Saint Luke's Hosp. of Kan. City v. Benefit Mgmt. Consultants, Inc.

MISSOURI COURT OF APPEALS WESTERN DISTRICT
Apr 13, 2021
626 S.W.3d 731 (Mo. Ct. App. 2021)

Opinion

WD 83388 ( C/w WD 83418, WD 83420, WD 83425)

04-13-2021

SAINT LUKE'S HOSPITAL OF KANSAS CITY, Appellant-Respondent, v. BENEFIT MANAGEMENT CONSULTANTS, INC., Carthage R-9 School District, and Gerber Life Insurance Company, Respondents-Appellants.

Gregory J. Minana, JoAnn T. Sandifer, and Mohsen Pasha, St. Louis, MO, Attorneys for Appellant-Respondent Saint Luke's Hospital of Kansas City. Casey O. Housley and Christopher R. Staley, Overland Park, KS, Attorneys for Respondent-Appellant Benefit Management Consultants, Inc. J. Drew Marriott and Ryan VanFleet, Independence, MO, Attorneys for Respondent-Appellant Carthage R-9 School District. Thomas F. A. Hetherington and Jennifer H. Frank, Houston, TX, and Jeffery T. McPherson, Karrie J. Clinkinbeard, and Kevin W. Prewitt, Kansas City, MO, Attorneys for Respondent-Appellant Gerber Life Insurance Company.


Gregory J. Minana, JoAnn T. Sandifer, and Mohsen Pasha, St. Louis, MO, Attorneys for Appellant-Respondent Saint Luke's Hospital of Kansas City.

Casey O. Housley and Christopher R. Staley, Overland Park, KS, Attorneys for Respondent-Appellant Benefit Management Consultants, Inc.

J. Drew Marriott and Ryan VanFleet, Independence, MO, Attorneys for Respondent-Appellant Carthage R-9 School District.

Thomas F. A. Hetherington and Jennifer H. Frank, Houston, TX, and Jeffery T. McPherson, Karrie J. Clinkinbeard, and Kevin W. Prewitt, Kansas City, MO, Attorneys for Respondent-Appellant Gerber Life Insurance Company.

Before Division Four: Cynthia L. Martin, Chief Judge, and Thomas H. Newton and Mark D. Pfeiffer, Judges

Mark D. Pfeiffer, Judge

Saint Luke's Hospital of Kansas City ("St. Luke's") appeals from the judgments/orders of the Circuit Court of Jackson County, Missouri ("trial court"), granting the motions for summary judgment filed by Benefit Management Consultants, Inc. ("BMI"), Gerber Life Insurance Company ("Gerber"), and Carthage R-9 School District ("Carthage") (collectively, "Defendants"), and the motion for judgment on the pleadings filed by BMI in St. Luke's action for breach of contract, promissory estoppel, unjust enrichment, and violation of Missouri's Prompt Payment Act. BMI, Gerber, and Carthage cross-appeal. This Court ordered the appeals consolidated. We affirm in part, reverse in part, and remand for further proceedings consistent with this opinion.

Factual and Procedural Background

The facts, and the reasonable inferences that can be drawn therefrom, are set forth in the light most favorable to St. Luke's, as the party against whom summary judgment was entered. See ITT Commercial Fin. Corp. v. Mid.-Am. Marine Supply Corp. , 854 S.W.2d 371, 376 (Mo. banc 1993).

John Doe worked for Carthage and was covered under Carthage's self-funded Carthage R-9 School District Employee Health Care Plan ("Carthage Plan" or "Plan"). He suffered from heart failure and was initially treated in Joplin, Missouri. When Doe's condition progressed, his healthcare providers recommended that Doe be transferred to St. Luke's in Kansas City for further evaluation and treatment. Doe's transfer out of the area was approved based on his doctor's recommendation because his condition and treatment were highly specialized and required a higher level of care than was available in southwest Missouri.

A pseudonym is used in this opinion to protect the individual's anonymity and his and his family's privacy.

The Carthage Plan specified to its members that it utilized a "Preferred Provider Network":

In an effort to better control costs and promote quality service, the Plan is participating in a discount program. Employees and their dependents are given the opportunity to utilize physicians and hospitals who have contracted with the Plan, also called in-network providers. The Plan member may choose to use an in-network provider or an out-of-network provider. However, if the Plan member utilizes an in-network provider, the Plan will pay at a higher benefit percentage than if the member were to see an out-of-network provider. A directory of hospitals and physicians in your area who have agreed to handle billing and collections for the patient will be made available to the Plan member through the Plan Administrator's Benefits’ Office or can be obtained from the Plan Supervisor. The Plan member's personal identification card will notify the provider of membership in the program.

The Plan would pay 80% or more of most in-network services and 40% for most out-of-network services. The Plan defined a "network provider" for its members as:

any provider having a contractual relationship with the plan at the time treatment, care, services or supplies are provided. This will include any provider that negotiates with Benefit Management, Inc. before or after services are rendered. BMI negotiations will always be paid at the PPO level of benefits. A network provider may also include any provider who is contracted with one of BMI's national wrap-around PPO's if allowed by the plan as stated on page 1.

BMI began acting as the third-party administrator for the Carthage Plan on or about July 1, 1999. BMI's services on behalf of the Plan were governed by an Administrative Services Agreement ("ASA"). The ASA between Carthage and BMI authorized BMI to perform certain administrative functions on behalf of the Carthage Plan, including "[c]laim verification and payment," preparation of "ID cards," and "[g]uidance in Plan arrangement." The ASA instructed BMI to "pay all claims which it has determined to properly qualify under the terms of The Plan without additional consent from [Carthage]." As third-party administrator of the Carthage Plan, BMI received, processed, and paid claims on behalf of the Plan.

The ASA also granted BMI "the authority to negotiate discounts ... itself or through a designated agent." On or about June 1, 2012, BMI entered into a Client Services Agreement ("CSA") with MultiPlan, Inc. ("MultiPlan"). A "national wrap-around PPO" is a group of providers who contract with an entity to provide services at a discounted price. MultiPlan maintained a network of healthcare providers for its clients and entered into contracts with healthcare providers who agreed to provide "certain healthcare services at certain negotiated rates." St. Luke's was a provider within the MultiPlan Provider Network. Doe's insurance card was branded with a MultiPlan logo and instructed healthcare providers to submit claims to BMI for processing and payment.

Carthage contracted with Gerber for an Excess Loss Insurance Policy, also called a stop-loss policy, in order to mitigate the financial risks associated with maintaining a self-insured health plan. Gerber agreed to reimburse Carthage for large medical expense losses incurred by Carthage members under the Carthage Plan, subject to the terms and conditions of the stop-loss policy.

"Stop-loss coverage is defined as indemnity coverage issued to an employer maintaining a self-funded health plan to reimburse the employer for large medical expense losses incurred by the employees protected by the plan." Fidelity Sec. Life Ins. Co. v. Dir. of Revenue , 32 S.W.3d 527, 530 (Mo. banc 2000) (internal quotation marks omitted). "By definition, stop-loss coverage is a form of health insurance. Employers are directly reimbursed under stop-loss policies for employee healthcare expenses above the expected amount of claims." Id. "Stop-loss coverage prevents employees from bearing the burden of large healthcare claims that could plunge an employer, especially a small employer, into financial devastation." Id. "Employers who self-fund healthcare insurance use this coverage not only to protect themselves but also to protect the jobs and healthcare benefits due their employees in the event of a catastrophic loss." Id.

Doe presented at St. Luke's with a health insurance card that identified his Group Medical Plan as the Carthage Plan and his third-party administrator as BMI, and directed St. Luke's to submit claims for services rendered to Doe to BMI. St. Luke's was aware that Doe's ID card indicated that BMI was accessing the MultiPlan network as a wrap-around network. On each of the dates of treatment, Doe executed a form titled "St. Luke's Health System Consent and Agreement of Health Care Services," which contained a section titled "ASSIGNMENT OF BENEFITS."

