cm. Id. Ex. 18 at 2 (emphasis added).9 Thus, all that NMA's sources establish is that, in connection with a handful of permits, EP A has: asked for monitoring; requested and recommended that the Corps include discharge limitations; and suggested that the Corps include a monitoring condition that was agreed to by the applicant. Based on this evidence, NMA canot succeed on its claim that the Detailed Guidance is a binding legislative rule.10 C. The EC Memoranda and the Detailed Guidance are Fullv Consistent With the CW A and NEP A NMA's argument that EP A has exceeded its authority under the CW A and NEP A is necessarily based on NMA's false predicate that the EC Process and the Detailed Guidance are binding and enforceable rules. If the Court finds that the EC Process and Detailed Guidance Dist. (Sept. 29, 2010) (attached as Ex.14). In that letter, EPA did not recommend that the Corps include conductivity monitoring in the Jagger Mine permit. See id. at 3 (stating that "(t)urbidity monitoring should occur up and downstream of the project site's receiving waterbodies" but making no mention of conductivity). 9 Notably, the two Johnson declarations and the EPA letter all pertain to mining projects in Alabama, which is not one of the Appalachian states subject to the Guidance. 10 NMA also cites a newspaper article in support of the notion that EPA is implementing the Detailed Guidance in a binding fashion. NMA PI Hr. at 20. Even assuming that a newspaper article could be probative on the issue at hand, the quoted statement -- that EPA intends to use the Guidance "to ensure that mining permits. . . provide the protection i:equired under federal law," NMA PI Hr. at 21 -- does not support NMA's argument; rather, it is consistent with the fact that the Guidance creates no new requirements beyond the CW A and existing regulations. - 21 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 28 of 56 challenged by NMA are not legislative rules subject to AP A rulemaking requirements, then there is no need to address the remaining issues raised by NMA, which are relevant, if at all, only if the challenged processes are deemed to be binding and enforceable rules. Nonetheless, we demonstrate below that the EC Process and the Detailed Guidance are consistent with, and authorized by, the CW A and NEP A. 1. The EC Process is Consistent With the CW A As explained in the Factual Background, above, the EC Memo (Ex. 3) does not address the substantive criteria for review of the CW A Section 404 permit applications at issue. It merely establishes a procedure -- agreed to by both EP A and the Corps -- to facilitate their coordinated review of pending permit applications. This process is not inconsistent with the CW A; on the contrar, such coordination is expressly encouraged by the CW A and the Corps' own regulations. i i NMA's argument is based on the erroneous premise that EPA's role in the section 404 permitting process is limited to promulgation of the 404(b)(I) guidelines for the Corps to follow when determining whether to issue a permit, and its exercise of section 404( c) authority to prohibit specification (or "veto") certain disposal sites. NMA PI Br. at 4, 25, citing Coeur Alaska, Inc. v. Se. Alaska Conservation Council, 129 S. Ct. 2458 (2009). Thus, NMA concludes that the EC Process ilegally expands EPA's role in the permitting process. EPA's role, however, is not so limited. i i Similarly, the MIRA did not create a new standard or compel any paricular outcome, nor was it used as a substitue for the Section 404(b)(1) Guidelines. MIRA (Ex. 4) at 2. It was merely a tool employed by EPA offcials to facilitate consideration of the available data in various combinations and identify potential areas of concern. Id. at 1. - 22- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 29 of 56 The CW A authorizes coordination between EP A and the Corps during the permit review process, and expressly requires the agencies to enter into an agreement to facilitate such coordination. 33 U.S.C. § 1344(q). Pursuant to that statutory directive, EPA and the Corps entered into a "Memorandum of Agreement between the Environmental Protection Agency and the Deparment of the Ary dated August 11, 1992" (Ex. 1), expressly recognizing that "the EPA has an important role in the Department of the Army Regulatory Program under the Clean Water Act(.)" MOA (Ex. 1) at Pt. I, ~ 2. The MOA provides that "(p)ursuant to its authority under Section 404(b)(l) of the Clean Water Act, the EPA may provide comments to the Corps identifying its views regarding compliance with the Section 404(b)(I) Guidelines," id., and "(t)he Corps wil fully consider EPA's comments when determining (compliance) with the National Environmental Policy Act, and other relevant statutes, regulations, and policies. The Corps wil also fully consider the EPA's views when determining whether to issue the permit, to issue the permit with conditions and/or mitigation, or to deny the permit." Id. Not only is coordination authorized, but the MOA also sets forth coordination procedures "to provide and encourage communication and full consideration of each agencies' views concerning proposed projects" (MOA (Ex. 1) at Pt. II, ~ 1), and encourages the Corps and EP A to develop: written procedures to ensure effective interagency coordination and to discuss issues, expedite comments, foster strong professional parnerships and cooperative working relationships. These professional parnerships wil be based on EP A providing substantive, project specific comments and the Corps giving full consideration to EP A's recommendations as the Corps makes its determination of compliance with the Section 404(b)(I) Guidelines and the decision on the permit application. - 23 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 30 of 56 MOA (Ex. 1) at Pt. II, ~ 2.12 EP A's role in the Section 404 permitting process is codified in the Corps' own regulations, which require that before the Corps issues a CW A Section 404 permit, it must provide public notice to EP A and other resource agencies, and those agencies may provide comments for consideration by the Corps. 33 C.F.R. § 325.3(d). 13 The EC Process is fully consistent with the coordination process authorized by the CWA and the Corps' regulations. It does not expand EP A's role in the Section 404 permitting process or "relegate the Corps to a virtual lackey with no independent voice in the permitting process" (NMA PI Br. at 25). On the contrar, the Corps remains the final decisionmaker with respect to issuance of the permit, subject only to EPA's exercise of Section 404(c) authority. 2. The Detailed Guidance is Consistent With the CW A NMA argues that the Detailed Guidance is inconsistent with the CW A because it establishes a water quality standard and it unlawflly applies that standard to section 404 permits. NMA is incorrect on both counts. a. The Detailed Guidance does not establish a water Qualitv standard. NMA's argument that EP A has established a water quality standard for conductivity (NMA PI Br. at 9) is based on the fudamentally flawed premise that "the Guidance requires a limit on water quality of 500 /lS/cm." NMA PI Br. at 28. As demonstrated in Par i. B, above, 12 NMA's argument that the EC Process is an unlawful attempt to exercise its 404(c) authority without the procedural requirements (NMA PI Hr. at 25) must be rejected because the the EC Process, like the MOA coordination process, is "in addition to EPA's authority under Section 404(c) of the Clean Water Act." MOA (Ex. 1 ) at Pt. I, ~ 5. 