From Casetext: Smarter Legal Research

Native Ecosystems Council v. Lannom

United States District Court, D. Montana, Missoula Division.
Apr 4, 2022
598 F. Supp. 3d 957 (D. Mont. 2022)

Opinion

CV 21-22-M-DWM

2022-04-04

NATIVE ECOSYSTEMS COUNCIL, Alliance for the Wild Rockies, Plaintiffs, v. Keith LANNOM, United States Forest Service Deputy Regional Forester and the United States Forest Service, Defendants.

Rebecca Kay Smith, Public Interest Defense Center, Timothy M. Bechtold, Bechtold Law Firm, Missoula, MT, for Plaintiffs. Hayley A. Carpenter, Paul Gerald Freeborne, Natural Resources Section, DOJ-ENRD, Washington, DC, for Defendants.


Rebecca Kay Smith, Public Interest Defense Center, Timothy M. Bechtold, Bechtold Law Firm, Missoula, MT, for Plaintiffs.

Hayley A. Carpenter, Paul Gerald Freeborne, Natural Resources Section, DOJ-ENRD, Washington, DC, for Defendants.

OPINION and ORDER

Donald W. Molloy, District Judge

This case challenges the United States Forest Service's ("Forest Service") authorization of the Castle Mountains Restoration Project (the "Project") on the Helena-Lewis and Clark National Forest. (Doc. 1.) Plaintiffs are environmental organizations that claim the Forest Service violated the National Environmental Policy Act ("NEPA"), the National Forest Management Act ("NFMA"), and the Roadless Rule in approving the Project. Because some of Plaintiffs’ challenges have merit, remand to the agency is required.

BACKGROUND

The Castle Mountains Project is located east of White Sulphur Springs, Montana. See B2b:0004748 (Figure 1); B5a:0005787. It is intended to "move the Castle Mountains toward a more resilient forest and grassland ecosystem" that both addresses the area's departure from desired vegetation conditions and "reduce[s] the threat of high intensity wildfire." B5a:0005787; see also B2b:0004752. "This would be accomplished through a variety of management tools including mechanical thinning, tree restoration and regeneration, and prescribed fire." B2b:0004730. Although the parties dispute the "description" of the various timber treatments, (see Doc. 18 at ¶ 2), the Project proposes the following:

Treatment

Acres

Stand Improvement Thinning

1,799

Pre-commercial Thinning

419

Quaking Aspen Restoration

287

Meadow Restoration

8,778

Prescribed Fire

8,063

Shrub Planting

7

Total acres proposed for treatment

22,550

B5a:0005789. The Project also includes 45.1 miles of new road construction or reconstruction, B5a:0005789, but authorizes no new permanent roads and "complies with the current travel management covered under the [2007 Travel Management Plan]." B2b:0004753; B5a:0005790. Project activities are anticipated to last five to ten years. B2b:0005271.

The administrative history for the Project goes back to 2011. "As a result of ongoing infestations of mountain pine beetle and spruce budworm at epidemic levels, the Forest Service initiated a landscape assessment to evaluate existing conditions, desired future conditions, and identify possible management practices that were completed in 2011." B2b:0004730; see also B2b:0004749–51. After determining that existing conditions departed from desirable fire conditions, the agency began to develop the proposed action in 2013. B5a:0005788. On February 19, 2015, the Forest Service published a Notice of Intent to prepare an Environmental Impact Statement ("EIS"). B5a:0005798. A draft EIS proposing two action alternatives was published on March 16, 2018, and, following a public comment process, three additional action alternatives were considered. B2b:0004730; see B2b:0004730–34 (summarizing the five alternatives). The Forest Service issued a Final EIS on July 24, 2019, see B2b:0004727–5459; B2c:0005460–577; B2d:0005578–79 (errata), and signed a Record of Decision ("ROD") authorizing Alternative 5 on December 19, 2019, see B5a:0005784–817.

On March 1, 2021, Plaintiffs filed the present action, alleging that the Forest Service violated NEPA and NFMA by failing to properly analyze elk habitat and road density (Claim One); violated NEPA and NFMA by failing to demonstrate compliance with the Forest Plan's old growth and goshawk standards (Claims Two and Five); and violated NEPA and the Roadless Rule by authorizing tree cutting in an Inventoried Roadless Area (Claim Six). (Doc. 1.) Although Plaintiffs initially also raised claims related to the municipal watershed (Claim Three) and whitebark pine regeneration (Claim Four), they have since been withdrawn. (See Doc. 14 at 52.) Summary judgment briefing was completed in September 2021, and oral argument took place on March 31, 2022.

LEGAL STANDARDS

I. NEPA

"Congress enacted NEPA to establish a national policy for the environment." Mm. Comms. for Fire Safety v. Elliott , 25 F.4th 667, 674 (9th Cir. 2022). NEPA "imposes procedural requirements" that are intended to "protect[ ] the environment by requiring that federal agencies carefully weigh environmental considerations and consider potential alternatives to the proposed action before the government launches any major federal action." Native Village of Point Hope v. Jewell , 740 F.3d 489, 493 (9th Cir. 2014) (quotation marks omitted). Among other things, "NEPA requires that federal agencies prepare an EIS for any ‘major Federal actions significantly affecting the quality of the human environment.’ " Id. (quoting 42 U.S.C. § 4332(2)(C) ). "The agency must draft an EIS, notice it for public comment, respond to the comments, and then make an ultimate decision." Mm. Comms. for Fire Safety , 25 F.4th at 674. "NEPA itself does not mandate particular results, but simply prescribes the necessary process." Robertson v. Methow Valley Citizens Council , 490 U.S. 332, 350, 109 S.Ct. 1835, 104 L.Ed.2d 351 (1989).