St. Luke's provided healthcare services to Doe over the course of fifteen separate admissions from June 3, 2014, through January 6, 2015. At the time of Doe's treatment, St. Luke's utilized the clearinghouse RelayHealth to transmit claims to payors. A clearinghouse is a third-party intermediary that contracts with both providers and payors to facilitate the transmission of claims for payment from healthcare providers to healthcare payors. All of St. Luke's claims were submitted to RelayHealth in the standardized 837 electronic format. Per BMI's instructions, RelayHealth converted the electronic claims submitted by St. Luke's in the 837 format to paper UB-04 claims before transmission to BMI. Separate and apart from the transmission through RelayHealth, St. Luke's also submitted its claims directly to BMI by facsimile.

The UB-04 is the Uniform Bill approved by the National Uniform Billing Committee, to translate 837 data to paper.

Consistent with BMI's affirmative assurances to Doe and St. Luke's that St. Luke's qualified as an "in-network" provider, BMI paid St. Luke's at the in-network benefit level under the Carthage Plan for healthcare services rendered to Doe during his first three admissions. The first three admissions covered dates of services from June 3, 2014, to July 2, 2014, and the claim payment checks were drawn on Carthage's bank account and signed by BMI. Those first three admissions are not at issue in this appeal, but Doe's remaining twelve admissions are. Upon each admission, BMI affirmatively advised St. Luke's that St. Luke's was an in-network provider under the Carthage Plan and would be reimbursed at the MultiPlan contract rates.

After the last hospital admission, Doe passed away on February 9, 2015.

After the third admission, Doe's medical bills reached the Plan's deductible, so the explanation of benefits for Doe's fourth admission advised that the claim was covered 100% by the Plan, but the payment "[w]ould be held for stop-loss reimbursement." Once Carthage reached its deductible under the Gerber Excess Loss Insurance Policy, BMI continued to process the claims and then submitted the excess claims to Gerber for further processing and claim payment funding. Upon receipt of St. Luke's claims for payment, Gerber unilaterally determined that St. Luke's was an out-of-network provider under the Plan.

Because it did not receive payment as an in-network provider, St. Luke's sued BMI on March 4, 2016, alleging breach of contract, promissory estoppel, unjust enrichment, and violation of Missouri's Prompt Payment Act ("MPPA"). BMI then filed a third-party petition against Carthage, alleging breach of contract and common law and contractual indemnification. Carthage filed a third-party petition against Gerber, alleging breach of contract, indemnity, and vexatious refusal to pay claims. St. Luke's was granted leave to file a first amended petition, which added counts for breach of contract, promissory estoppel, and unjust enrichment against Carthage; and counts of prima facie tort, fraudulent misrepresentation, and violation of the MPPA against BMI, Carthage, and Gerber. Gerber filed a cross-petition against Carthage, alleging a claim for indemnity. Gerber then filed an amended cross-petition, adding BMI and adding a claim for contribution and/or equitable indemnity. Carthage filed a cross-claim against BMI, alleging counts for errors and omissions in breach of contract, breach of duty of good faith and fair dealing, and indemnity and defense. Carthage also filed a cross-claim against Gerber, alleging counts for indemnity and defense, and vexatious refusal to pay claims. Carthage also filed a counterclaim against Gerber, alleging counts for breach of contract, breach of good faith and fair dealing, indemnity and defense, and vexatious refusal to pay claims. BMI also filed a counterclaim against Gerber, alleging one count of contribution and/or equitable indemnity.

BMI and Carthage originally alleged in their pleadings before the trial court that St. Luke's was in-network under the Plan . However, after BMI and Carthage entered into an agreement with Gerber on or about May 2017, BMI and Carthage abruptly changed their position as to the in-network provider status of St. Luke's and joined Gerber in jointly stipulating to the dismissal, without prejudice, of all claims, third-party claims, cross-claims, and counterclaims Defendants had asserted against one another. In light of that joint dismissal, St. Luke's requested production of all agreements between BMI, Carthage, and Gerber related to the litigation. The trial court granted St. Luke's motion to compel documents responsive to St. Luke's request, resulting in the production of a document titled "Tolling Agreement," which stated that it was entered into "for purposes of tolling any statute(s) of limitations and reserving rights as to the [third-party] Claims as well ... as any other claims between the parties relating to [Doe] and the Services he received." In the Tolling Agreement, BMI, Carthage, and Gerber waived their right to argue any statute of limitations, laches, estoppel, "or any other legal or equitable claim or defense, or any evidentiary or procedural rule or presumption, based on the lapse of time" should there be any subsequent litigation between Defendants as to the Doe claims. In exchange for this tolling agreement, Defendants agreed to jointly dismiss all of their claims against each other in the current litigation involving the Doe claims.

The case was originally set for trial on October 16, 2017. Shortly before trial, multiple motions for summary judgment filed by Defendants were granted in part and denied in part. The trial setting was cancelled, and on October 27, 2017, St. Luke's filed a motion for leave to file a second amended petition, which was granted by the trial court on December 12, 2017. St. Luke's asserted multiple claims against BMI, Carthage, and Gerber, four of which are at issue in this appeal:

All other claims asserted by St. Luke's against the Defendants were summarily disposed of by the trial court's grant of summary judgment and have been abandoned on appeal.

• Breach of the CSA MultiPlan network contract vs. BMI. St. Luke's alleged that it was a third-party beneficiary to BMI's CSA with MultiPlan and that BMI breached its obligation under the CSA to pay or arrange for Carthage to make payment to St. Luke's at the MultiPlan contract rates.

• Promissory Estoppel vs. BMI. St. Luke's asserted that BMI promised St. Luke's that St. Luke's would be paid for the healthcare services provided to Doe at the MultiPlan network rates and at the in-network benefit level of the Plan and that St. Luke's detrimentally relied on that promise when it provided and continued to provide healthcare services to Doe.

• Breach of the Carthage Plan's MultiPlan network terms vs. Carthage. St. Luke's asserted that it fully performed its contractual obligations under the MultiPlan network agreement (the terms of which BMI bound Carthage to pursuant to its ASA with Carthage and the corresponding terms of the Plan) when it provided healthcare services to Carthage member Doe at the negotiated MultiPlan network rates and that Carthage breached the Plan by not paying St. Luke's at the in-network provider MultiPlan contract rates.

• Violation of the MPPA vs. BMI, Carthage, and Gerber. St. Luke's asserted that BMI, Gerber and Carthage were all "health carriers" under the MPPA and that they failed to timely pay St. Luke's for the services provided to Doe following St. Luke's submission of the claims to Defendants, subjecting them to the MPPA's penalty provisions.

Thereafter, the parties engaged in additional discovery, and Defendants filed the motions for summary judgment that are at issue in this appeal.

In December 2018, Defendants jointly moved for leave to amend their responsive pleadings to include affirmative defenses and counterclaims. The trial court's denial of Defendants’ motion for leave to amend is a subject of Defendants’ cross-appeals.

On August 23, 2019, the trial court granted summary judgment to Gerber on St. Luke's MPPA claim, ruling: "St. Luke's submission of claims by facsimile transmission is insufficient to bring the claim against Gerber within the purview of the MPPA." On September 18, 2019, the trial court granted summary judgment to BMI, applying the same rationale. The trial court also ruled that St. Luke's lacked standing to sue for breach of the Plan and for breach of the CSA, and even if it had standing, St. Luke's was not an in-network provider under the Plan or the CSA. On October 18, 2019, the trial court concluded that Carthage also was not subject to the MPPA, for the reasons set forth in the September 18, 2019 summary judgment order.

At that point, St. Luke's sole remaining claim was for promissory estoppel against BMI. On October 21, 2019, BMI moved for judgment on the pleadings and, on October 25, 2019, the trial court granted BMI's motion.