13 To the extent NMA contends that EPA's participation in the process must be limited to the regulatory comment period (NMA PI Sr. at 4), the MOA expressly rejects such limitation and provides that the Corps may discuss issues relevant to the project with EPA after the close of the comment period to either clarify matters or obtain information relevant to the permit decision. MOA (Ex. 1) at Pt. II, ~ 6. - 24- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 31 of 56 the Guidance does not establish a water quality standard or require that any particular limit be established in state-issued CW A Section 402 permits. Rather, the Detailed Guidance provides guidance to the EP A Regions for their review of state-issued NPDES permits, as expressly authorized by the CW A and EP A's implementing regulations. NMA'sassertion that the state has exclusive authority to implement the NPDES program (NMA PI Br. at 6) is also incorrect. Even when a state has been authorized to implement the CWA Section 402 permit program, EP A has continuing oversight authority to ensure compliance of the State program with federal law. 33 U.S.C. § 1342(c)(2) (state programs "shall at all times be in accordance with this section"); 40 C.F.R. § 123.25(a) (state programs must be administered in conformance with EPA regulations). Pursuant to its oversight authority, EPA may comment upon, or object to, a proposed permit. If the state does not respond adequately to an EPA objection, permitting authority for that facility transfers to EPA. 33 U.S.C. § 1342(d). As discussed in the Detailed Guidance, EP A became aware that some states were issuing NPDES permits that did not comply with the existing provisions of the CW A and EP A regulations. Specifically, the CW A requires NPDES permits to contain water quality-based effuent limits when necessary to meet water quality standards. 33 U.S.c. § 1311 (b)(l )(C); 40 C.F.R. § 122.44( d)(l). In order to determine whether water quality-based effluent limits are necessary, the permitting authority is required to conduct a "reasonable potential analysis" to determine whether a discharge wil cause, or has the reasonable potential to cause or contribute to, a violation of applicable numeric or narrative water quality standards. 40 CFR 122.44(d)(I). That analysis must be based on "relevant information." 40 C.F.R. § 122.44(d)(I)(vi). When the analysis suggests that a reasonable potential exists, the NPDES permit must include effluent limits or other permit conditions to ensure compliance with the state's water quality standards. - 25 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 32 of 56 EP A's Permit Quality Review revealed that although states had adopted (and EP A had approved) narative water quality standards for protection against biological impairment of streams, some states were issuing NPDES permits that did not adequately assess the reasonable potential for the discharge to cause violations of the narative standards, and that EP A Regions, in exercise of their oversight authority, were not objecting to those permits. Detailed Guidance (Ex. 8) at 7_8.14 The Detailed Guidance encourages compliance with existing federal law. It identifies areas where state-issued NPDES permits have not been in compliance with existing CW A requirements, as interpreted in existing EP A regulations, and encourages EP A Regions to exercise their existing oversight authority to require compliance. To assist in the development of effuent limits, or other permit conditions where necessary to ensure compliance with the state's narrative water quality standards, the Detailed Guidance provides information regarding recent scientific studies and literature that may be relevant and offers suggestions as to how such information may be incorporated into NPDES permits. In sum, the Detailed Guidance does not establish a water quality standard but, rather, encourages compliance with existing federal law by explaining the regulatory requirements and stating that EP A intends to exercise its statutory oversight authority to ensure that state-issued NPDES permits contain conditions assuring compliance with existing narrative water quality standards adopted by the state. b. The Detailed Guidance properly applies to section 404 permits. As explained in Part I.c, 1, above, although the Corps has the final authority for issuance of Section 404 permits, EP A has an important role in the permitting process. The Corps must evaluate permit applications for compliance with the 404(b)(l) Guidelines and its own 14 As explained in the Detailed Guidance, EPA conducted a Permit Quality Review based on review of permit fies for surface coal mining activities and interviews with state permit writers. The review revealed that as many as 80% of the NPDES permits reviewed raised concerns with respect to compliance with state narrative water quality standards. Detailed Guidance (Ex. 8) at 8. - 26- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 33 of 56 regulations, including "compliance with applicable (EP A) effuent limitations and water quality standards." 33 C.F.R. § 320.4(d). EPA reviews the Section 404 permit applications and makes its own judgments about compliance with the 404(b)(l) Guidelines and threats to water quality. The Detailed Guidance properly counsels EP A Regions regarding the analyses that wil ensure compliance with the 404(b)(l) Guidelines, including compliance with water quality standards, prevention of significant degradation, and full analysis of avoidance, minimization, and (where necessary) mitigation. Detailed Guidance (Ex. 8) at 20. These are appropriate considerations for EP A when reviewing a Section 404 permit application. NMA's argument that EPA is precluded from applying the Detailed Guidance in its review of Section 404 permits is based on a misreading of Coeur Alaska. Coeur Alaska holds that a Section 402 permit is not required for a discharge that is permitted by the Corps under Section 404. Coeur Alaska, 129 S. Ct. at 2467. Nothing in the Detailed Guidance suggests that a Section 402 permit is required to authorize the discharge of dredged or fill material as authorized under the Section 404 permit. More relevant to the issue presented in this case is the second issue considered by the Supreme Court in Coeur Alaska. The Supreme Court held that the Corps was not required to assure compliance with EPA's "new source performance standards" promulgated pursuant to section 306 of the CW A because the 404(b)(l) Guidelines did not expressly require that they be considered. By contrast, the 404(b)(I) Guidelines do require that the Corps evaluate permit applications for compliance with water quality standards; indeed, the Supreme Court in Coeur noted that the Corps' own regulations require the Corps to evaluate permit applications "for compliance with applicable (EPA) effluent limitations (and water quality standards). 33 C.F.R. § 320.4(d)." Coeur Alaska, 129 S. Ct. at 2472. - 27- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 34 of 56 Finally, NMA also asserts that the consideration of water quality-based effuent limits in Section 404 permits improperly allows EP A and the Corps to "cast aside State certifications under Section 401 of the Act." NMA PI Br. at 32. Again, NMA is mistaken. The Corps' regulations provide that "( c )ertification of compliance with applicable effuent limitations and water quality standards required under provisions of section 401 of the (CW A) wil be considered conclusive with respect to water quality considerations unless the rEP A J advises of other water quality aspects to be taken into consideration." 