II. NFMA

"NFMA creates a two-step process for the management of our national forests." Native Ecosystems Council v. U.S. Forest Serv. , 428 F.3d 1233, 1249 (9th Cir. 2005) (" Native Ecosystems Council II "). First, the Forest Service must develop, maintain, and, as appropriate, revise Forest Plans, which provide a framework for where and how certain activities can occur in national forests. Id. ; see also 16 U.S.C. § 1604(f)(1). Second, the Forest Service must ensure that all individual projects within a forest are "consistent with each forest's overall management plan." Native Ecosystems Council II , 428 F.3d at 1249 ; see also 16 U.S.C. § 1604(i). Thus, the basis for forest plan compliance must be set forth with such clarity to be understandable. Native Ecosystems Council v. U.S. Forest Serv. , 418 F.3d 953, 963 (9th Cir. 2005) (" Native Ecosystems Council I ").

In the context of this case, although the Helena National Forest and the Lewis & Clark National Forest were administratively combined in December 2015, management of lands formerly within the boundaries of the Lewis & Clark National Forest are still controlled by the direction found in the 1986 Lewis & Clark National Forest Plan until that Forest Plan is revised. B5a:0005795.

III. APA

Actions under NEPA and NFMA are evaluated under the standards set forth in the Administrative Procedure Act ("APA"), which authorizes a court to "hold unlawful and set aside agency action, findings and conclusions found to be ... arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law" or "without observance of procedure required by law." 5 U.S.C. § 706(2)(A), (D) ; see Native Ecosystems Council v. Marten , 883 F.3d 783, 788 (9th Cir. 2018). Agency action is arbitrary and capricious if the administrative record demonstrates that the "agency has relied on factors which Congress has not intended it to consider, entirely failed to consider an important aspect of the problem, [or] offered an explanation for its decision that runs counter to the evidence before the agency." Motor Vehicle Mfrs. Ass'n of U.S., Inc. v. State Farm Mut. Auto. Ins. Co. , 463 U.S. 29, 43, 103 S.Ct. 2856, 77 L.Ed.2d 443 (1983). Where the administrative record is complete and constitutes the whole and undisputed facts underlying agency decisionmaking, summary judgment is appropriate. City & Cnty. of S.F. v. United States , 130 F.3d 873, 877 (9th Cir. 1997) ("[T]he function of the district court is to determine whether or not as a matter of law the evidence in the administrative record permitted the agency to make the decision it did.").

ANALYSIS

Although not all of Plaintiffs’ claims succeed on the merits, they have identified shortcomings in the Forest Service's environmental review that require further consideration by the agency. That said, this record indicates the Forest Service expended a significant amount of time and effort in assessing the Project, which should not be overshadowed by the specific deficiencies identified herein.

I. Administrative Exhaustion

The Forest Service first argues that Plaintiffs either failed to raise their claims during the administrative review process or failed to adequately plead them, and therefore cannot do so now. Because the Forest Service is correct in part, summary judgment is granted in favor of the agency on Claim Two and narrow aspects of Claims One and Six as outlined below.

Under the APA, Plaintiffs are required to exhaust the available administrative remedies before bringing their claims in federal court. 5 U.S.C. § 704. "Statutes and regulations governing the Forest Service reiterate the administrative exhaustion requirement." Idaho Sporting Cong., Inc. v. Rittenhouse , 305 F.3d 957, 965 (9th Cir. 2002) (citing 7 U.S.C. § 6912(e) and 36 C.F.R. § 215.20 ). But claimants need not use "precise legal formulations," and may "alert[ ] the decision maker to the problem in general terms." Id. Basically, "[c]laims must be raised with sufficient clarity to allow the decision maker to understand and rule on the issue raised, but there is no bright-line standard as to when this requirement has been met." Id. However, exhaustion requires "objection," not just comments. See 36 C.F.R. §§ 218.1 – 218.16. Pursuant to those provisions, "[o]bjections must be filed in writing," id. § 218.8(a), and "[i]ncorporation of documents by reference is not allowed," id. § 218.8(b).

Here, Plaintiffs’ involvement in the administrative process includes pre-Project comments in 2013, see E8:0010124–27; scoping comments in May 2015, see E34:0010183–90; comments on the Draft EIS in 2018, see B1k:0004155–79, B1l:0004180–208; and objections from September 2019, see B4e:0005715–69. The Forest Service argues that all of Plaintiffs’ claims that are being pursued here—Claims One, Two, Five, and Six—were not exhausted in this process. They are addressed in turn.

A. Claim One

Claim One alleges that the Forest Service violated NFMA and NEPA by not complying with the elk habitat effectiveness standards and road density limitations articulated in a document commonly known as the "Eastside Assessment." (See Doc. 1 at ¶¶ 180–86.) According to the Forest Service, Plaintiffs’ comments and objections never once mention the Eastside Assessment or unauthorized roads, nor do they contend that the Project violated road density standards. Although the Forest Service is correct that Plaintiffs’ comments and objections are not as targeted as their current challenge, they were sufficient to alert the agency "to the problem in general terms." Rittenhouse , 305 F.3d at 965.

According to the Forest Service, Plaintiffs’ comments regarding elk habitat effectiveness and road density are limited to two pages and are focused on only one management area. See B1l:0004192–93. While that characterization of that specific comment is correct, the substance of the comment lines up with the current challenge: does the Project meet elk habitat effectiveness standards at the levels recommended for Management Area C? Plaintiffs’ 2018 comments also raise the concern that elk habitat effectiveness percentages do not meet the best available science (Christensen et al. (1993)), B1k:0004160, which is that used in the Eastside Assessment. Plaintiffs’ 2018 comments specifically reference concerns regarding road density, B1k:0004156, and the implications of the 2007 Travel Plan, see B1l:0004201–02. They also reference road density concerns in Management Area C, B1l:004192–93, as well as the agency's failure to address the State's concerns; see also B1k:0004155 (indicating EIS must include comments from state agency); B2c:0005534 (agency response regarding state comments).

Plaintiffs’ 2019 objections express specific concern as to how road density—specifically temporary roads—will impact elk habitat effectiveness as it is conceptualized in a 2013 "white paper," see B4e:0005765, which is the Eastside Assessment. The Forest Service undeniably understood Plaintiffs’ objection, as its response references the Eastside Assessment by name. See B2c:0005528, 5542; see also H14:0055948 ("The objector also contends that the FEIS did not appropriately use the document ‘[Eastside Assessment]’ ...."). Likewise, the agency cited the Project's compliance with the 2007 Travel Plan in response to road density inquiries. See B2c:0005497. Thus, Plaintiffs’ habitat effectiveness, temporary roads, and road density challenges were properly exhausted.