St. Luke's had also asserted a claim for promissory estoppel against Carthage, as to which the trial court granted summary judgment in favor of Carthage on the argued basis that Carthage, a public entity, could not be subject to claims based on implied contracts pursuant to section 432.070. St. Luke's has not appealed that ruling. BMI's motion for judgment on the pleadings argued that the trial court's dismissal of the promissory estoppel claim against Carthage should be extended to BMI as BMI had at all times been acting as Carthage's agent.

St. Luke's timely appealed. And, BMI, Gerber, and Carthage timely cross-appealed.

A judgment is a "final judgment" if it " ‘resolves all claims by and against all parties, or it resolves the last such claim and some (but not all) claims have been resolved previously.’ " Wilson v. City of St. Louis , 600 S.W.3d 763, 768 (Mo. banc 2020) (quoting State ex rel. Henderson v. Asel , 566 S.W.3d 596, 598 (Mo. banc 2019) ). Thus:

[W]hen a judgment is entered in the case disposing of the last claim, that becomes the "final judgment" for purposes of appeal and it necessarily incorporates all prior orders or judgments that adjudicated some—but fewer than all—of the claims and the rights and liabilities of all the parties. This is so regardless of whether such incorporation is addressed explicitly (or implicitly) in the final judgment itself.

Henderson , 566 S.W.3d at 598 n.2 (citation omitted) (internal quotation marks omitted). On October 25, 2019, the trial court granted BMI's motion for judgment on the pleadings. That judgment/order disposed of the last claim against the last party in this case. Carthage filed a motion to amend on November 6, 2019, which the trial court denied by docket entry on December 19, 2019. The judgment became final on the date the motion to amend was denied; therefore, the notice of appeal was due December 30, 2019. St. Luke's filed its notice of appeal on December 2, 2019. "A premature notice of appeal shall be considered as filed immediately after the time the judgment becomes final for the purposes of appeal." Chastain v. Geary , 539 S.W.3d 841, 847 n.8 (Mo. App. W.D. 2017) (citing Rule 81.05(b)) (internal quotation marks omitted). St. Luke's appealed from a final judgment, and its notice of appeal was timely; therefore, we have authority to hear this appeal.

Summary of Points on Appeal

St. Luke's asserts six points on appeal. Points I through V claim that the trial court erred in granting summary judgment against it. In Points I and II, St. Luke's argues that the trial court erroneously concluded that St. Luke's lacked standing to assert its breach of contract claim against Carthage as an in-network provider for payment pursuant to the terms of the Plan. In Point III, St. Luke's asserts that, on its claim against Defendants for violation of the MPPA, the trial court erroneously concluded that the MPPA was not applicable because St. Luke's did not submit the Doe claims in an electronic format as required by the statute. In Points IV and V, St. Luke's argues that, on its claim against BMI for breach of BMI's CSA with MultiPlan, the trial court erroneously concluded that St. Luke's lacked standing because St. Luke's was not a third-party beneficiary of BMI's CSA with MultiPlan and was not an in-network provider under the CSA. Finally, in Point VI, St. Luke's asserts that the trial court erred in granting judgment on the pleadings against it on its promissory estoppel claim against BMI.

BMI and Carthage each assert two points on cross-appeal, and Gerber asserts one point. In BMI's first point, Gerber's first point, and Carthage's second point, they contend that the trial court erred in denying their request for attorney fees under the MPPA. In BMI's second point and Carthage's first point, they argue that the trial court erred in denying their joint motion for leave to file an amended answer and counterclaim.

Analysis

Standard of Review (Points I-V)

We review a grant of summary judgment de novo. ITT Commercial Fin. Corp. v. Mid-Am. Marine Supply Corp. , 854 S.W.2d 371, 376 (Mo. banc 1993). Summary judgment is appropriate "where the moving party has demonstrated, on the basis of facts as to which there is no genuine dispute, a right to judgment as a matter of law." Id. (citing Rule 74.04).

Point I

In St. Luke's first point, it asserts that the trial court erred in granting summary judgment against it on its claim against Carthage for breach of the Plan on the ground that St. Luke's lacked standing to assert its claim for in-network payment against the Defendants. St. Luke's claims that it was the real party in interest entitled to enforce the Plan benefits claim in that, under the assignments of benefits executed before treatment, Doe assigned his entire "interest and right" in his Plan benefits to St. Luke's. We agree.

"A party has standing to sue when it has an interest in the subject matter of the suit that gives it a right to recovery, if validated." Cygnus SBL Loans, LLC v. Hejna , 584 S.W.3d 324, 335 (Mo. App. W.D. 2019) (internal quotation marks omitted). "[T]he doctrine of standing ... requires that a party seeking relief have a legally cognizable interest in the subject matter of [its] suit and a threatened or actual injury." Cohen v. Normand Prop. Assocs., L.P. , 498 S.W.3d 473, 478 n.4 (Mo. App. W.D. 2016) (internal quotation marks omitted). " ‘Standing to sue evaluates the sufficiency of a plaintiff's interest in the subject of the lawsuit. It is a concept used to ascertain if a party is sufficiently affected by the conduct complained of in the suit, so as to [e]nsure that a justiciable controversy is before the court.’ " Id. (quoting City of Wellston v. SBC Commc'ns, Inc. , 203 S.W.3d 189, 193 (Mo. banc 2006) ).

"Though the concepts of real party in interest and standing are closely related, they are not strictly synonymous." Cohen v. Normand Prop. Assocs., L.P. , 498 S.W.3d 473, 478 n.4 (Mo. App. W.D. 2016). "Real parties in interest are persons who are directly interested in a lawsuit's subject matter and are entitled to maintain the action." Id. at 478 (internal quotation marks omitted). "Capacity to sue refers to the status of a person or group as an entity that can sue or be sued, and is not dependent on the character of the specific claim alleged in the lawsuit." Id. at 478 n.4 (internal quotation marks omitted).

Each time Doe was admitted, St. Luke's obtained from him a Consent and Agreement of Health Care Services, which document contained a paragraph titled "ASSIGNMENT OF BENEFITS" that stated in pertinent part:

I hereby assign to Saint Luke's Health System's entities and any or all physicians; all of my interest and right to the insurance benefits otherwise payable to me for this hospitalization or outpatient services arising out of any policy of insurance, self-insured health plan, Medicare or Medicaid in my name or on my behalf.

"An assignment passes all the assignor's title or interest in the subject matter to the assignee and divests the assignor of all right of control over the subject matter." Marvin v. State Farm Mut. Auto. Ins. Co. , 894 S.W.2d 712, 713 (Mo. App. W.D. 1995). In Marvin , when an insured's children were injured in an accident, the insured assigned her rights to receive medical benefits from State Farm Mutual Automobile Insurance Company to Midtown Chiropractic Clinic in consideration for her children's treatment by a chiropractic practitioner. State Farm, however, paid the benefits to its insured, and the insured did not pay Midtown Clinic. Midtown Clinic sued State Farm for the benefits, and the trial court ruled in State Farm's favor. Id. at 712. This Court found that when the insured assigned to Midtown Clinic her rights to State Farm's insurance payments, Midtown Clinic gained all of the insured's rights as beneficiary of the insurance policy's proceeds. Id. at 713. The insured no longer had title or an interest to the insurance proceeds; Midtown Clinic became the insured for the purposes of receiving the medical benefits. Id. We explained that:

State Farm had an obligation to pay the insured or a person authorized by law to receive such payment. Midtown Clinic qualified under either option. Because of the assignment, it became an entity authorized by law to receive payment. Also, because of the assignment, it gained the rights of the insured. State Farm was required by its policy and by the assignment to pay Midtown Clinic.

Id.

Here, when Doe assigned to St. Luke's "all of [his] interest and right to the insurance benefits otherwise payable to [him] for this hospitalization ... arising out of any ... self-insured health plan ... in [his] name or on [his] behalf," St. Luke's became the insured for the purposes of receiving the insurance benefits and gained the right to sue Carthage for those benefits when they were denied.

Point I is granted.