33 C.F.R. § 320.4(d) (emphasis added). Thus, EPA's review of the permit applications with respect to impacts on water quality is fully consistent with the CW A and the Corps' own regulations. 3. The Detailed Guidance is Consistent With NEP A NMA argues that the Detailed Guidance violates NEP A in three respects: 1) that EP A attempts to substitute its preferences for the NEP A procedures adopted by the Corps; 2) that the Detailed Guidance contradicts the Corps' regulation specifying who wil make NEP A decisions; and 3) that the Detailed Guidance "procedures were not subject to notice and comment nor CEQ consultation. NMA PI Br. at 33-35. NMA's arguments must fail because, as noted above, the Detailed Guidance specifically provides that it does not impose legally binding obligations on the paricipating agencies. The Detailed Guidance provides direction but is not an enforceable rule and therefore, canot be read to amend or supplant the Corps' lawflly adopted NEP A procedures. Furthermore, NMA has not and canot point to anything in the Detailed Guidance that is inconsistent with the procedural requirements ofNEP A and Courts have upheld the discretion of federal agencies as to how to achieve those procedural requirements. An agency must be allowed to "exercise its administrative discretion in deciding how, in light of internal - 28- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 35 of 56 organization considerations, it may best proceed to develop the needed evidence. . ." Vt. Yanee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 543-44 (1978) (quoting FPC v. Transcom Gas Pipe Line, 423 U.S. 326, 333 (1976)). NMA has not met its burden of showing how the provisions of the Detailed Guidance are outside the bounds of that agency discretion. II. NMA HAS NOT ESTABLISHED THAT ITS MEMBERS WILL FACE IRRP ARABLE INJURY ABSENT EXTRAORDINARY INJUNCTIVE RELIEF Because a "preliminary injunction is an extraordinary and drastic remedy," the pàry seeking such an injunction must make a "clear showing" that temporary equitable relief is necessary. Mazek v. Armstrong, 520 U.S. at 972. The movant therefore carries a heavy burden not only of demonstrating that "he is likely to prevail on the merits" but also that "he wil suffer irreparable injury" without injunctive relief. Doran v. Salem Inn, Inc., 422 U.S. at 931 (emphasis added). The failure to demonstrate harm is "grounds for refusing to issue a preliminary injunction, even if the other three factors entering the calculus merit such relief." Chaplaincy of Full Gospel Churches v. England, 454 F.3d 290, 297 (D.C. Cir. 2006); accord Power Mobilty CoaL. v. Leavitt, 404 F. Supp. 2d 190,204 (D.D.C. 2005), supplemented by No. 05cv2027, 2005 WL 3312962 (D.D.C. Dec. 7,2005). The burden of establishing irreparable harm is "considerable" and "require(s) proof that the movant's injur is certain, great and actual--not theoretical--and imminent, creating a clear and present need for extraordinary equitable relief to prevent har." Power Mobilty CoaL., 404 F. Supp. 2d at 204 (citing Wisconsin Gas Co. v. FERC, 758 F.2d 669, 674 (D.C. Cir. 1985)); accord Hi-Tech Pharmacal Co., Inc. v. FDA, 587 F. Supp. 2d 1,11 (D.D.C. 2008) ("the alleged injur must be certain, great, actual, and imminent"). "Bare allegations of what is likely to occur are of no value since the court must decide whether the harm wil in fact occur." Wisconsin Gas Co., 758 F.2d at 674 (emphasis in original). Accordingly, "(t)he movant must provide proof. . . - 29- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 36 of 56 indicating that the harm is certain to occur in the near future. . . (and) that the alleged harm wil directly result from the action which the movant seeks to enjoin." Id. In this Circuit, "it is . . . well settled that economic loss does not, in and of itself, constitute irreparable harm." Wisconsin Gas Co., 758 F.2d at 674. "(O)nly economic loss that threatens the surival of a movant's business amounts to irreparable har." Power Mobility CoaL., 404 F. Supp. 2d at 204. Moreover, that economic har wil only warrant injunctive relief when the har is "certain to occur in the near future as a direct result of the threatened action." Id. A. NMA Has Not Demonstrated that the Challene:ed Ae:encv Policies Pose a Certain and Immediate Threat to the Survival of Anv of Its Members. NMA contends that its "small business members are likely to be driven out of business by the delays in permitting that are resulting from the Guidance."is NMA PI Br. at 35. Although NMA speaks of "the small size of some coal operators" and the likelihood that some of those unidentified companies may be forced to shut down, id. at 37, NMA provides no evidence to support those assertions. Instead, NMA relies exclusively on the situation of one company -- an Alabama coal company known as Best Coal, Inc. Id. at 36-37. The President of Best Coal, Randy Johnson, states in his Declaration that the company wil be out of business within 18 months if pending Section 402 and 404 permit applications are not granted by Alabama permitting authorities and the Corps. Id. Ex. 4 ~ 19. NMA has fallen well short of meeting its "considerable" burden. Power Mobility CoaL. v. Leavitt, 404 F. Supp. 2d 190,204 (D.D.C. 2005). As an initial matter, even assuming everything NMA asserts is correct, the possibility that one small company may be fórced to go 15 NMA does not assert that MIRA or the procedures in the EC Memo pose any threat of ireparable harm to its small business members. Indeed, the only so-called small business identified by NMA is a coal company in Alabama whose permit applications were not subject to the EC Process. - 30- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 37 of 56 out of business in March of 2012 is flatly insuffcient to warant an injunction against EP A's use of a guidance document in connection with review of hundreds of draft permits and permit applications associated with surface coal mining across the Appalachian states. Indeed, the fact that NMA is unable to identify a single member company facing a present or imminent threat of shutdown is sufficient to demonstrate that preliminary injunctive relief is unwaranted. But even if the Court were wiling to assume that this potential future injury to one company could justify the broad injunctive reliefNMA seeks, NMA has stil failed to carry its burden for a number of reasons. First, Best Coal is not even a member ofNMA. NMA PI Br. Ex. 4 ~ 2. Instead, Best Coal is a member of the Alabama Coal Association, which, in turn, is a member ofNMA. Id.; see also http://ww.nma.org/about/membership dir.asp (visited Oct. 8, 2010). Because NMA only has standing to sue on behalf of its members, see, Q,, Hunt v. Wash. State Apple Adver. Comm'n, 432 U.S. 333, 343 (l977), NMA canot rely upon the alleged harms to a non-member in order to obtain injunctive relief here. Second, even if Best Coal were a member of NMA, Best Coal is located in Alabama, which is not a state in the Appalachian Region covered by the Detailed Guidance challenged by NMA. The Detailed Guidance provides that "(t)he discussion of the provisions of the CW A, NEPA, and E.O. 12898 in this memorandum focuses on their applicablity to Appalachian surface coal mining operations in Kentucky, West