Nevertheless, the Forest Service argues that any challenge based on illegal roads is waived because it was not pled here. That argument is persuasive. " Federal Rule of Civil Procedure 8(a)(2) requires that the allegations in the complaint give the defendant fair notice of what the plaintiffs’ claim is and the grounds upon which it rests." Pickern v. Pier 1 Imports (U.S.), Inc. , 457 F.3d 963, 968 (9th Cir. 2006). Here, the Complaint focuses on the Project's failure to account for temporary roads in its road density calculations. (See Doc. 1 at ¶¶ 45–93.) While part of that claim questions the agency's road density calculation overall, (see, e.g. , id. at ¶¶ 55–61, 71–75), the Complaint makes no reference to "illegal" or "closed" roads. Given that there are entire cases premised on an agency's consideration of such roads, see All. for the Wild Rockies v. Probert , 412 F. Supp. 3d 1188 (D. Mont. 2019), this omission meant the Forest Service was not given fair notice of such a challenge. Accordingly, summary judgment is granted in favor of the Forest Service on this narrow part of Claim One.

B. Claims Two and Five

Claims Two and Five allege that the Forest Service violated NFMA and NEPA by failing to use the old growth definition from the Forest Plan and by failing to properly report on the northern goshawk, a management indicator species for old growth. (See Doc. 1 at ¶¶ 187–94, 204–06.) The Forest Service persuasively argues that Plaintiffs failed to exhaust the former but not the latter.

Plaintiffs’ administrative objections regarding old growth focus on the paucity of such growth in the forest and the Forest Service's alleged "failure to inventory old growth to meet forest plan standard." B4e:0005742. Absent from that challenge is any specific reference to the Forest Service's definition of "old growth" in this context. To the contrary, Plaintiffs’ comments specifically advocate the use of the definition (Green et al. 1992) that was applied here: "The project will violate the NEPA if there are no valid surveys for old growth habitat within each project area, as identified by Green et al. 1992 ...." B1k:0004164; see also B1k:0004165 (same). And Plaintiffs’ other comment criticizes the Forest Plan's old growth standards, stating "[t]he Forest Plan direction for old growth is 30 years outdated," B1l:0004198, and it "lacks inclusion of more current science," B1l:0004199. Plaintiffs’ current challenge—i.e., that the Forest Service should have used the Forest Plan definition rather than Green et al. 1992—therefore contradicts the position they took during the administrative process. As a result, Claim Two was not exhausted.

As for goshawk, the Forest Service argues that Plaintiffs’ comments were limited to "generalized concerns regarding how the Project would impact goshawk foraging habitat," not the specific monitoring challenge raised now. (Doc. 17 at 15.) Plaintiffs raised numerous comments and objections related to the goshawk. E34:0010185; B1l:0004188–90; B4e:0005718, 5734, 5747–48, 5751–64. While the Forest Service is correct that most of these challenges center on "post-fledgling areas," with particular focus on the "foraging habitat," Plaintiffs persuasively argue that the present challenge—i.e., the agency's failure to report a decrease in active nesting territories—was not known because it was not disclosed in the decision documents. See B2b:0005313 ("All alternatives comply with this monitoring requirement because there has been no such decrease in active nesting territories, see Northern Goshawk Monitoring Summary 2016 in project record."). Additionally, Plaintiffs’ comments identify continued concern with the EIS's evaluation of nesting habitat, with an emphasis on the importance of accurate monitoring. See E34:0010185 ("The Forest Plan requires that goshawk populations be monitored. What is the current population trend on the Forest, and how will this be affected if territories in the Castle Mountains are abandoned due to this project?"); B4e:0005752–55; see also B1k:0004168 (requesting that the agency "disclose whether you have conducted surveys in the Project area for ... northern goshawk ... as required by the Forest Plan"). Contrary to the Forest Service's characterization, this is not like Native Ecosystems Council v. Welden , where the plaintiffs "conjured new claims and arguments on summary judgment." 2011 WL 13193257, at *15 (D. Mont. June 7, 2011). If anything, Plaintiffs’ present goshawk claim is significantly narrower than that presented during the administrative process. (See Doc. 1 at ¶¶ 154–63.) Claim Five was exhausted.

C. Claim Six

Finally, Claim Six alleges that the Project violates the Roadless Rule (a regulation prohibiting road construction and tree cutting in certain areas) and that the record does not explain how the Forest Service will implement Project activity in the Inventoried Roadless Area. (Doc. 1 at ¶¶ 207–30.) The Forest Service argues that this claim was not raised in Plaintiffs’ comments or objections and that the second argument was not pled; the agency is correct as to the latter.

In their 2018 comments, Plaintiffs requested the Forest Service "[d]isclose how [the] Project complies with [the] Roadless Rule," B1k:0004159, and they challenged the agency's justifications for "restoration," B1l:0004181–85. As it relates to the specific claims here, the 2018 comment also specifically reference a misrepresentation of the "level of grassland/shrublands," B1l:0004184, question how the Forest Service will be able to access treatment units, B1l:0004185, and assert that "[t]here is no map of the roadless area expanse" and an existing maps are "extremely difficult to read," B1l:0004186–87. In response, the Forest Service argues that even if this challenge was articulated in the comments, it was not preserved in the objections. See 36 C.F.R. § 218.14(a). That is not accurate, however, as Plaintiffs’ 2019 objections specifically allege a violation of the Roadless Rule, see B4e:0005717, and question how the treatment units will be accessed in the Roadless Areas, B4e:0005730, 5738. Plaintiffs also consistently argue that the agency is using "restoration" terminology to hide the true purpose of the action: timber management, B4e:0005724. And once again, the agency's response to Plaintiffs’ comments and objections indicates that it understood the nature of the challenge. See B2c:0005513.