Point II

In Point II, St. Luke's asserts that the trial court erred in granting summary judgment against it on the merits of its breach of contract claims against Carthage as to the Plan on the grounds that St. Luke's was out-of-network. All of the parties to this appeal agree that the Plan is an unambiguous insurance policy "and interpretation of the contract is for the court to determine" as a matter of law. See In re Marriage of Lueken , 267 S.W.3d 800, 803 (Mo. App. E.D. 2008) (citing to Enyeart v. Shelter Mut. Ins. Co. , 693 S.W.2d 120, 123 (Mo. App. W.D. 1985) ). In other words, all of the parties to this appeal have requested that we declare as a matter of law whether St. Luke's qualifies as an "in-network" or "out-of-network" provider under the plain and unambiguous terms of the Plan.

Specifically, the trial court concluded that St. Luke's was not in-network because "Page 1 of the Carthage Plan does not list MultiPlan as a ‘Network provider’ or include any national wrap-around PPO."

The "interpretation of an insurance policy is a question of law that this Court also determines de novo. " Owners Ins. Co. v. Craig , 514 S.W.3d 614, 616 (Mo. banc 2017) (quoting Seeck v. Geico Gen. Ins. Co. , 212 S.W.3d 129, 132 (Mo. banc 2007) ). "When interpreting an insurance policy, this Court gives the policy language its plain meaning, or the meaning that would be attached by an ordinary purchaser of insurance." Doe Run Res. Corp. v. Am. Guar. & Liab. Ins. , 531 S.W.3d 508, 511 (Mo. banc 2017).... A

policy must be enforced as written when its language is clear and unambiguous.

Seaton v. Shelter Mut. Ins. Co. , 574 S.W.3d 245, 247 (Mo. banc 2019).

Specifically, St. Luke's argues in this appeal that the Plan and Doe's incorporated identification card unambiguously designated MultiPlan medical providers, like St. Luke's, as in-network providers. We agree.

MultiPlan offered "various healthcare cost management services including but not limited to creating and maintaining networks of health care providers" by entering into agreements with network providers that agreed to accept agreed-upon reimbursement rates as payment for healthcare services rendered to covered individuals. BMI contracted to purchase "the network services and/or other managed care related services" from MultiPlan, as BMI was authorized by Carthage to do. The MultiPlan agreement defined a network as "[a]n arrangement of Network Providers, created and/or maintained by [MultiPlan] or any of its subsidiaries, who have agreed to certain Contract Rates for Covered Services provided to Participants." A network provider entered into an agreement with MultiPlan for participation in the network. St. Luke's was a provider that contracted with MultiPlan.

The Carthage Plan defined a network provider as:

any provider having a contractual relationship with the [P]lan at the time treatment, care, services or supplies are provided. This will include any provider that negotiates with Benefit Management, Inc. before or after services are rendered. BMI negotiations will always be paid at the PPO level of benefits. A network provider may also include any provider who is contracted with one of BMI's national wrap-around PPO's if allowed by the [P]lan as stated on page 1.

(Emphasis added.) Page 1 of the Carthage Plan explained the medical plan concept of a preferred provider network:

In an effort to better control costs and promote quality service, the Plan is participating in a discount program. Employees and their dependents are given the opportunity to utilize physicians and hospitals who have contracted with the Plan, also called in-network providers .... [I]f the Plan member utilizes an in-network provider, the Plan will pay at a higher benefit percentage than if the member were to see an out-of-network provider.... The Plan member's personal identification card will notify the provider of membership in the program.

(Emphasis added.)

" ‘The cardinal principle of contract interpretation is to ascertain the intention of the parties and to give effect to that intent.’ " Health Care Found. of Greater Kansas City v. HM Acquisition, LLC , 507 S.W.3d 646, 656 (Mo. App. W.D. 2017) (quoting Dunn Indus. Grp., Inc. v. City of Sugar Creek , 112 S.W.3d 421, 428 (Mo. banc 2003) ). The terms of a contract are read as a whole to determine the intention of the parties, and the terms are given their plain, ordinary, and usual meaning. Id. "The plain and ordinary meaning of a word is found in the dictionary." Barrett v. Greitens , 542 S.W.3d 370, 381 (Mo. App. W.D. 2017). "Additionally, each term of a contract is construed to avoid rendering other terms meaningless. A construction that attributes a reasonable meaning to all the provisions of the agreement is preferred to one that leaves some of the provisions without function or sense." Health Care Found. , 507 S.W.3d at 656 (citation omitted) (internal quotation marks omitted).

The trial court's interpretation—that St. Luke's was not in-network because page 1 of the Carthage Plan did not specifically list MultiPlan as a network provider or include any national wrap-around PPO—would render meaningless the Plan's provisions that "[a] network provider may also include any provider who is contracted with one of BMI's national wrap-around PPO's if allowed by the [P]lan as stated on page 1," which states that "[t]he Plan member's personal identification card will notify the provider of membership in the [preferred provider network discount] program." The MultiPlan logo appeared on Doe's insurance identification card , which he presented to St. Luke's.

Missouri courts recognize that "[w]here a writing refers to another document, that other document, or the portion to which reference is made, becomes constructively a part of the writing, and in that respect the two form a single instrument." Intertel, Inc. v. Sedgwick Claims Mgmt. Servs., Inc. , 204 S.W.3d 183, 196 (Mo. App. E.D. 2006). To incorporate a document into a contract by reference, the contract must "make[ ] clear reference to the document and describe[ ] it in such terms that its identity may be ascertained beyond doubt." Id. "The incorporated matter is to be interpreted as part of the writing." Id. Doe's insurance card meets those requirements; thus, we consider Doe's insurance card incorporated by reference into the Plan.

Though unnecessary to our interpretation of the Plan, we find it no coincidence that—prior to the Defendants entering into the Tolling Agreement and voluntarily dismissing without prejudice all of their claims against one another— representatives of both BMI and Carthage agreed that the plain meaning of the unambiguous terms of the Plan was that St. Luke's clearly and unequivocally qualified as an "in-network" provider. For example, in response to any suggestion that page 1 must name MultiPlan for St. Luke's to be in-network, BMI's President, Mr. David A. Powell, explained:

The Discount program listed on page 1 of the [Plan] is under the heading, Preferred Provider Network. The discount program includes MultiPlan providers in the network. That section mentions the member's identification card[,] which bears Tristate Coalition, Multiplan and Coalition America program logos. Those identifying logos show who is included in the Plan's Preferred Provider Network but that is not an exclusive list. That Medical Plan Concept is explained in layman's terms so Plan members can understand. I don't see why you can not [sic] make the connection.

BMI has administered the benefits for this Plan for 16 years and my signature appears on every check issued. So I think I understand better than anyone how the Plan works....

Similarly, when Carthage demanded assistance from the Missouri Division of Insurance with the payment of Doe's insurance claim for in-network benefits to St. Luke's that it argued were wrongfully denied by Gerber, Carthage Assistant Superintendent of Business, Dr. Mark Baker, explained (1) why St. Luke's was in-network under the Plan and (2) that Gerber had previously reimbursed MultiPlan providers as in-network:

BMI processed the claims in question strictly according to our Plan Document and our Administrative Service Agreement with them. Mr. [Doe] received the majority of his healthcare from St. Luke's Hospital and their staff physicians in Kansas City, Missouri. These providers have contracted with Multiplan and consequently are to be paid at the in-network benefit level by our Plan .

To receive in-network benefits from our plan, members must utilize contracted PPO providers. St. Luke's and their physicians are contracted with BMI's national wrap-around PPO, Multiplan. Multiplan is identified with

their logo on our members’ ID cards.... These Plan provisions are explained on page 1 and 24 in our Plan Document. Use of wraparound PPO networks to gain discounts and provide in-network benefits is a standard industry practice. Health plans and excess loss carriers routinely reimburse those claims as such. Gerber Life Insurance Company and RMTS[ ] refused to reimburse our excess claims according to our contract with them, citing that Mr. [Doe's] claims should have been paid as out-of-network providers.... There was never a claim denied as being out-of-network in the first four and a half years we bought coverage from Gerber-RMTS. In fact, Gerber-RMTS reimbursed a 2013 Multiplan claim to us at the 100% in-network benefit.