Virginia, Virginia, Ohio, Tennessee, and Pennsylvania." Detailed Guidance (Ex. 8) at 2, no4. Third, even if Best Coal were in a state which is covered by the Detailed Guidance, NMA has not demonstrated that the alleged delay was caused by the Detailed Guidance. The lengthy delays of which Best Coal complains cannot be attributable to the Detailed Guidance, because most of the delay occurred before the Detailed Guidance was issued in April, 2010. Best Coal - 31 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 38 of 56 alleges that it submitted its application for a Section 402 permit to Alabama regulators in July 2008, but that the state authorities did not conclude that the permit application was complete until October 2009, NMA PI Br. Ex. 4 ~~ 9-10 - a gap of 15 months that occurred long before EP A issued the Detailed Guidance. Best Coal alleges that further delay began in October 2009, id. ~ 11, which was six months before EP A issued the Detailed Guidance. Thus, even assuming Best Coal's allegations are true, the Detailed Guidance can only be associated with, at most, 6 of the 27 months that Best Coal contends constitutes delay regarding its Section 402 permit application (i.e., from April, 2010 until the present). The link between the Detailed Guidance and permitting delays is even more tenuous in the context of Best Coal's application for a Section 404 permit. Best Coal states that it submitted a permit application to the Corps in September, 2008, but then made revisions to its application as late as July, 2010. Id. ~ 13. Best Coal provides no clear explanation for the delay, but it certainly canot be attributed to the Detailed Guidance, which did not come into existence until April, 2010. Thus, although NMA attempts to create the impression that Best Coal's Section 404 permit application has been delayed by the Detailed Guidance16 for two years, the very longest delay that could be attributed to the Detailed Guidance is three months. Consequently, there is no basis to conclude that the Detailed Guidance is the direct cause of the delay alleged by NMA. Fourth, NMA cannot establish that the Detailed Guidance is the cause of the alleged delay in the issuance of its permit. The Corps issues Section 404 permits in Alabama and Section 402 permits are issued by Alabama permitting authorities. Although EP A can comment on draft permits and object to or veto a permit, the decision to grant or deny a permit rests with 16 Best Coal itself does not allege that the delays are attibutable to the Detailed Guidance, as NMA is contending. Instead, Best Coal alleges, without specifying a time period, that "the delay in issuance of a modified Section 404 permit is due to EPA's review of the project and EPA's concerns over water quality based on EPA's (Memorandum of Understanding) with the Corps." NMA PI Br. Ex. 4 ~ 14. - 32- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 39 of 56 the Corps for Section 404 permits, and with Alabama regulators for Section 402 permits in that state. As we have established, the Detailed Guidance is not binding on EP A or those permitting authorities. The Corps or state regulators may delay issuance of permits for any number of reasons, or deny the permits on water quality grounds or any other permissible basis. Thus, to the extent that there is a delay in permitting that has affected Best Coal, that delay canot be attributable to the Detailed Guidance. 17 Fifth, the alleged har to Best Coal is clearly not imminent or certain, as is required to establish "irreparable harm." As noted, the company claims that it wil be out of business in 18 months if it does not receive the Section 402 and 404 permits necessary to expand its mining operations. NMA PI Br. Ex. 4 ~ 19. However, 18 months is not imminent. See Meghrig v. KFC Western, Inc., 516 U.S. 479,485 (l996) (noting that an endangerment "can only be 'imminent' if it 'threaten(s) to occur immediately'" (quoting Webster's New International Dictionary of English Language 1245 (2d ed.1934)); Power Mobilty CoaL., 404 F. Supp. 2d at 204 (to be irreparable, harm must be "certain to occur in the near future") (emphasis added). Nor is there any certainty in the alleged harm, given that there is no basis to assume that final permit decisions wil not be issued within 18 months or that this litigation wil not be resolved by March, 2012. Finally, it is impossible to determine whether Best Coal's alleged irreparable har is "actual." Best Coal has made assertions about its assets, but has provided no means to determine whether the asserted financial information is accurate. Moreover, absent that information, it becomes impossible to determine whether it was the delay in permit issuance, as opposed to 17 For these reasons, NMA cannot establish that the requested injunctive relief would abate the alleged ireparable injury. Even if the Court were to enjoin EPA from relying on the Detailed Guidance, there is no certainty that Best Coal would receive the permits it seeks. - 33 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 40 of 56 other factors -- for example, inadequate capitalization or other liabilities -- that is the cause of Best Coal's predicted insolvency in 18 months. For all these reasons, NMA has fallen far short of establishing the irreparable harm necessary to warrant a preliminary injunction. B. The Cost of Ree:ulatorv Compliance Is Not Irreparable Harm. In its next attempt to locate irreparable har stemming from the Detailed Guidance, NMA argues that its members "are likely to incur substantial economic losses as a result of permit conditions being imposed under the Guidance(.)" NMA PI Br. at 35-36. Recognizing that economic loss alone cannot constitute irreparable har, NMA contends that the alleged economic losses here "are unrecoverable because of sovereign immunity," id. at 36, and thus constitute irreparable injur. NMA's contention fails both on the law and the facts. Although some courts have concluded that economic harm can be irreparable where damages canot be recovered due to sovereign immunity, see Chamber of Commerce v. Edmondson, 594 F.3d 742, 770-71 (lOth Cir. 2010), the D.C. Circuit has not adopted this exception to the general rule that economic loss is not irreparable. Furhermore, the exception pressed by NMA fails to take account of the well- established principle that the cost of compliance with a regulatory scheme does not constitute irreparable injury. See Freedom Holdings, Inc. v. Spitzer, 408 F.3d 112,115 (2d Cir. 2005); Am. Hosp. Ass'n v. Harris, 625 F.2d 1328, 1331 (7th Cir. 1980); A.O. Smith Corp. v. FTC, 530 F.2d 515,527-28 (3d Cir. 1976); Natl Medical Care, Inc. v. Shalala, No. 95-0860 WBB, 1995 WL 465650, at *3 (D.D.C. June 6, 1995). As the Third Circuit explained in A.O. Smith, "(a)ny time a corporation complies with a governent regulation that requires corporation action, it spends money and loses profits; yet it could hardly be contended that proof of such an injury, alone, would satisfy the requisite for a preliminary injunction." 