Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NSPS for Steel Plants: Electric Arc Furnaces and Argon Oxygen Decarburization Vessels (Renewal)

Download PDF
Federal RegisterFeb 26, 2013
78 Fed. Reg. 13052 (Feb. 26, 2013)

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Notice.

SUMMARY:

In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.

DATES:

Additional comments may be submitted on or before March 28, 2013.

ADDRESSES:

Submit your comments, referencing docket ID number EPA-HQ-OECA-2012-0653, to: (1) EPA online, using www.regulations.gov (our preferred method), or by email to: docket.oeca@epa.gov, or by mail to: EPA Docket Center (EPA/DC), Environmental Protection Agency, Enforcement and Compliance Docket and Information Center, mail code 28221T, 1200 Pennsylvania Avenue NW., Washington, DC 20460; and (2) OMB at: Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street NW., Washington, DC 20503.

FOR FURTHER INFORMATION CONTACT:

Learia Williams, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Avenue NW., Washington, DC 20460; telephone number: (202) 564-4113; fax number: (202) 564-0050; email address: williams.learia@epa.gov.

SUPPLEMENTARY INFORMATION:

EPA has submitted the following ICR to OMB for review and approval according to the procedures prescribed in 5 CFR 1320.12. On October 17, 2012 (77 FR 63813), EPA sought comments on this ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. Any additional comments on this ICR should be submitted to both EPA and OMB within 30 days of this notice.

EPA has established a public docket for this ICR under docket ID number EPA-HQ-OECA-2012-0653, which is available for either public viewing online at http://www.regulations.gov , or in person viewing at the Enforcement and Compliance Docket in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Avenue NW, Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566-1744, and the telephone number for the Enforcement and Compliance Docket is (202) 566-1752.

Use EPA's electronic docket and comment system at http://www.regulations.gov to either submit or view public comments, access the index listing of the contents of the docket, and to access those documents in the docket that are available electronically. Once in the system, select “docket search,” then key in the docket ID number identified above. Please note that EPA's policy is that public comments, whether submitted electronically or in paper, will be made available for public viewing at http://www.regulations.gov as EPA receives them and without change, unless the comment contains copyrighted material, Confidentiality of Business Information (CBI), or other information whose public disclosure is restricted by statute. For further information about the electronic docket, go to www.regulations.gov.

Title: NSPS for Steel Plants: Electric Arc Furnaces and Argon Oxygen Decarburization Vessels (Renewal).

ICR Numbers: EPA ICR Number 1060.16, OMB Control Number 2060-0038.

ICR Status: This ICR is scheduled to expire on March 31, 2013. Under OMB regulations, the Agency may continue to either conduct or sponsor the collection of information while this submission is pending at OMB.

Abstract: The affected entities are subject to the General Provisions of the NSPS at 40 CFR part 60, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 60, subparts AA and AAa.

Owners or operators of the affected facilities must submit initial notification report, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually.

Burden Statement: The annual public reporting and recordkeeping burden for this collection of information is estimated to average 308 hours per response. “Burden” means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements which have subsequently changed; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information.

Respondents/Affected Entities: Owners or operator of electric arc furnaces and argon oxygen decarburization vessels.

Estimated Number of Respondents: 98.7.

Frequency of Response: Initially and semiannually.

Estimated Total Annual Hour Burden: 61,310.

Estimated Total Annual Cost: $6,137,827, which includes $5,936,587 in labor costs, $5,490 in capital/startup costs, and $195,750 in operation and maintenance (O&M) costs.

Changes in the Estimates: There is an increase in the total estimated burden as currently identified in the OMB Inventory of Approved Burdens. This increase is not due to any program changes. The increases in burden, including labor hours, labor costs, and O&M costs reflect an increase in the number of respondents. The new number of respondents accounts for the one new source that is subject to the rule since the last ICR period. In addition, this ICR uses updated labor rates to calculate burden costs, which results in an increase in labor costs for both the respondents and the Agency.

John Moses,

Director, Collection Strategies Division.

[FR Doc. 2013-04405 Filed 2-25-13; 8:45 am]

BILLING CODE 6560-50-P