The Gerber policy purchased by Carthage was administered by a managing general underwriter, RMTS.

(Emphasis added.) Carthage's designated corporate representative, Dr. Baker, also testified as to the reason why BMI and Carthage considered St. Luke's an in-network provider :

Q. What is the purpose of including the MultiPlan logo on the insurance card?

....

A. Our purpose to have it included is just to show there are opportunities outside our area to be included for a network.

Q. And so does the logo communicate to Carthage members that MultiPlan providers are considered in-network under the Carthage plan?

A. That is our intent, yes.

Q. And does it similarly communicate to healthcare providers that are within the MultiPlan network that MultiPlan is considered in-network under the Carthage plan?

....

A. I assume it does.

These unequivocal admissions by both Carthage's corporate representative and Carthage's Plan Administrator are consistent with this Court's interpretation of the Plan and our corresponding conclusion that, as a matter of law, St. Luke's qualified as an in-network provider under the Plan.

Though St. Luke's did not file its own motion for summary judgment below and, hence, we are not permitted in this appeal to enter partial summary judgment in favor of St. Luke's on its status as an in-network provider, see Betts-Lucas v. Hanson , 31 S.W.3d 484, 486 (Mo. App. W.D. 2000), in order to resolve this appeal this Court was tasked with the responsibility of interpreting the plain and unambiguous terms of the insurance contract, and we have done so. As our ruling reflects, as a matter of law, St. Luke's qualifies as an in-network provider pursuant to the unambiguous terms of the Plan. Upon remand, the trial court shall be guided by our interpretation as such in all further proceedings below.

Based upon the Plan's unambiguous terms, the Plan can "allow" any provider who contracts with one of BMI's national wrap-around PPO's, like MultiPlan, to be an in-network provider, and "[t]he Plan member's personal identification card will notify the provider of membership in the program" by placing logos on the identification card. St. Luke's contracted with BMI's national wrap-around PPO, MultiPlan; MultiPlan was identified with its logo on Doe's personal identification card; therefore, St. Luke's was to be treated as an in-network provider under the Plan and is entitled to pursue its breach of contract claim against Carthage for violation of the terms of the Plan. The trial court's summary judgment ruling to the contrary is reversed.

Point II is granted. Point III

In St. Luke's third point, it asserts that the trial court erred in concluding that the MPPA was not applicable because St. Luke's did not submit the Doe claims in an electronic format as required by the statute. Specifically, St. Luke's argues that it complied with the MPPA because: (1) section 376.384.2 did not require it to submit its claims in an electronic format when BMI did not provide readily accessible electronic filing and insisted on and processed paper or fax submission of the Doe claims; (2) St. Luke's submitted the Doe claims in an electronic format to its clearinghouse; and (3) the MPPA does not require that health carriers "receive" claims in an electronic format.

Section 376.384.2 of the MPPA prescribes the method a healthcare provider must use to submit claims for reimbursement:

On or after January 1, 2003, all claims for reimbursement for a health care service provided in this shall be submitted in an electronic format consistent with federal administrative simplification standards adopted pursuant to the Health Insurance Portability and Accountability Act of 1996. Any claim submitted by a health care provider after January 1, 2003, in a nonelectronic format shall not be subject to the [penalty and interest] provisions of section 376.383. Any health carrier shall provide readily accessible electronic filing after this date to health care providers.

(Emphasis added.) "The primary rule of statutory interpretation is to effectuate legislative intent through reference to the plain and ordinary meaning of the statutory language." Moore v. Bi-State Dev. Agency , 609 S.W.3d 693, 696 (Mo. banc 2020) (internal quotation marks omitted). "When the words are clear, there is nothing to construe beyond applying the plain meaning of the law." Id. (internal quotation marks omitted). We apply rules of statutory construction only to resolve an ambiguity when we cannot determine the legislative intent from the plain statutory language. Id.

The plain language of section 376.384.2 provides that "all claims for reimbursement for a health care service provided in this [sic] shall be submitted in an electronic format." (Emphasis added.) "Generally[,] the word ‘shall’ connotes a mandatory duty." State ex rel. Universal Credit Acceptance, Inc. v. Reno , 601 S.W.3d 546, 548 (Mo. banc 2020) (internal quotation marks omitted). The statute also provides a consequence for failing to follow its terms: "[a]ny claim submitted by a health care provider ... in a nonelectronic format shall not be subject to the [penalty and interest] provisions of section 376.383." "When a statute or rule provides the consequence of failing to follow its terms, it is mandatory and must be obeyed." Id. (internal quotation marks omitted).

St. Luke's attempts to avoid the consequences of its failure to submit its claims in electronic format. It claims that the health carrier's provision of a readily accessible electronic filing is a precondition to the MPPA's electronic-format-submission requirement. That BMI requested mail and/or fax submission does not absolve St. Luke's from compliance with the statute. There is nothing in the summary judgment record to indicate that St. Luke's requested and BMI refused to provide readily accessible electronic filing in compliance with section 376.384.2. Furthermore, in the summary judgment record, St. Luke's contended that its claims were sent electronically to BMI by facsimile.

As the trial court pointed out, section 376.383 expressly distinguishes between electronic and facsimile and the provision that St. Luke's relies upon does not reference "facsimile" as an alternative format of communicating the claim. See § 376.383.1(8) (electronic or facsimile request), § 376.383.3 (electronic or facsimile notice), § 376.383.4 (electronic or facsimile notice). "The provisions of a legislative act are not read in isolation but construed together, and if reasonably possible, the provisions will be harmonized with each other." R.M.A. by Appleberry v. Blue Springs R-IV Sch. Dist. , 568 S.W.3d 420, 429 (Mo. banc 2019) (internal quotation marks omitted). "In determining the intent and meaning of statutory language, the words must be considered in context and sections of the statutes in pari materia , as well as cognate sections, must be considered in order to arrive at the true meaning and scope of the words." Id. (internal quotation marks omitted). St. Luke's submission of claims to BMI by facsimile transmission does not bring them within the purview of the MPPA.

St. Luke's also argues that its submission of the Doe claims to its clearinghouse in electronic format satisfied the MPPA's electronic-format-submission requirement. "When a term is not defined by statute, this Court will give the term its plain and ordinary meaning as derived from the dictionary." Hegger v. Valley Farm Dairy Co. , 596 S.W.3d 128, 131-32 (Mo. banc 2020) (internal quotation marks omitted). "Submit" is defined as "send or commit for consideration, study, or decision." WEBSTER'S THIRD NEW INT'L DICTIONARY 2277 (Unabridged 1961). Under the MPPA, "claims for reimbursement for a health care service ... submitted in an electronic format" are sent to the health carrier for decision, and the statute imposes penalties on a health carrier that fails to meet the statutory deadlines. See §§ 376.383.4, .5, .6. The statute also contains deadlines related to when a claim or additional information is received by a health carrier. See § 376.383.2 (within forty-eight hours after receipt of electronically filed claim by health carrier), § 376.383.3 (within thirty processing days after receipt of claim by health carrier), § 376.383.4 (within ten processing days after receipt of additional information by health carrier). On the other hand, a clearinghouse is a third-party intermediary that contracts with both providers and payors to facilitate the transmission of claims for payment from healthcare providers to healthcare payors. We agree with the trial court that:

[i]nterpreting "shall be submitted in an electronic format" to apply only to how a claimant submits its claims to its own clearinghouse would be unreasonable and inconsistent with the objectives to be accomplished through the MPPA. Thus "submitted" as used in the MPPA clearly refers to how claims are transmitted to the health carrier, not just the claimant's clearinghouse.