530 F.2d at 527. Accordingly, - 34- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 41 of 56 the cost of compliance is not irreparable injury, even where that cost cannot be recovered, because "(s)pending money to comply with the law is simply a fact of doing business."ls IMS Health Inc. v. Sorrell, 631 F. Supp. 2d 429,432 (D. Vt. 2009) (rejecting argument that compliance costs were irreparable harm where sovereign immunity would bar recovery of those costs); accord Pennsy Supply, Inc. v. Susquehana River Basin Comm'n, No.1 :CV-06-2454, 2007 WL 551573, at *3 (M.D. Pa. Feb. 20, 2007) (same). Here, it is undisputed that alleged harms identified by NMA are compliance costs. See NMA PI Br. at 38 (citing "the financial injuries that NMA's members are likely to face. . . from complying with the challenged agency actions" and costs that NMA's members wil incur "(i)n order to obtain and comply with permits"). Because regulatory compliance costs are simply the economic reality of doing business, see, e.g., A.O. Smith Corp., 530 F.2d at 527-28, they canot constitute irreparable har. But even assuming that compliance costs could constitute irreparable harm, NMA has not demonstrated any irreparable har in this case. NMA contends that its member companies "must commit to, and ultimately spend, considerable amounts" to obtain and comply with permits that meet the standards in the Detailed Guidance.19 NMA PI Br. at 38. NMA does not provide any evidence to support this broad statement, but instead relies exclusively upon the circumstances of one company -- a subsidiary of one of its member companies, United Coal Company ("UCC"), as set forth in the Wells Declaration attached to NMA's opening brief. 18 The exception pressed by NMA would swallow the D.C. Circuit rule that economic loss is not irreparable, see Wisconsin Gas Co., 758 F.2d at 674, in any suit against a federal agency where the movant faces some cost to comply with the challenged agency action. Because sovereign immunity would typically shield the agency from a suit to recover those costs, such movants would nearly always establish irreparable injury, thereby undermining the Supreme Court's admonition that a preliminary injunction is a drastic and extraordinary remedy. See Mazurek, 520 U.S. at 972. 19 NMA does not contend that MIRA or the EC Memo have resulted in unrecoverable costs. - 35 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 42 of 56 According to NMA, the Detailed Guidance wil require that company to forego a certain mine reclamation project because the cost of complying with special conditions in a proposed permit issued by the Corps would make the project unprofitable. Id. at 38-39. This example falls well short of the irreparable harm standard established by the D.C. Circuit. As an initial matter, and assuming everything NMA alleges is correct, the possibility that one company may have a proposed project that becomes unprofitable due to the Detailed Guidance is manifestly insufficient to warrant an injunction against EP A's regulatory efforts with respect to hundreds of permits throughout the Appalachian states. In any event, NMA has not established that the alleged costs to the UCC subsidiary are certain, actual, great, or imminent. See Power Mobility CoaL., 404 F. Supp. 2d at 204. Indeed, it is clear that the UCC subsidiar has, at least for now, decided not to pursue the project and, thus, wil incur no costs aside from non-quantified lost profits. Although it is impossible to tell from the Wells Declaration what those profits would have been, it seems unlikely that they would rise to the level of significance necessary to justify an injunction, especially given UCC's annual revenues, which were over $500 milion during 2008?0 See http://ww.unitedcoaI.com/?p=20 (last visited Oct. 18, 2010) ("UCC's metallurgical coal production accounted for approximately 4% of total U.S. metallurgical coal production in 2008. Revenues totaled more than $500 milion in 2008."); CoaL. For Common Sense In Gov't Procurement v. United States, 576 F. Supp. 2d 162, 169-70 (D.D.C. 2008) (explaining that irreparable harm is not present where loss of profits constitutes a small percentage of company revenues). 20 UCC is wholly-owned by Metinvest, which had annual revenues of more than $6 bilion during 2009, and net profits of more than $2.8 bilion for 2008 and $334 milion for 2009, according to the company's annual report. A vailable at htt://www.metinvestholding.com/en/investors/reports/. - 36- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 43 of 56 Moreover, even if lost profits had been quantified, the additional project costs that would allegedly result from the Detailed Guidance are pure speculation. The Wells Declaration itself states that the special permit condition that would allegedly result in the increased costs is "highly ambiguous" as to what it actually requires. NMA PI Br. Ex. 9 ~ 22. Accordingly, the Declaration includes a number of explicit presumptions and assumptions about what the permit might actually require. Id. ~~ 15, 17-18. Furthermore, the alleged water treatment costs projected in the Wells Declaration may not even be necessary, given that they would only come into play if water quality monitoring first demonstrated that additional controls were necessary. See id. ~ 12. In that event, and based on the aforementioned series of presumptions and assumptions -- plus one undocumented cost estimate -- the Declaration concludes that "water treatment costs that could potentially be required from these draft special conditions would likely exceed the selling price of the coal mined by $192 per ton or over $25,000,000 for the project." Id. ~ 14 (emphasis added). This type of contingent speculation about a draft permit condition that is "highly ambiguous" and has not been clarified with the Corps, see id. ~ 25 (citing "the low likelihood of reaching a prompt and reasonably acceptable resolution" of the issue) is manifestly insufficient to support the drastic and extraordinary remedy NMA seeks here. See Wisconsin Gas Co., 758 F.2d at 674 ("Bare allegations of what is likely to occur are of no value since the court must decide whether the harm wil in fact occur.") (emphasis in original); Power Mobilty CoaL., 404 F. Supp. 2d at 204 (to be irreparable, harm must be "certain to occur in the near future"). NMA has also failed to show that the alleged harm is the direct result of EP A's Detailed Guidance. As discussed above, the Detailed Guidance is neither binding nor self-implementing; it merely explains how EP A may exercise its discretion during the permitting process for permits - 37 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 44 of 56 associated with surface coal mining operations in Appalachia. Only when a final permit decision is reached can there be any harm to the permit applicant. In the example relied upon by NMA, the Corps is the permitting authority. Although EP A may have made recommendations to the Corps based on EPA's Detailed Guidance, the Corps is the agency charged with making the final permitting decision (subject to EP A's "veto" authority under CW A Section 404(c)). Unless or until the Corps grants or denies a permit, or EP A vetoes a permit, there is no obligation on the applicant and, thus, no harm. Accordingly, NMA canot establish that the Detailed Guidance is the direct cause of the alleged economic hars in this case?) C. NMA Has Not Demonstrated Irreparable Harm to Propert Interests. In its last attempt to identify irreparable har that stems from the agency policies at issue in this suit, NMA contends that EPA and the Corps, through the EC Process and the Detailed Guidance, are infringing on the property interests ofNMA's members by "delaying and effectively preventing NMA member companies from developing their private property interests." NMA PI Br. at 40. Because interests in real property are unique, NMA contends that the EC Process