Or. Admin. R. 690-077-0070

Current through Register Vol. 63, No. 5, May 1, 2024
Section 690-077-0070 - Application for Instream Transfer
(1) As provided in ORS 537.348(1), any person may apply for an instream transfer, including a time-limited instream transfer.
(2) In addition to the transfer application requirements described in OAR 690-380-3000, an instream transfer application shall include the following information:
(a) Public use(s) for which the instream right is desired;
(b) Description of the time periods of the instream use and quantity of water to be transferred to instream use;
(c) The location of the proposed instream use. If a reach or lake level is requested, identify the upstream and downstream extent of the reach or the appropriate lake level;
(d) Recommendations, if any, for conditions on the instream water right that would avoid taking away or impairing existing permitted, certificated or decreed rights. Such conditions may include, but are not limited to the instream flow levels in cfs per month or total acre feet, the effective reach(es) or lake levels of the instream flow, measuring locations and the strategy for monitoring the instream flow or lake levels;
(e) If an instream water right exists on the same reach(es) or lake, or on portions thereof, a statement of whether the proposed conversion is intended to add to the amounts of the existing instream water rights or to replace a later priority instream right, or portion thereof, with an earlier priority right;
(f) For a time-limited instream transfer, the duration or number of years for which the time-limited instream transfer is being requested.
(3) The Department may require additional information needed to complete the evaluation of the proposed conversion.

Or. Admin. R. 690-077-0070

WRD 20-1988, f. & cert. ef. 11-4-88; WRD 1-1995, f. & cert. ef. 2-14-95; WRD 5-1995(Temp), f. & cert. ef. 8-4-95; WRD 4-2006, f. & cert .ef. 10-2-06

Stat. Auth.: ORS 536 & 537

Stats. Implemented: ORS 536 & 537