Nevertheless, the Forest Service persuasively argues that Plaintiffs’ access challenge was not properly pled. Although raised during the administrative process as discussed above, this specific challenge is not in the Complaint. See Navajo Nation v. U.S. Forest Serv. , 535 F.3d 1058, 1080 (9th Cir. 2008) ("[W]here, as here, the complaint does not include the necessary factual allegations to state a claim, raising such a claim in a summary judgment motion is insufficient to present the claim to the district court."). Summary judgment is therefore granted in favor of the Forest Service on this narrow part of Claim Six.

II. Road Density and Elk Habitat (Claim One)

Plaintiffs first argue that the Project analysis of elk habitat violates NEPA and NFMA by failing to comply with elk habitat effectiveness standards and road density limitations. The Forest Service disputes the applicable standards but maintains that even if Plaintiffs’ standards govern, "the Project follows them, and thus complies with NFMA and NEPA." (Doc. 23 at 15.) The Forest Service further maintains that the Project is consistent with the road density requirements outlined by the 2007 Travel Management Plan and that because the Project does not create any permanent roads, it will not affect road density considerations. Plaintiffs persuasively argue that the Project raises both habitat effectiveness and road density concerns that the agency did not adequately consider.

A. Elk Standards

The first issue as it relates to elk is what standards apply. The Forest Plan contains two relevant elk habitat effectiveness standards. "Habitat Effectiveness refers to the percentage of available habitat that is usable by elk outside the hunting season." B2b:0005229. First, "Habitat Effectiveness will be positively managed through road management and other necessary controls on resource activities." A1:0000122. Second, the Forest Plan requires that in the management of all areas and trails, "[e]lk habitat effectiveness will be maintained." A1:0000125. But these requirements only apply to Management Area C, with is only one of eight Management Areas in the Project area. B2b:0005453.

Plaintiffs argue that in addition to the above standards, the Project must also comply with the recommendations outlined in the Eastside Assessment. Plaintiffs’ argument is premised on Forest Plan Standard C-1(2), which states: "When more site specific management recommendations [for various wildlife habitat situations] are available through the Forest Service or [Montana Department of Fish, Wildlife and Parks] those recommendations will be followed." A1:0000054. According to Plaintiffs, the most recent site-specific management recommendations available are set forth in the Eastside Assessment. B2b:0005251; F1_446:0032192–227. And the Project EIS concedes—as did the agency at oral argument—that "[t]he best available science for elk habitat management on National Forests in Montana east of the Continental Divide is the Eastside Assessment[.]" B2c:0005527.

The Forest Service argues, however, that the Eastside Assessment is not a "site-specific management recommendation" as envisioned by the Forest Plan, see A1:0000054, noting the introductory language in the Eastside Assessment: "These are recommendations only, and the group is not making decisions or setting policy for either agency in this effort," F1_446:0032192. According to the agency, "[s]urely, such a clear, narrowly-drawn statement overcomes the forest plan's general directive to follow recommendations." (Doc. 17 at 21.) But Plaintiffs have the better argument because the Forest Plan's plain language encompasses "recommendations," see A1:0000054, which is exactly what the Assessment purports to be, see F1_446:0032192. That conclusion is only reinforced by the "Plan Compliance" documents in the record, which state that Forest Plan Standard C-1(2) was met for the Project because the "[b]est available science was used to assess project affects to wildlife and important habitat resources." G18a:0054998. As mentioned above, the Project EIS recognizes the Eastside Assessment as the best available science in this context. See B2c:0005527. Plan compliance was also premised on incorporating site specific recommendations provided by the Montana Fish, Wildlife and Parks, see G18a:0054998, which specifically recommended implementation of the Eastside Assessment, see E28:0010173.

Accordingly, the Project analysis must consider the recommendations outlined in the Eastside Assessment in addition to the Forest Plan Standards.

B. Habitat Effectiveness

Plaintiffs first argue that the Project EIS fails to analyze habitat effectiveness or show that the Forest Service is maintaining habitat effectiveness, in violation of NEPA and NFMA. Specifically, Plaintiffs argue that the Forest Service refused to conduct a habitat effectiveness analysis and misrepresented the impact of temporary roads. Plaintiffs are correct on both fronts.

According to the Project EIS, a site-specific analysis of elk habitat effectiveness was not required because "this project proposes no changes to the 2007 Travel Plan decision," B2b:0005229, and "[t]he Eastside Assessment states that temporary routes can be reasonably excluded from this analysis," see B2c:0005527. But the Eastside Assessment specifically contemplates project-specific analysis of habitat effectiveness and temporary roads, even if a travel plan is in place: "Where travel management decisions have been made, and consideration was given to habitat effectiveness in the overall decision, habitat effectiveness at the project level should focus on the additional temporary project routes and their potential to reduce elk use of important summer habitat." F1_446:0032209. The Assessment further states: "consistent, frequently-used non-public routes or temporary roads would detract from habitat effectiveness if such roads are used during the summer. The specific situation should be addressed at the project level and needs to be interpreted relative to potential for displacement of elk." F1_446:0032209 (citation omitted).

In response, the Forest Service highlights that the Project only adds roads that are non-public and temporary, "which are presumably less intensive than either of the examples quoted above." (Doc. 17 at 23.) But such a presumption does not mean the agency can forgo its obligation to consider the environmental impacts of a project or that temporary roads can be excluded from the analysis. To the contrary, the Eastside Assessment specifically states "[t]he specific situation should be addressed at the project level." F1_446:0032209. The Forest Service's own science states that "[a]ny motorized vehicle use on roads will reduce habitat effectiveness. Recognize and deal with all forms of motorized vehicle and all uses, including administrative uses." F1_71:0013045. Thus, temporary roads are an "important aspect of the problem" by the agency's own measure. Motor Vehicle , 463 U.S. at 43, 103 S.Ct. 2856. And it was arbitrary and capricious for the Forest Service to represent that "[t]he Eastside Assessment states that temporary routes can be reasonably excluded from this analysis." See B2c:0005527. Even so, the Forest Service maintains that further analysis of habitat effectiveness was not necessary because "this project proposes no changes to the 2007 Travel Plan decision," B2b:0005229, and the record adequately explains that temporary roads will only have a negligible effect on habitat effectiveness. Neither argument is persuasive.