and Detailed Guidance are causing irreparable harm to NMA's members. Id. This argument is baseless. The cases relied upon by NMA do not suggest in any maner whatsoever that the type of environmental regulation at issue here could qualify as an "infringement" upon property rights suffcient to constitute irreparable harm. Indeed, the rule suggested by NMA would create de facto irreparable har across much of the field of environmental regulation, given that environmental regulations often place conditions on the use 21 NMA also argues that injunctive relief is required because the science underlying the conductivity limits in the Guidance may turn out to be incorrect. NMA PI Br. at 39. Of course, that is always the case with any agency action that is based on science. More to the point, speculation that the underlying science could turn out to be flawed does not create irreparable injur where NMA has otherwise failed to establish that any of its members faces anything more than typical compliance costs. - 38 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 45 of 56 of private property. Such an interpretation of the law would be in plain contravention of the basic principle that preliminar injunctive relief is a drastic remedy reserved for extraordinary circumstances. See Mazurek, 520 U.S. at 972. Moreover, the cases cited by NMA do not support irreparable harm here. To the contrary, those decisions address whether the loss of real property - as may occur in a dispute over ownership or title - can constitute an irreparable harm because land is unique. In RoDa Driling Co. v. Siegal, 552 F.3d 1203, 1210 (10th Cir. 2009), the court refused to "decide whether it would be appropriate to assume the existence of irreparable harm because we are dealing with interests in real property." However, the cour found that the plaintiff had established irreparable harm because the defendant was improperly holding record title to the plaintiff s property and, as a result, plaintiff "simply canot participate in the everyday operations of its own interests, and the damages arising from that denial are incalculable." Id. at 1211. In Pelfresne v. Vilage of Willams Bay, 865 F.2d 877, 883 (7th Cir. 1989), the court stated the "general rule" that "interference with the enjoyment or possession of land is considered 'irreparable' since land is viewed as a unique commodity," but went on to find that the demolition of buildings on land was not irreparable injury. Here, there is no dispute over the ownership or title to any property. Nor is there any allegation that EP A or the Corps are taking possession of any mining property or interfering with the title of coal mines such that NMA's members are unable to paricipate in the everyday operation of their mining operations. Accordingly, NMA has not demonstrated irreparable har and its motion for a preliminary injunction must be denied. - 39- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 46 of 56 D. NMA's Delay in Seekine: Injunctive Relief Further Undermines Its Claims of Irreparable Harm. A delay in seeking injunctive relief, though not dispositive, can "miltate() against a finding of irreparable harm." Mylan Phars., Inc. v. Shalala, 81 F. Supp. 2d 30, 44 (D.D.C. 2000). In this case, NMA seeks to enjoin both the EC Process and the Detailed Guidance. The "EC Process memoranda" NMA is challenging were issued by EP A and the Corps in June, 2009. Yet, NMA waited 13 months (until July 20, 2010) to fie this suit challenging the memoranda.. Given that NMA was wiling to wait more than a year to challenge the EC Process, "despite NMA's belief that the agencies were subverting federal law," NMA PI Br. at 1, NMA's claims of irreparable injur associated with the EC Process memoranda are entitled to no weight. NMA is also challenging the Detailed Guidance, which EP A issued on April 1, 2010. In spite ofNMA's belief that EPA was "subverting federal law," id., NMA waited until July 20, 2010, to challenge the Detailed Guidance. This apparent lack of urgency further undermines NMA's assertion that immediate injunctive relief is necessary here. The Court should therefore deny NMA' s motion. III. THE BALANCE OF EQUITIES WEIGHS IN FAVOR OF THE UNITED STATES The balance of equities tips decidedly in favor of the United States. As indicated above, there is very little weight on the NMA side of the scales because NMA has no likelihood of success on the merits and it has demonstrated no irreparable harm that wil occur in the short term while this case is pending.22 Accordingly, the burden on the United States to shift the balance is very modest, indeed. 22 Because this is a claim brought pursuant to the AP A, it is likely to be resolved on cross-motions for summary judgment without discovery and triaL. Accordingly, the preliminary relief sought by NMA would exist for a relatively short time. - 40- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 47 of 56 In contrast to the utter lack of irreparable har demonstrated by NMA, significant environmental interests are at stake here. Consequently, the equities weigh in favor of allowing EP A and the Corps to review the permit applications in an orderly and coordinated framework as set forth in the EC Process, and support the scrutiny of proposed actions by EP A in accordance with the Detailed Guidance. As recognized by both the Corps and EP A in the Preamble to the MOU: This mining practice often stresses the natual environment and impacts the health and welfare of surounding human communities. Streams once used for swimming, fishing, and drinking water have been adversely impacted, and groundwater resources used for drinking water have been contaminated. Some forest lands that sustain water quality and habitat and contribute to the Appalachian way of life have been fragmented or lost. These negative impacts are likely to fuher increase as mines transition to less accessible coal resources within already affected watersheds and communities. MOU (Ex. 2) at 1. The EC Process and the Detailed Guidance challenged by NMA are designed to "significantly reduce the harful environmental consequences of Appalachian surface coal mining operations, while ensuring that future mining remains consistent with federal laws." Id. at 2. The environmental interests thus weigh heavily in favor of the United States and compel denial of the preliminary injunction. In addition, the United States has a strong interest in the regularity of the administrative process. His important -- not just for this case, but for all regulatory actions -- that non-final and non-binding agency actions are not subject to judicial review. To hold otherwise would encourage premature judicial challenges to agency actions before the administrative process has been completed, would interfere with the administrative process, and unecessarily waste judicial resources. For these reasons, the balance of the equities compels denial of the preliminary injunction. - 41 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 48 of 56 iv. DENIAL OF THE PRELIMINARY INJUNCTION is IN THE PUBLIC INTEREST Absent any likelihood that NMA wil succeed on the merits of its claims, and absent any immediate irreparable harm, there is simply no public interest that would be served by an injunction here. The public interest is served by allowing the Corps and EP A to complete their review and consideration of permit applications in a thoughtful and considered manner as set forth in the EC Process. The