Electronic submission to the health carrier is mandatory, and since St. Luke's did not submit its claims electronically to BMI, the MPPA does not apply. Therefore, St. Luke's claim fails as a matter of law, and summary judgment was appropriate.

We recognize that this is a harsh result where, as here, BMI expressly requested non-electronic formatting for submission of claims from the third-party claims intermediary for St. Luke's—where section 376.384.2 expressly mandated that "[a]ny health carrier shall provide readily accessible electronic filing ... to health care providers." (emphasis added). But, the Missouri Prompt Payment Act ("MPPA") contemplated that the entities involved in the subject of the MPPA's provisions are all sophisticated medical provider and medical payment entities. Although St. Luke's was fully aware that it had a right to demand that Carthage and/or BMI accept its claims in an electronic format, it did not compel Carthage and/or BMI to do so. Hence, St. Luke's cannot now assert claims for penalties under a statutory construct that it did not follow. Conversely, as we explain in our ruling as to the Defendants’ separate cross-appeal claims for attorney's fees under the same statutory provisions that it chose to ignore (regarding the mandate that health carriers "shall" provide readily accessible electronic filing), neither can Defendants take advantage of penalty provisions where they have ignored those provisions of the MPPA that they did not like. As the 17th century Englishman, John Ray, first said in his publication of A Complete Collection of English Proverbs circa 1670, "What's good for the goose is good for the gander."

Point III is denied.

Points IV and V

In St. Luke's fourth point, it asserts that the trial court erred in granting summary judgment in favor of BMI on St. Luke's claim for breach of BMI's CSA MultiPlan contract on the ground that St. Luke's lacked standing. St. Luke's contends that it is a third-party beneficiary entitled to enforce BMI's MultiPlan contract.

"A third-party beneficiary is one who is not privy to a contract but may nonetheless maintain a cause of action for breach of contract." Septagon Constr. Co. Inc.-Columbia v. Indus. Dev. Auth. of City of Moberly , 521 S.W.3d 616, 624 (Mo. App. W.D. 2017). The rights of third-party beneficiaries depend on the terms of the contract itself. Id. at 625. "The third-party beneficiary need not be named in the contract, but the contract terms must clearly and directly express an intent to benefit an identifiable person or class." Id. "A party claiming third-party beneficiary rights has the burden of showing that provisions of the contract were intended for its direct benefit." Id.

There are three types of third-party beneficiaries: donee, creditor, and incidental. Id. "Donee and creditor beneficiaries may pursue actions and recover under a contract, but incidental beneficiaries may not." Id. " ‘A donee third-party beneficiary exists when the purpose of the promisee in obtaining the promise of all or part of the performance thereof is to make a gift to the beneficiary or to confer upon him a right against the promisor to some performance neither due nor supposed nor asserted to be due from the promisee to the beneficiary.’ " Id. (quoting L.A.C. ex rel. D.C. v. Ward Parkway Shopping Ctr. Co., L.P. , 75 S.W.3d 247, 260 (Mo. banc 2002) ) (internal quotation marks omitted). "A creditor beneficiary is one upon whom the promisee intends to confer the benefit of the performance of the promisee's contract with the promisor and thereby discharge an obligation or duty the promisee owes the beneficiary." Id. (internal quotation marks omitted). "[A]n incidental beneficiary is one who will benefit from the performance of the promise but is neither a promisee nor an intended beneficiary." Id.

Third-party beneficiaries do not have standing to sue on a contract if they are incidental beneficiaries that benefit only collaterally from the contract. Zygler v. Hawkins Constr. , 609 S.W.3d 61, 69 (Mo. App. E.D. 2020) (citing State ex rel. William Ranni Assoc., Inc. v. Hartenbach , 742 S.W.2d 134, 140 (Mo. banc 1987) ). "Only those third parties for whose primary benefit the contracting parties intended to make the contract may sue on the contract ... [and] the terms of the contract must clearly express an intent to benefit the third party." Fuller v. Partee , 540 S.W.3d 864, 870 (Mo. App. W.D. 2018) (internal quotation marks omitted).

"Contracts are made for the direct benefit of the contracting parties." Roskowske v. Iron Mountain Forge Corp. , 897 S.W.2d 67, 72 (Mo. App. E.D. 1995). "Other parties frequently derive some incidental benefit from the performance of the contract, but this gives them no right to enforce it." Id. "Moreover, the contract terms must clearly express that the contracting parties intended the third party to be the beneficiary of performance of the contract and have the right to maintain an action on the contract." Id. "Though a third-party beneficiary need not be named in the contract, the terms of the contract must directly and clearly express an intent to benefit the specific party or an identifiable class of which the party asserting rights as a third-party beneficiary is a member." Id. "A strong presumption arises that the parties were not contracting for third persons." Id. "Thus, the implication to overcome the presumption must be so strong as to amount to an express declaration." Id.

Doe was a participant under the Plan. Under the Plan, BMI administered claims pursuant to its ASA with Carthage. BMI contracted with MultiPlan through a CSA. Under the CSA, BMI was a "Client"; Carthage was a "User"; and St. Luke's was a "Network Provider" within the MultiPlan Provider Network. St. Luke's argues that sections D(6)(a) and D(6)(f) of the CSA expressed a clear intent to make it an intended beneficiary of the CSA.

Section D(6)(a) of the CSA between BMI and MultiPlan relates to Client responsibilities in connection with Network Services, specifically, compliance with the Network Provider Agreement. St. Luke's focuses on the following language in section D(6)(a):

Client acknowledges that certain Network Providers in the PPO Network are third party beneficiaries to this Agreement. Should Client seek to have access to the Network Provider Agreements with the Baylor Healthcare System and the HealthTexas Provider Network, the Baylor affiliated physicians located in Texas, and meet the qualifications for such access, Client shall sign an acknowledgement in a form identical to the one attached hereto as an exhibit to this Agreement.

(Emphasis added.) St. Luke's argues that the "certain Network Providers" language in section D(6)(a) means that all network providers except the Texas providers "are third party beneficiaries to this Agreement." We disagree. To the contrary, the contract language plainly indicates that only "certain Network Providers ... are third party beneficiaries" to the CSA. If the word "certain" is to have any meaning, the notion must be that the "Network Providers" being referenced must be specifically identified with "certainty" and to the exclusion of others not so denominated. In the CSA, the only specifically identified providers are Baylor Healthcare System and HealthTexas Provider Network. Simply put, St. Luke's is not a network provider specifically or otherwise "certainly" identified as a third-party beneficiary to the CSA. The contract language in section D(6)(a) does not express a clear intent to make St. Luke's an intended beneficiary of the CSA.

St. Luke's also argues that section D(6)(f) of the CSA shows an intent to directly benefit St. Luke's, allegedly because it obligates BMI to timely pay St. Luke's for services rendered under St. Luke's MultiPlan Network Provider Agreement:

User's Responsibilities. In the event that Client administers Programs on behalf of Users, it shall contractually obligate those Users to: (a) timely pay Network Providers the Contract Rates, (b) comply with the applicable terms and conditions of the Network Provider Agreements, and (c) comply with any applicable terms of this Agreement that may be the responsibility of the Users, including but not limited to those pertaining to the administration of the Programs and maintaining the confidentiality

of the information described in this Agreement, the Contract Rates and the terms of the network provider Agreements. In the event that Client fails to contractually obligate its Users to such terms and conditions, Client shall be responsible for those obligations and [MultiPlan] shall have the right to terminate this Agreement as to those Users. Client represents and warrants that it has the authority to bind each User to the applicable terms, obligations and conditions of this Agreement.

The contract language relates to the obligation of a MultiPlan Client, like BMI, to contractually obligate its Users, like Carthage, to certain terms and conditions; and if the Client fails to do so, MultiPlan has the right to terminate the agreement as to those Users. This provision of the CSA does not provide any rights to St. Luke's.