In regard to tiering to the Travel Plan, the Final EIS conditions its reliance on the fact "that no new roads are proposed with this vegetation management project, and temporary road use will not exceed administrative levels." B2b:0005230. Thus, the effectiveness of this tiering—and NFMA compliance—depends on whether the agency did in fact adequately consider temporary roads. This conclusion is consistent with two previous decisions of this Court. See Native Ecosystems Council v. Krueger , 946 F. Supp. 2d 1060, 1067 (D. Mont. 2013) (remanding for agency to provide "a full and fair discussion of the impact that temporary roads will have on elk during the Project's lifetime"); Native Ecosystems Council v. Weldon , 848 F. Supp. 2d 1207, 1219 (D. Mont. 2012), vacated due to mootness , 2012 WL 5986475 (D. Mont. Nov. 20, 2012) ("Neither the 1993 nor the 2002 papers from Christensen and Lyon suggest that temporary roads constructed during a timber sale are immune from concerns related to elk habitat and viability. Indeed, the opposite is true[.]").

The Forest Service insists, however, that unlike the situation in either Krueger or Weldon , this record contains a discussion of temporary roads, upon which it was reasonable for the agency to conclude they would have a minimal effect. According to the Forest Service, temporary roads only "have the potential to diminish the quality of elk habitat if the level of use associated with that route exceeds administrative levels." G2_3:0035690. The Forest Service therefore concluded that because "[t]he level of use on administrative temporary routes in the Castles project is not anticipated to exceed administrative levels, ... there would be no measurable effect on elk use of the area associated with that use." G2_3:0035690. The agency also explained that "any temporary roads needed to treat units will not be open to the public and will be decommissioned and removed after implementation ...; therefore, any impact on big game due to temporary routes used for project activities would be immeasurable and insignificant." B2b:0005257.

Plaintiffs criticize this analysis on many levels, first challenging the Forest Service's reliance on an internal memo that post-dates the Draft EIS and Final EIS and was not subject to public comment. The memo is dated November 4, 2019 and titled "Clarification to the Castle Mountains Restoration Project Big Game Report Alternative 5 (preferred alternative)." See G2_3:0035690–91. While it undisputedly provides the most direct analysis of temporary roads, Plaintiffs insist that the agency cannot rely on this non-NEPA document to bolster the analysis in the Final EIS. See League of Wilderness Defs. v. U.S. Forest Serv. , 549 F.3d 1211, 1219 (9th Cir. 2008) (holding cumulative effects analysis insufficient "because it cannot tier to a non-NEPA document"). The Forest Service maintains, however, that the memo merely clarifies what is in the EIS and that the EIS does not need to contain all supporting information. While the Forest Service is correct that an EIS need not restate studies and science, "the public must be adequately informed of the probable significant environmental impacts by an impact statement." Trout Unlimited v. Morton , 509 F.2d 1276, 1284 (9th Cir. 1974). Thus, the EIS must contain an "adequate" discussion of temporary roads; it does not.

Though the Forest Service characterizes the Final EIS as containing a "thorough[ ]" discussion of temporary roads, (Doc. 17 at 12), the primary cited page of the EIS merely states: "Based on the Eastside Assessment, temporary or administrative routes can be reasonably excluded from the analyses; therefore, any impact to big game due to temporary routes used for project activities would be immeasurable and insignificant." B2b:0005257. As discussed above, this conclusion is premised on a misrepresentation of the Eastside Assessment. "To take the required "hard look" under NEPA, "an agency may not rely on incorrect assumptions or data in an EIS." Native Ecosystems Council , 418 F.3d at 964 (citing 40 C.F.R. § 1500.1(b) ); see also Nat. Res. Def. Council v. U.S. Forest Serv. , 421 F.3d 797, 811 (9th Cir. 2005) ("Where the information in the initial EIS is so incomplete or misleading that the decisionmaker and the public could not make an informed comparison of the alternatives, revision of an EIS may be necessary to provide a reasonable, good faith, and objective presentation of the subjects required by NEPA.")

Nor do other parts of the Final EIS provide the necessary support. (See Doc. 23 at 13.) The cited material states that "skid trail rehabilitation and road decommissioning and storage on haul routes" will have short term direct effects and possible long term indirect effects on goshawk, B2b:0005288; "[t]emporary haul routes would, in the short term, add to the cumulative forest edge effect [on migratory birds] but would be re-vegetated overtime," B2b:0005283; construction of temporary roads is expected to cause "destruction of nests or direct mortality of adult or juvenile [migratory] birds," B2b:0005275; temporary roads may displace lynx, but the impacts will be limited by low volume and road speeds, as well as "[r]estricting temporary roads to project activities only," B2b:0005339–40; temporary roads will have undefined short term direct effects on big-eared bats, B2b:0005389; and temporary roads "are not expected to be a barrier to wolverine movements," B2b:0005404. But this information merely reinforces the proposition that temporary roads do in fact have a cognizable impact on the environment within the Project area. And, as it relates to Plaintiffs’ primary elk challenge under the Eastside Assessment, the cited language once again relies on the incorrect conclusion that temporary roads need not be considered in the elk context, B2c:0005527, 5545, especially if they only reach administrative use levels, B2b:0005252, 5257.

Moreover, Plaintiffs present compelling record evidence that elk habitat effectiveness levels are not currently being met in the Project area and that those levels will only worsen during Project implementation. Pursuant to the Eastside Assessment, "[i]n those areas where there is a desire to improve and/or maintain elk habitat use, we recommend maintaining or decreasing road densities that correspond with the desired habitat effectiveness level per Christensen et al. (1993)." F1_446:0032208. "For areas intended to benefit elk summer range and retain high elk use, habitat effectiveness related to motorized routes should be 70% or greater." F1_446:0032208. On the other hand, "[f]or areas where elk are one of the primary resource considerations habitat effectiveness should be 50% or greater." F1_446:0032208. "In situations involving elk summer range where habitat effectiveness is less than 50% elk use potential (which equates to an open motorized density of about 2 miles/square mile), these areas must be recognized as making only minor contributions to elk management goals." F1_446:0032208 (citations omitted). Nevertheless, the Eastside Assessment specifically "recognize[s] that due to the [Forest Service]’s multiple use mandate ... there will be areas that are managed for habitat effectiveness of less than 50% elk use potential." F1_446:0032208. In Forest Management Area C, the Forest Plan has identified "[m]aintain[ing] or enhanc[ing] existing elk habitat by maximizing habitat effectiveness as a primary management objective." A1:0000121. Accordingly, habitat effectiveness "should be 50% or greater" in those parts of the Project area that fall within Management Area C. F1_446:0032208.