public interest would not be served by enjoining the EC Process adopted by the Corps and EP A, and instead imposing arificial barriers between the two agencies, as suggested by NMA. Similarly, the public interest would not be served by enjoining use of the Detailed Guidance. In the absence of the Detailed Guidance, the EP A Regions wil stil exercise their oversight authority to assure compliance with Federal law, and EP A may stil exercise its authority to object to State-issued Section 402 permits and veto Corps-issued Section 404 permits. The Detailed Guidance provides assistance to EP A Regions and facilitates their review of applications for Section 402 permits issued by the States, and applications for Section 404 permits issued by the Corps. The Detailed Guidance thus serves the public interest in the permit process. CONCLUSION For the reasons set forth above, EP A and the Corps respectfully request that the Plaintiffs Motion for Preliminar Injunction be denied. Further, for the reasons set forth in the United States' Motion to Dismiss, as incorporated herein, EP A and the Corps respectfully request that Plaintiff s Complaint be dismissed. Respectfully submitted, IGNACIA S. MORENO - 42- Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 49 of 56 Assistant Attorney General Environment and Natural Resources Division /s/Kenneth C. Amaditz CYNTHIA J. MORRS KENNETH C. AMADITZ Environmental Defense Section Environment and Natural Resources Division United States Department of Justice P.O. Box 23986 Washington, DC 20026-3986 (202) 616-7554 (Morris) (202) 514-3698 (Amaditz) Fax: (202) 514-8865 c. i .morris~usdoi .gov kenneth.amaditz~usdoi .gov OF COUNSEL: KARYN WENDELOWSKI Office of General Counsel U.S. EPA 1200 Pennsylvania Ave., N.W. MC 2355A Washington, D.C. 20460 RUSSELL W. PETIT Office of the Chief Counsel U.S. Army Corps of Engineers Washington, D.C. 20314 - 43 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 50 of 56 - ---- --E'i h " b; t-- \ ~ ..~\:O St~1i';'' R,pfAt,s~m:D __ Cl~ .. \. ..-r~ ""of( PR01~c. UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960 September 29,2010 Colonel Steven J. Roemhildt U.S. AnnyCorps of Engineers rvolJile i)istrict Attn: Candice rvcCullough 218 Summit Parkway Homewood, Alabama 35209 Subject: Pre-I)scharge Notifcation, Best Coal Company - Jagger rvine, SAM 2009-01688-CTM, Jefferson County, Alabama I)ear Colonel Roernildt: The U.S. Environmental Protection Agency (EPA), Region 4, has reviewed the Nationwide Permit (NW) 21 Pre-i)ischarge Notification (PI)N), regarding the proposed 307-acre Jagger Mine in Jefferson County, Alabama. Impacts to jurisdictional waters of the United States include 4,080 linear feet (1f) of intermittent stream, 9,200 If of ephemeraI.stream, and 0.36 acres of wetlands. This project is within the United States Geographic Society Ecoregion 68f of the major Appalachian geographic province. The proposed life of the project is 5 years. EP A recommends that the project be considered under an Individual Section 404 Permit (IP) because the potential impacts are more than minimal, have the potential for cumulative impacts not considered under NWP's, and have the potential to cause or contrbute to an exceedance of applicable State water quality standards. The reasons for our recommendation are discussed below. Water Dependencv "Water dependent" means development that canot physically function without direct access to the body of water along which it is proposed. The test for water dependency should assess both the need of the proposed use for access to the water and the capacity of the proposed water body to satisfy the requirements and absorb the impacts of the proposed use. A proposed project is not considered water dependent if either the use can function away from the water or if the water body proposed is unsuitablefor the use. Where the activity associated with a discharge which is proposed for a special aquatic site does not require access or proximity to or siting within the special aquatic site in question to fulfill its basic purpose (i.e., is not "water dependent"), practicable alternatives that do not involve special aquatic sites are presumed to be available, unless clearly demonstrated otherwise. In addition, where a discharge is proposed for a special aquatic site, all practicable alternatives to the proposed discharge which do not involve Internet Address (URL) . htt://WW.epa.gov Recycledecyclable . PonIed wnli Vegtable O. Based Inks on Reccl Papr (Minimum 3lJÆ. Postconsumer) .J Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 51 of 56 a discharge into a special aquatic site are presumed to have less adverse impact on the aquatic ecosystem, unless clearly demonstratoo otherwise. Ming in general, and specifically this project, does not meet the criteria of water dependency. The applicant has not provided information as to why this project must impact waters of the United States except for economic reasons. The economic discussion does not include a balance sheet detailing a cost analysis that compares the cost of avoidance to mitigation costs - Le., avoidance of aquatic resource impacts may be more economically advantageous than the cost of restoring these ecosystems. A voidance & Minimization The CW A Section 404(b)(1) Guidelines (Guidelines) at 40 CPR 230.1O(a) allows permt issuance for only the least environmentally damaging practicable altemative (LEDPA). No' discharge shall be permitted if there is a practicable alternative to the proposed .discharge which would have less adverse impact to the aquatic ecosystem, so long as the alternative does not have other significant adverse environmental consequences. Section 230.1O(d) of the guidelines states that appropriate and practicable steps to minimize the adverse impacts may be required through project modifications and permit conditions. The proposed project does not offer any avoidance of on-site aquatic ecosystems. All of the aquatic resources on the site are proposed for impact. The Guidelines require an alternatives analysis that selects the LEDP A that satisfies the basic project purpose. While the applicant has parially met the LEDP A requirement by documenting and comparing various mining methods for coal extraction, the analysis is based on purely economic factors and does not include an analysis of environmental impacts of each method. The applicant is encouraged to seek additional avoidance of impacts. Compensatory Mitie:ation Appropriate and practicable compensatory mitigation is required for unavoidable adverse impacts which remain after all appropriate and practicable minimization has been met. The applicant indicates that silvicultue activities on the southern half of the project that have occurred within the last few months in preparation for minig may have degraded on-site aquatic resources with excessive sediment, debris, and chanel alteration. The applicant then used the degraded stream mitigation factors to assess the mitigation credits required. As recently as April 2, 2010, EP A Region 4 expressed written concern over these types of practices wherein silviculture activities in preparation for mining do not follow Best Management Prctices (BMPs) and then cause degradation of aquatic systems. The Mobile Corps District was forwarded a copy of the referenced letter, and a copy is enclosed. EPA made a site visit on September 23,2010, to assess the aquatic effects of the silviculture practices on the site. From the site inspection it was