Section 02Q .0301 - APPLICABILITY
(a) Except for the permit exemptions allowed pursuant to 15A NCAC 02Q .0102 and 15A NCAC 02Q .0900 or as allowed pursuant to G.S. 143-215.108A, the owner or operator of a new, modified, or existing facility or source shall not begin construction or operation without first obtaining a construction and operation permit pursuant to 15A NCAC 02Q .0300; however, Title V facilities shall be subject to the Title V procedures pursuant to 15A NCAC 02Q .0500 including the acid rain procedures pursuant to 15A NCAC 02Q .0400 for Title IV sources.
(b) The owner or operator of a source required to have a permit pursuant to this Section shall also be subject to applicable air toxic permit procedures pursuant to 15A NCAC 02Q .0700.
(c) The owner or operator of a source required to have a permit under this Section shall pay permit fees required pursuant to 15A NCAC 02Q .0200.

15A N.C. Admin. Code 02Q .0301

Authority G.S. 143-215.3(a)(1); 143-215.108;
Temporary Adoption Eff. March 8, 1994 for a period of 180 days or until the permanent rule becomes effective, whichever is sooner;
Eff. July 1, 1994;
Amended Eff. December 1, 2005; July 1, 1998;
Readopted Eff. April 1, 2018.
Authority G.S. 143-215.3(a)(1); 143-215.108;
Temporary Adoption Eff. 3/8/1994 for a period of 180 days or until the permanent rule becomes effective, whichever is sooner;
Eff. 7/1/1994;
Amended Eff. 12/1/2005; July 1, 1998.
Readopted by North Carolina Register Volume 32, Issue 21, May 1, 2018 effective 4/1/2018.