At oral argument, the Forest Service implied that because the 50% standard is limited to Management Area C, the alleged violation of the 50% standard across the Project area was overstated. However, it appears that at least over one-fourth of the Project area is considered Management Area C, see B2b:0005453, and contains the second-highest amount of total road miles, see H11:0055857.

According to Plaintiffs, the current habitat effectiveness is between 34% and 38% based on total mileage of roads and the size of the Project area, depending on whether the calculation includes the 52.1 miles of "jeep trails." (See Doc. 14 at 13–14.) And that percentage only gets worse after Project implementation, as the Project authorizes 45.1 miles of new road construction or reconstruction: (1) 9.7 miles of new road construction of temporary roads, (2) 25.7 miles of road reconstruction, and (3) construction of an additional 9.7 miles of new roads on existing trails. B5a:0005789. Thus, the record indicates that habitat effectiveness levels are being violated in the status quo, let alone under the proposed Project. It is difficult to assess the accuracy of Plaintiffs’ contention, however, as the Final EIS admits to containing no analysis of this issue. Accordingly, supplemental analysis is required for both NFMA and NEPA compliance.

C. Road Density

Plaintiffs present additional challenges to the Forest Service's consideration of road density, arguing that the Project violates road density standards in specific areas without adequate explanation and fails to disclose accurate existing road conditions. The bedrock of the road density analysis in the Project EIS is, once again, the 2007 Travel Plan. Plaintiffs argue that there is no indication that the 2007 Travel Plan "accurately reflects the true existing condition of roads on this landscape." (Doc. 14 at 25.) In response, the Forest Service insists that "Plaintiffs present no persuasive evidence that the Travel Plan has not been implemented to such an extent that it was unreasonable for the Service to base the road density calculation on it." (Doc. 17 at 29.) Plaintiffs have the better argument.

The 2021 Biological Assessment for the "Ongoing Travel Plan" indicates that only approximately 40% of the decision miles have been implemented. See H29:0056306. The Forest Service's only real response to this is that the Travel Plan data is extra-record. But, as argued by Plaintiffs, both the ROD and Biological Assessment for the Travel Plan are in the record, see H9:0055731–820; H29:0056299–317, and, more importantly, the Project is actually tiered to them. Additionally, the Project EIS itself reflects implementation concerns. The EIS concedes that "in many places, recovery has been slow, road templates remain, and unauthorized motorize use continues, and in some cases, expands off existing templates." B2b:0005161. The Forest Service emphasizes that the "slow recovery" is associated with "unused closed roads," B2b:0005161, and "[t]he management area direction for roads management refers to public access," see B2b:0005234. But reliance on the Travel Plan includes reliance on the Travel Plan's designation of and the restrictions placed on certain routes. If more use is occurring than contemplated in those designations, the impacts to the environment exceed the assumptions made by the agency in this record.

And while the parties disagree on the actual road density based on the underlying data, compare H11:0055875–917 with G2_16:0038014, that dispute merely emphasizes the failure of a clear record on the existing road density, and the agency's resultant inability to take a hard look at the Project's impacts and its compliance with road density limits. The agency cannot avoid this review simply by asserting that the Project creates no new "permanent" roads. While the agency may ultimately be correct that Project roads do not contribute to the road density calculation, that conclusion must be assessed against an accurate road density baseline. Because it was arbitrary and capricious for the agency to rely on assumptive conditions that are belied by the facts in the record and on the ground, remand is required for the agency to assess existing road conditions, recognizing the actual—not aspirational—implementation of the Travel Plan.

D. Montana Fish, Wildlife and Parks’ Concerns

Finally, Plaintiffs argue the Project violates NEPA because the EIS does not disclose state agency concerns about road density and lack of security in the Project area. Under NEPA, "the agency shall discuss [in the draft EIS] all major points of view on the environmental impacts of the alternatives including the proposed action." 40 C.F.R. § 1502.9(b). Additionally, "[t]he agency shall discuss any responsible opposing view which was not adequately discussed in the draft statement and shall indicate the agency's response to the issues raised." 40 C.F.R. § 1502.9(c). The failure to do so is a violation of NEPA. Ctr. for Biological Diversity v. U.S. Forest Serv. , 349 F.3d 1157, 1167 (9th Cir. 2003).

Here, Montana Fish, Wildlife and Parks submitted scoping comments in May 2015 recommending that the Forest Service follow the Eastside Assessment and maintain effective closures for temporary roads. See E28:0010173–74; see also E11:0010131–33 (2013 comments). Plaintiffs argue that the Forest Service violated NEPA by not addressing those comments in the Final EIS. See B2c:0005493–5577 ("Appendix C Response to Comments"). According to the Forest Service, "this view is not opposing and was submitted only as a scoping comment during the development phase of the Project, not as a comment during the actual comment period." (Doc. 17 at 31.) Although the Forest Service's response is lackluster, the State did not pursue these concerns through the entire administrative process. This is a Pyrrhic victory for the agency, however, as it must now address on remand concerns the State identified early in the process.

III. Goshawk

Plaintiffs further argue that the Project EIS fails to comply with the Forest Plan requirements for goshawk, a designated management indicator species for old growth forest. A1:0000347; see also B2b:0005364. The Forest Plan requires the Forest Service to annually monitor goshawk nests with a 100% sample and report "active nesting territories." A1:0000323 (Item C-8). The Forest Plan mandates that the "Variability Which Would Initiate Further Evaluation" is a "Decrease of 10% or more in active nesting territories." A1:0000323 (Item C-8). Additionally, the Forest Plan states that the "[e]valuation of data gathered during the monitoring will be guided by the Decision Flow Diagram," A1:0000319, and the resulting "evaluation report will be made available for public review," A1:0000320. Plaintiffs argue that the EIS failed to disclose a decline in active goshawk nesting territory and the Forest Service failed to conduct the requisite evaluation report in response to the decline. In response, the Forest Service argues (1) Plaintiffs’ claim is not a reviewable site-specific challenge and (2) even if it proceeds to the merits, Plaintiffs’ claim fails because the Forest Service considered the "relevant factors" in evaluating a greater-than-10 percent decrease in goshawk occupancy in 2017. Neither of the agency's arguments is persuasive.

