Ariz. Admin. Code § 18-4-302

Current through Register Vol. 30, No. 15, Arpil 12, 2024
Section R18-4-302 - Contractor Responsibilities
A. Under the monitoring assistance program, a contractor is authorized to collect, transport, analyze, and report water samples on behalf of a participating public water system. The contractor or a party designated by the contractor shall conduct baseline monitoring for all chemicals for which the system is required to monitor under this Chapter, except for copper, lead, disinfection byproducts, and microbiological contaminants, which remain the responsibility of the public water system. Baseline monitoring includes routine monitoring for contaminants included in the monitoring assistance program. Baseline monitoring does not include increased monitoring required by this Chapter when the results of baseline monitoring indicate the presence of a contaminant at a level that requires increased monitoring by a participating public water system.
B. A contractor shall deliver copies of monitoring analysis results to the public water system and to the Department.

Ariz. Admin. Code § R18-4-302

Adopted effective April 28, 1995 (Supp. 95-2). Amended effective June 3, 1998 (Supp. 98-3). Amended by final rulemaking at 8 A.A.R. 3046, effective May 1, 2002 (Supp. 02-3). Section R18-4-302 repealed; new Section made by final rulemaking at 14 A.A.R. 2978, effective August 30, 2008 (Supp. 08-3).