The CSA indicated that the contracting parties did not intend to provide St. Luke's with third-party rights under the agreement. The CSA was not made expressly for St. Luke's benefit or bound or obligated BMI to St. Luke's pursuant to the terms of the CSA. St. Luke's was, therefore, at most, an incidental third-party beneficiary under the CSA and did not have standing to maintain a cause of action against BMI for breach of the CSA. The trial court, therefore, properly granted summary judgment in favor of BMI on St. Luke's breach of contract claim as to BMI's CSA with MultiPlan.

Point IV is denied. Further, given our ruling as to Point IV, we need not and do not address the substantive claim that St. Luke's additionally asserts as to its rights under the CSA in Point V.

That said, we refer to our previous analysis of St. Luke's status under the Plan in Points I and II for the purpose of the litigation moving forward upon remand.

Point VI

In St. Luke's sixth and final point, it asserts that the trial court erred in granting judgment on the pleadings against it on its promissory estoppel claim against BMI by extending Carthage's section 432.070 defense to BMI on the grounds that BMI was acting as Carthage's agent.

Review of a trial court's ruling on a motion for judgment on the pleadings is de novo. Blackwood, Langworthy & Tyson, LLC v. Knipp , 571 S.W.3d 108, 114 (Mo. App. W.D. 2019). "Review of a grant of a motion for judgment on the pleadings requires this Court to decide whether the moving party is entitled to judgment as a matter of law on the face of the pleadings." Id. "For purposes of the motion, the well-pleaded facts pleaded by the nonmoving party are treated as admitted." Id. "A party moving for judgment on the pleadings assumes the pleaded facts to be true and must show that the facts are, nevertheless, insufficient as a matter of law." Id. "The trial court's grant of judgment on the pleadings will be affirmed only if review of the totality of the facts pleaded by the petitioner and the benefit of all reasonable inferences drawn therefrom reveals that petitioner could not prevail under any legal theory." Id. "The reviewing court is primarily concerned with the correctness of the result, not the route taken by the trial court to reach it; therefore, the trial court's judgment will be affirmed if it is correct on any ground supported by the record regardless of whether the trial court relied on that ground." Id. (internal quotation marks omitted).

"A claim of promissory estoppel has four elements: (1) a promise; (2) on which a party relies to his or her detriment; (3) in a way the promisor expected or should have expected; and (4) resulting in an injustice that only enforcement of the promise could cure." Clevenger v. Oliver Ins. Agency, Inc. , 237 S.W.3d 588, 590 (Mo. banc 2007) (citing Zipper v. Health Midwest , 978 S.W.2d 398, 411 (Mo. App. W.D. 1998) ). "The promise giving rise to the cause of action must be definite, and the promise must be made in a contractual sense." Id. (citing Zipper , 978 S.W.3d at 411). "In Missouri, promissory estoppel is not a favorite of the law, and each element must clearly appear...." Id.

In Count II of St. Luke's Second Amended Petition, it asserted a claim of promissory estoppel against BMI. Promissory estoppel first requires that a promise was made. St. Luke's alleged that BMI promised St. Luke's that St. Luke's would be paid for the healthcare services provided to Doe at the MultiPlan network rates and at the in-network benefit level of the Carthage Plan. The second element of promissory estoppel, detrimental reliance, is also satisfied. St. Luke's further alleged that it relied on BMI's promise when it provided and continued to provide healthcare services to Doe. Finally, St. Luke's alleged that BMI knew or should have known that St. Luke's would so rely. The well-pleaded facts of St. Luke's Second Amended Petition satisfied elements (1)-(3) of promissory estoppel. However, St. Luke's must also satisfy the final factor required for application of promissory estoppel: that failure to enforce the promise would result in injustice. St. Luke's alleged that an injustice would result if BMI was not required to tender in-network provider payments to St. Luke's as promised.

The "most significant" factor to consider " ‘[i]n determining whether injustice can be avoided only by enforcement of the promise [is] the availability and adequacy of other remedies at law." Id. at 591 (quoting Zipper , 978 S.W.2d at 411-12 ). Given our analysis of Points I and II, St. Luke's possesses an adequate remedy at law to pursue the damages it asserts in its promissory estoppel count.

In Clevenger v. Oliver Insurance Agency, Inc. , 237 S.W.3d 588 (Mo. banc 2007), the insureds were owners of an equestrian park and received notice from a neighboring property owner that runoff from the park contaminated a lake on the neighbor's property. Id. at 589. When the neighbor sued the insureds, the insurance company refused to defend on the basis that the policy excluded the claim. Id. The insureds brought an action against the insurance agency, alleging that they had been "assured" that the policy would provide coverage for such a claim. Id. Additionally, one of the insureds testified that he renewed the policy based on the insurance agent's assurances. Id. at 590. The trial court entered judgment for the insureds on their promissory estoppel claim, and the agent appealed. The Missouri Supreme Court found that the insureds failed to show a resulting injustice that only enforcement of the promise could cure. Id. at 591. The Court held that equitable relief based on promissory estoppel was not appropriate since the negligence claim, on which the insureds prevailed, provided an adequate remedy. Id. Because the insureds had an adequate remedy at law, equitable relief was not appropriate. Id.

Given our ruling in Point II that St. Luke's possesses the available and adequate legal remedy of breach of contract (i.e. , the Plan), which would adequately compensate it for the same damages it seeks in its equitable relief count, St. Luke's cannot establish the final element required for application of promissory estoppel: that injustice can only be avoided by enforcement of the promise. "Generally, equity will not intercede if an adequate remedy at law exists." Id. (internal quotation marks omitted). "Because [St. Luke's] had an adequate remedy at law, equitable relief is not appropriate." Id. The trial court did not err in entering judgment in favor of BMI on St. Luke's claim in Count II premised on the doctrine of promissory estoppel.

We note that the damages at law that remain pending against Carthage as a result of our ruling today are identical to those claimed against BMI in the promissory estoppel count, rendering the promissory estoppel claim, in effect, an alternative to the breach of contract claim against Carthage should it be determined that St. Luke's was not an in-network provider under the Plan. Though a party may ordinarily plead alternative remedies and elect its preferred remedy prior to submission of the case to the fact-finder, that general principle does not apply where one of the essential elements of an alternative remedy cannot be established as a matter of law. There is no suggestion in the record or by representations made to this Court at oral argument that BMI was not acting as an authorized agent of Carthage at all relevant times relating to the Plan. In fact, the parties conceded that BMI was acting as Carthage's authorized agent subject only to the constraint that BMI could not, by its representations to St. Luke's, alter the Plan's coverage obligations. Because we have concluded as a matter of law that, consistent with BMI's initial representations to St. Luke's, St. Luke's is an in-network provider pursuant to the unambiguous terms of the Plan, St. Luke's cannot establish, as a matter of law, the essential element of "injustice" in connection with its promissory estoppel count versus BMI.

Point VI is denied.

Points on Cross-Appeal

BMI's Point I, Gerber's Point I, Carthage's Point II

In BMI's first point, Gerber's first point, and Carthage's second point, they contend that the trial court erred in denying their request for attorney fees under the MPPA.

We review a trial court's attorney fee ruling for an abuse of discretion. Ostermeier v. Prime Props. Invs. Inc. , 589 S.W.3d 1, 6 (Mo. App. W.D. 2019). "Judicial discretion is abused when the court's ruling is against the logic of the circumstances and is so unreasonable and arbitrary that it shocks the sense of justice." Id. "Missouri courts adhere to the American Rule[,] which states that, ordinarily, litigants must bear the expense of their own attorney's fees." Id. at 5 (internal quotation marks omitted). "One common exception to the American Rule is where a statute authorizes a trial court to award attorney's fees." Id. Section 376.383.6(2) of the MPPA authorizes an award of attorney fees to be awarded a health carrier who defends a claim by a healthcare provider where the provider was "without reasonable grounds to recover a claim."

Our Supreme Court has never been supportive of permitting a party to benefit from embracing those provisions of a contract or statute that it likes while completely ignoring the burdens attached to other provisions of the same contract or statute.