A. Site-Specific Challenge

The Forest Service first argues that the failure to produce a report on forest-wide decline of the goshawk is not a "site-specific" challenge appropriate for review. "Forest-wide management practices and monitoring efforts, or lack thereof, are generally not amenable to suit under the APA because they do not constitute final agency actions." Ecology Ctr. v. Castaneda , 574 F.3d 652, 658 (9th Cir. 2009). Thus, a "plaintiff must allege a ‘specific connection’ between the challenged site-specific action and the general practice." Id. (quoting Ohio Forestry Ass'n Inc. v. Sierra Club , 523 U.S. 726, 734, 118 S.Ct. 1665, 140 L.Ed.2d 921 (1998) ); see Neighbors of Cuddy Mtn. v. Alexander , 303 F.3d 1059, 1067–68 (9th Cir. 2002) (referencing a "causal connection" between the alleged mismanagement and the action).

Nevertheless, Plaintiffs insist that their reporting challenge is tied specifically to the Castle Mountains Project because the Project will remove 6,559 acres of goshawk post-fledgling habitat and 8,807 acres of goshawk foraging habitat. B2b:0005302; see also B2b:0005313 ("[The Project] would alter goshawk habitat."). There are also "eleven known goshawk territories in the project boundary," B2b:0005292, and the proposed action alternatives are anticipated to affect 20 to 30% of the "existing nesting habitat," see B2b:0005305–06, 5311–12. Thus, while there may be a Forest-wide decline, there is site-specific harm as well. See Weldon , 697 F.3d at 1058 ("We find sufficient site-specific connection here because stand treatment has been shown to affect goshawk nesting territories, and the Project requires significant stand treatment in known goshawk nesting territories."). In Neighbors of Cuddy Mountain , the Ninth Circuit explained that a challenge to "forest monitoring practices alone" is different from an allegation that an agency "fail[ed] to monitor species viability as required by NFMA [and that failure] renders a specific final agency action ... unlawful." 303 F.3d at 1068. Because Plaintiffs’ allegation is more akin to the latter, there is a sufficient nexus between the Project and the agency's alleged failures to proceed on this claim.

B. Goshawk Decline

The EIS states that the Project complies with the Forest Plan monitoring requirements because, in reference to the 10% decrease trigger, "there has been no such decrease in active nesting territories, see Northern Goshawk Monitoring Summary 2016 in project record." B2b:0005313. But, according to Plaintiffs, this is counter to evidence that shows a 47% decline in active nests in 2018 and a 60% decline in active nests in 2017. (See Doc. 14 at 39–40.) Rather than acknowledge this decline, however, Plaintiffs argue that the Forest Service "actively misrepresents its own data and misleads the public in the Project EIS" in stating that "there has been no such decrease in active nesting territories." (Doc. 14 at 41 (quoting B2b:0005313).) In response, the Forest Service concedes there was a decline in 2017 but disputes the decline in 2018. (See Doc. 17 at 35.) Plaintiffs insist even this limited concession warrants remand. They are correct.

There is no real question that the EIS's representation that "there has been no such decrease [a decrease of 10% or more] in active nesting territories," B2b:0005313, is directly contradicted by the reports of declining territories in 2017, see G2_129:0039410. Nor do the agency's justifications in this case temper that misrepresentation. While the Forest Service is correct that the EIS accurately summarizes the final report for 2007 to 2016, see G2_139:0039439–44, that summary is, as Plaintiffs argue, misleading in light of the 2017 data in the record. The Forest Service further argues that there is no harm here because even with declines, the EIS explains that there will continue to be adequate post-fledging and foraging habitat after Project implementation. See B2b:0005303. The Forest Service also states that "[t]he Project EIS likewise explains that the Project does not affect goshawk nesting habitat. AR0005305–06." (Doc. 23 at 28.) But that assertion contradicts the cited material, which explicitly states that all the alternatives would affect a percentage of nesting habitat. See B2b:0005305–06. To be sure, the EIS says that "more than the minimum amount of nesting habitat" will remain following project implementation, B2b:0005305, but that is not the same as the Project having no effect on such habitat. As a result, neither the EIS nor the Forest Service's post hoc rationalizations reflect the reality of declining goshawk nesting territories. Remand is therefore required on these grounds.

Plaintiffs further argue that the Forest Service did not produce a public evaluation report for the 2017 and 2018 goshawk active nesting territory declines, as required by the plain language of the Forest Plan. See A1:0000323 (Item C-8). The Forest Service argues that the 2017 decline can be attributed to natural conditions and weather, meaning neither further evaluation nor the preparation of an evaluation report was necessary. But even so, the Forest Service argues that "the forest plan does not dictate the form that the evaluation must take," (Doc. 23 at 30), and an internal email addressing the 2017 decline is sufficient here. The agency is wrong on both points.

The Forest Service first argues that an evaluation report was not required because the decline can be attributed to natural conditions and weather, citing Native Ecosystems Council v. Weldon . That argument, however, puts the cart before the horse. In Weldon , the Ninth Circuit determined the Forest Service met its "further evaluation" obligation as it relates to goshawk decline where the evaluation itself specifically attributed the decline to weather. See 697 F.3d 1043, 1058–59 (9th Cir. 2012). The important takeaway was that, unlike the situation here, the Forest Service did in fact prepare an evaluation report and that report contained the Forest Service's analysis. See id. Here, the agency claims the cause is natural based on an internal agency email. To be sure, the cited document attributes the decline to a number of natural phenomena, including "dryer weather," "consecutive good [reproductive] years," and "reduced prey base compounded by last year's drought." G2_133:0039418. And, Plaintiffs have recognized the email's author as qualified in this field. See G2_114:0039267. But that email also states that the above causes are "only [a] ‘guess,’ " and the author "can prove none of this" as they are "[j]ust ... educated impressions." G2_133:0039418. The email also recommends further consultation with another goshawk expert. G2_133:0039418. This severely undercuts the agency's second argument, or its attempt to characterize this email as an "evaluation" of the goshawk decline.