determined that approximately 1,200 If of ephemeral stream (0.05-acre) was impacted by improper application of BMPs. . The sediment in the stream cha.els has remained on-site and downstream water quality has not been affected. The violation is minor in scope and would be best addressed by establishing a working relationship with Best Coal and the landowners to prevent future violations. The applicat has 2 i J Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 52 of 56 agreed to inorm landowners of permit requirement associated with silvicultural operations and to assist EPA and the Corps in ths endeavor. The applicant and consultant wil also verify the mitigation calculations to ensure that appropriate factors are used in the current permit application. The compensatory mitigation should establish success criteria ard adaptive management plan that can be implemented if the compensatory mitigation does not meet its success crteria. Once restored, the compensatory mitigation sites should be preserved in perpetuity. Collection of adequate baseline data wil be dificult if the applicant plans to sta minng in the near futue. Stil, EP A believes the collection of adequate baseline is essential to overall water quality and compensatory mitigation success, and is a requirement of the 2008 Compensatory Mitigation Rule. If the applicant's proposed on-site compensatory mitigation canot fully comply with the 2008 Compensatory Mitigation Rule, then use of approved mitigation bans would be a more suitable approach. Cumulative Impacts There are 95 active coal mines in the Black Warrior River watershed, which includes the Locust Fork River. The cumulative effect of numerous mines does not seem to have been considered by the Corps. This is an additional reason that justifies advertising this project as an IP. An II' wil allow public comment and expand the scope ofreview of the resource agencies to include an analysis of the cumulative effects of mining projects. Water Quality A Water Quality Standards Protection Plan CWQSPP) specific to the proposed mining activity should be adopted before authorizing the final permit. The permit should require that the WQSPP include BMPs and use of Best Available Technology that wil ensure discharges from the mine's permitted outfalls, do not cause, or contribute to violations of the State's narative or numerical water quality standards, iI paricular sediment discharges into the Locust Fork River, which is listed as impaired by sediment in Alabama's 303(d) list. We feel that the stream/river buffers required by the Surface Mining Control and Reclamation Act along with the effuent guidelines are not adequate to protect the Locust Fork River and wil continue to cause degradation of the river. We recommend a 2oo-foot bufer between the mine and associated ponds and the Locust Fork River and Trouble Creek and request the Corps to include this buffer requirement as a condition of the permt. Turbidity monitori~g should occur up and downstream of the project site's receiving waterbodies to ensure that the Alabama tubidity requirements are not violated. The HMPs must be implemented before, durig, and after constrction. HMPs may include but are not limited to, topsoil management, utilzation of silt fences, straw bales, check das, limting vegetation removal with buffers to the maximum extent practicable, mulchig and seeding. Environmental Justice The requirements of Executive Order (E.O.) 12898 and the Presidential Memorandum accompanying it must be addressed appropriately in federal action-such as federal permitting 3 Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 53 of 56 , I. I I i, i, I i I , i I- i \ . I i .__.,_~_..... __-u_ _........ under 404 of the CW A and Nationa Environmental Policy Act. Under E.O. 12898, "each Federal agency shal mae achieving envionmntal justice (EJ) par of its mission by identifyig and addressing, as appropriate, disproportionately high and adverse huma health or environmental effect of its program, policies, and actvities on miority populations and 10w- income populations." EPA would encourage the Distrct to include EJ as par of ths pennts review. Residences may be afectd by changes in grundwater (drinkg water wells), pariculate matter related to respiratory illness, noise, vibrations, and increased trafc. EP A is also concerned that the Nationwide PDN may not have provided the EJ community with a chance to review and comment. Conclusion The EP A, Region 4, has reviewed the PDN regarding the Jagger Mie and recommends that this project be considerd under a Section 404 IP beause the potential inpacts are more than rrmal and have the potential to cause or contrbute to degradtion of applicable State water quality stadards. We ar requestig expanded bufers on the project to protect the Loust Fork River, which is already listed on the Alabama 303(d) list for water quity degradtion from sedìment. The project's compensatory mitigation plan is not complete, design elements lack detail, and should be fuer developed to derve a compensatory mitigation plan that protects aquatic resources in accordace with the 2008 Compensatory Mitigation Rule. Than you for the opportity to comment on this PDN. If you have any questions regardig these comments, please contact Mark Laue (lare. mark (!epa.gov or 404-562-9417) or Dunca Powell (powel1.duncar~epa.~ov or 404562-9258). Sincerely, ~còD- Thomas C. Welborn Chief Wetlands, Coastal, and Ocean Brach Enclosures (2) cc: Elizabeth Brown, AHC, Montgomery, AL Wiliam Pearson. USFWS, Daphne, AL Mattew Marshall, ADCNR, Montgomer, AL Brandy Bowen, ADEM, Montgomery, AL Erc Sanderson, ADEM, Montgomery, AL Randal Johnon, ASMC, Jasper, AL Candice McCullougl USACE, Biringham, AL 4 Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 54 of 56 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA ) NATIONAL MINING ASSOCIATION, ) )Plaintiff, ) )v. ) ) LISA JACKSON, ADMINISTRATOR, ) U.S. ENVIRONMENTAL PROTECTION ) AGENCY, et aI., ) ) Defendants. ) ) No.1 :10-CV-1220-RBW (PROPOSED) ORDER This matter is before the Court on the Motion for Preliminary Injunction fied by Plaintiff, National Mining Association ("NMA"). Having considered the arguments presented by NMA in support of the relief requested, and having considered the arguments presented by the United States in opposition to the preliminary relief requested, including the arguments presented in the United States' Motion to Dismiss the Complaint and the arguments presented by NMA in opposition to the Motion to Dismiss, and having heard and considered argument of counsel, and for reasons apparent to the Cour, it is ORDERED that the Motion for Preliminary Injunction be, and hereby is, DENIED; and it is fuher ORDERED that the United States' Motion to Dismiss be, and herby is, GRANTED. It is so ORDERED this day of ,201_. United States District Judge - 1 - Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 55 of 56 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA ) NATIONAL MINING ASSOCIATION, ) )Plaintiff, ) )v. ) ) LISA JACKSON, ADMINISTRATOR, ) U.S. ENVIRONMENTAL PROTECTION ) AGENCY, et aI., ) ) Defendants. ) ) No.l:10-CV-1220-RBW CERTIFICATE OF SERVICE I hereby certify that on October 20,2010, I fied the foregoing Memorandum in Opposition to NMA's Motion for Preliminar Injunction and a (Proposed) Order with the Court's CM/ECF system which wil cause a copy be served on counsel of record. Is/Cynthia J. Morris Case 1:10-cv-01220-RBW Document 15 Filed 10/20/10 Page 56 of 56