Generally a party will not be permitted to take a position in regard to a matter which is directly contrary to, or inconsistent with, one previously assumed by [that party].... The situation here is very similar to that in those cases where a party seeks to accept the benefits of a contract, but to reject all or a part of its burdens. As said in Eberting v. Skinner , [364 S.W.2d 829, 835 (Mo. App. 1963) ], "he cannot now take the shield which she has handed him and use it as a sword against her."

Lugena v. Hanna , 420 S.W.2d 335, 341 (Mo. 1967).

Here, Defendants requested non-electronic claim filings by St. Luke's and thereby rejected the "burden" of the MPPA mandating that health carriers "shall provide readily accessible electronic filing ... to health care providers," § 376.384.2, and in so doing have succeeded in "shielding" themselves from liability to St. Luke's under the MPPA. Now, Defendants wish to embrace the "benefit" of the MPPA's attorney's fees provision and use the MPPA as a "sword."

As our ruling today denotes, though St. Luke's may not be able to assert its claim for penalties under the MPPA due to its procedural shortcomings on the non-electronic format of their claim for reimbursement, their claims are not "without reasonable grounds to recover." Further, we will not permit Defendants to ignore the MPPA's mandate of their claim-receiving requirements under the MPPA, only to then be rewarded with an award of attorney's fees that was, in part, created by their refusal to comply with the MPPA's mandate for their claim-receiving requirements.

BMI's Point I, Gerber's Point I, and Carthage's Point II are denied.

For the same reasons, the joint motion filed by BMI, Gerber, and Carthage seeking attorney's fees related to the appeal of this case is denied.

BMI's Point II, Carthage's Point I

In BMI's second point and Carthage's first point, they argue that the trial court erred in denying their joint motion for leave to file an amended answer and counterclaim.

As a matter of right, a party may amend its pleading once before a responsive pleading is served, or if no responsive pleading is permitted and the action has not been placed on the trial calendar, the pleading may be amended at any time within thirty days after it is served. Rule 55.33(a). "Otherwise, the pleading may be amended only by leave of court or by written consent of the adverse party; and leave shall be freely given when justice so requires." Id.

" ‘It is within the trial court's broad discretion to allow or disallow amendments to pleadings.’ " Newell Mach. Co., Inc. v. Pro Circuit, Inc. , 596 S.W.3d 635, 646 (Mo. App. W.D. 2020) (quoting Bach v. Winfield-Foley Fire Prot. Dist. , 257 S.W.3d 605, 610 (Mo. banc 2008) ). A trial court abuses its discretion "when the ruling is clearly against the logic of the circumstances and is so unreasonable and arbitrary that the ruling shocks the sense of justice and indicates a lack of careful, deliberate consideration." Id. at 642-43 (internal quotation marks omitted). " ‘An appellate court will not disturb a trial court's denial of a motion to amend a pleading unless it is clearly erroneous.’ " Id. at 646 (quoting Bach , 257 S.W.3d at 611 ). We consider the following factors when determining whether the trial court erred in denying leave to amend:

1) the hardship to the moving party that a denial would cause; 2) the reasons for the moving party's failure to include the matter in the original pleadings; 3) the timeliness of the application for leave to amend; and 4) the hardship or injustice that granting leave to amend would cause to the non-moving party.

Id. (internal quotation marks omitted).

On December 14, 2018, BMI, Carthage, and Gerber filed a joint motion for leave to file amended answers and counterclaims. They alleged that only recently during discovery they "learned that the facts and circumstances of the treatment and services provided by [St. Luke's] as relayed to BMI during the claims process in order to obtain payment were not accurate" and that one of Doe's treating physicians confirmed that "Doe was not a candidate for transplant, was never on the transplant list, and his LVAD was placed as destination therapy instead of bridge to transplant." They further alleged that these new facts affected their defenses to St. Luke's claims in that both the Carthage Plan and Gerber's stop-loss contract with Carthage specifically excluded coverage for medically unnecessary and experimental and/or investigational treatment. St. Luke's opposed the motion, asserting that "Defendants have always known that John Doe was never on the transplant list and received his LVAD as destination therapy."

A left ventricular assist device (LVAD) was placed in Doe on July 11, 2014. "This was a surgical placement in the body to keep the heart functioning and thus keep the patient alive either indefinitely (destination therapy) or pending a heart transplant (bridge to transplant)." L.F. Doc. 521.

On April 1, 2019, the trial court issued an order referring the matter to the previously appointed Special Master for discovery disputes to examine the issue of when BMI, Carthage, and Gerber had information sufficient to put them on notice that Doe was not a transplant candidate. On May 9, 2019, the Special Master filed his report. The Special Master found the most significant and earliest documentation regarding the matter was BMI's Utilization Review note dated June 9, 2014, to July 22, 2014.

• On June 9, 2014, St. Luke's informed BMI that Doe "is not a transplant candidate."

• On July 10, 2014, St. Luke's requested "approval to put in an LVAD for bridge to transplant" but BMI "advised that [it] would need more clinical information since admission in June had stated he was not a heart transplant candidate." St. Luke's responded that due to a change in Doe's body-mass index since his June 2014 admission, he was "being evaluated for heart transplant, but were requesting to place an LVAD 07/11/14." BMI "[a]pproved the LVAD to be done" and St. Luke's would "call on 07/14/14 regarding heart transplant."

• On July 11, 2014, Doe received LVAD.

• On July 22, 2014, St. Luke's informed BMI that Doe was "Status 7 awaiting transplant (not on active transplant list)."

The Special Master found that BMI, Carthage, and Gerber had notice of the potential dispute regarding Doe's eligibility to receive the LVAD implant as a covered expense in the summer of 2014.

No objections to the Special Master's report were filed, and the trial court adopted the report. The trial court concluded that "[b]ased on the Special Master's findings and after review of the factors governing amendment requests, the Court denies Defendants’ Joint Motion for Leave to Amend."

Defendants’ joint motion to amend was predicated on their claim that they did not know until December 2018 that Doe was not on the heart transplant list and that he received his LVAD device as destination therapy. However, BMI's own documentation confirms that the Defendants knew that Doe was not a candidate for transplant, was not on the transplant list, and received his LVAD as destination therapy as early as 2014. Thus, Defendants knew two years before St. Luke's filed its original action in 2016 about the facts underlying their proposed amendment. The purpose of the amendment rule is "to enable a party to present evidence that was overlooked or unknown at the time that the original pleading was filed." Eckel v. Eckel , 540 S.W.3d 476, 488 (Mo. App. W.D. 2018). "There is no abuse of discretion in denying the amended pleadings of parties who fail to show the pleadings include any facts that were unknown when the original pleading was filed." Id. The trial court did not abuse its discretion in denying leave to amend.

BMI's Point II and Carthage's Point I are denied. Conclusion

The trial court's judgment is affirmed in part, reversed in part, and remanded for further proceedings consistent with our ruling today.

Cynthia L. Martin, Chief Judge, and Thomas H. Newton, Judge, concur.


Summaries of

Saint Luke's Hosp. of Kan. City v. Benefit Mgmt. Consultants, Inc.

MISSOURI COURT OF APPEALS WESTERN DISTRICT
Apr 13, 2021
626 S.W.3d 731 (Mo. Ct. App. 2021)
Case details for

Saint Luke's Hosp. of Kan. City v. Benefit Mgmt. Consultants, Inc.

Case Details

Full title:SAINT LUKE'S HOSPITAL OF KANSAS CITY, Appellant-Respondent, v. BENEFIT…

Court:MISSOURI COURT OF APPEALS WESTERN DISTRICT

Date published: Apr 13, 2021

Citations

626 S.W.3d 731 (Mo. Ct. App. 2021)

Citing Cases

Clark v. Shaffer

"As a matter of right, a party may amend its pleading once before a responsive pleading is served, or if no…

NS Retail Holdings, LLC v. Advanced Stores Co.

Under Missouri law, “promissory estoppel has four elements: (1) a promise; (2) on which a party relies to his…