Ultimately, while the Forest Service is correct that the Forest Plan dictates neither the form of the report nor the relevant considerations, the record here does not show that the agency complied with either NFMA or NEPA in relation to the undisputed decline in goshawk nesting territory. Remand is therefore required on these grounds as well.

IV. Roadless Rule (Claim Six)

Plaintiffs’ final challenges are based on the Roadless Rule. On January 12, 2001, the Forest Service published the final Roadless Rule, which prohibits road construction and tree cutting in designated "Inventoried Roadless Areas" subject to limited exceptions. See 66 Fed. Reg. 3244 (Jan. 12, 2001). In this case, the western portion of the Project is located within the Castle Mountains Inventoried Roadless Area. B2b:0004747. "Approximately 37 percent (29,498 acres) of the total project area (79,790 acres) is located within the Castle Mountains inventoried Roadless Areas." B2b:0005131. The Project permits tree-cutting in this Area across 2,889 acres as follows: 1,780 acres for "meadow restoration," 845 acres for "whitebark pine restoration," 13 acres for "aspen restoration," and 41 acres of "stand improvement thinning." B2b:0004804; see also B5a:0005803–806. In support of these activities, the Forest Service determined two exceptions to the Roadless Rule's prohibition on the cutting, sale, or removal of timber from roadless areas apply: small diameter timber and cutting incidental to allowed management activities. See 36 C.F.R. § 294.13(b)(1)(ii), (2) (2005). Because the proposed treatments are exempted under § 294.13(b)(1)(ii), the Court does not reach the application of the "incidental" exception under § 294.13(b)(2).

The Project also authorizes 3,320 acres of prescribed burning in the Inventoried Roadless Area. B2b:0004804; see also B5a:0005803–806, 5816. Plaintiffs do not, however, challenge the prescribed burning. (See Doc. 27.)

Tree-cutting is permitted in an Inventoried Roadless Area when "[t]he cutting, sale or removal of generally small diameter timber ... is needed ... [t]o maintain or restore the characteristics of ecosystem composition and structure, such as to reduce the risk of uncharacteristic wildfire effects, within the range of variability that would be expected to occur under natural disturbance regimes of the current climatic period." 36 C.F.R. § 294.13(b)(1)(ii). The Forest Service argues that both the "meadows restoration" and the "whitebark pine restoration" fall within this exception. Plaintiffs disagree, arguing "restoration" efforts are not needed because the existing conditions in both areas are within the estimated natural historic range. For example, as it relates to the "meadow," Plaintiffs argue grasslands/shrublands currently constitute 24.6% of the area, which falls within the natural range of variability of 14.4% to 92.0% in the Castle Mountains. See D1a:0005957; B2b:0004820. Likewise, whitebark pine currently constitutes 3.6% of the area and its natural range of variability is 0.3% and 0.8%. See D1a:0005957; but see B2b:0004820 (indicating current percentage is 0.8%).

While the Forest Service posits "historical average" is a better representation of "historic range of variation," the more persuasive argument is that the exception is met even under Plaintiffs’ definition. While Plaintiffs insist there can be no "need" for tree cutting so long as the current percentages are within the historic range, they themselves argue that the percentages are a range, not a brightline. So long as the cutting or removal of trees "maintain[s] or restore[s] the characteristics of ecosystem composition and structure" and the resulting percentages are still within historic range of variation, the exception can be justified. And it has been here. The stated purpose of the Project

is to move the Castle Mountains toward a more resilient forest and grassland ecosystem that would address the departure in fire regime condition class and reduce the future threat of high intensity wildfire. There is a need to restore the mosaic vegetation size class and fuel structure across the landscape that would be more resilient to disturbance over time. Implementation of treatments would provide additional diversity in size classes and species and reduce conifer encroachment in nature meadow openings.

B2b:0004815. Thus, the Forest Service has shown that tree cutting associated with the Project is necessary here to improve wildfire resiliency consistent with the terms of the Roadless Rule. See 36 C.F.R. § 294.11 (2005) (defining the roadless area characteristics). Accordingly, "meadow restoration" and "whitebark pine restoration" activities are exempted under § 294.13(b)(1)(ii). Summary judgment is therefore granted in favor of the agency on Claim Six.

Plaintiffs do not challenge "aspen restoration" on this ground. (See Doc. 14 at 49.) Thus, the agency may rely on § 294.13(b)(1)(ii) for those treatments as well.

CONCLUSION

Based on the foregoing, IT IS ORDERED that the Forest Service's motion for summary judgment (Doc. 16) is GRANTED as to Claims Two, Three, Four, and Six, as well as the illegal roads portion of Claim One. Plaintiffs’ motion for summary judgment (Doc. 13) is GRANTED as to the remainder of Claim One and the entirety of Claim Five. The matter is REMANDED to the agency for further analysis and the Project is ENJOINED pending the agency's compliance with both NFMA and NEPA as outlined above.


Summaries of

Native Ecosystems Council v. Lannom

United States District Court, D. Montana, Missoula Division.
Apr 4, 2022
598 F. Supp. 3d 957 (D. Mont. 2022)
Case details for

Native Ecosystems Council v. Lannom

Case Details

Full title:NATIVE ECOSYSTEMS COUNCIL, Alliance for the Wild Rockies, Plaintiffs, v…

Court:United States District Court, D. Montana, Missoula Division.

Date published: Apr 4, 2022

Citations

598 F. Supp. 3d 957 (D. Mont. 2022)

Citing Cases

Silverton Mountain Guides LLC v. U.S. Forest Serv.

Docket 80 at 14 (first citing AR 47; and then citing AR 2980). Id. at 14-15 (quoting Native Ecosystems…