Madison v. Tulalip Tribes of Wash.

United States Court of Appeals, Ninth Circuit
Jan 13, 2006
163 F. App'x 499 (9th Cir. 2006)

Summary

dismissing case as moot: "Although there may indeed be litigation between these same parties in the future, it is not clear that there would be insufficient time to challenge the coverage under the 2003 permit before it expires."

Summary of this case from National Parks Conservation Ass'n v. United States Army Corps of Engineers

Opinion

Argued and Submitted August 3, 2004.

NOT FOR PUBLICATION. (See Federal Rule of Appellate Procedure Rule 36-3)

Claudia M. Newman, Esq., Bricklin & Gendler LLP, Seattle, WA, for Plaintiff-Appellant.

John A. Bryson, Esq., U.S. Department of Justice Environment & Natural Resources Division, Brian C. Kipnis, Esq., Washington, DC, for Defendant-Appellee.


Appeal from the United States District Court for the Western District of Washington, Barbara Jacobs Rothstein, District Judge, Presiding. D.C. No. CV-01-01111-BJR.

Before: KLEINFELD and CALLAHAN, Circuit Judges, and BERTELSMAN, District Judge.

The Honorable William O. Bertelsman, Senior United States District Judge for the Eastern District of Kentucky, sitting by designation.

MEMORANDUM

This disposition is not appropriate for publication and may not be cited to or by the courts of this circuit except as provided by 9th Cir. R. 36-3.

Appellant Guy Madison challenges the district court's grant of summary judgment

Page 500.

disposing of his challenges to a general permit for storm water discharges the government issued to the Tulalip Tribes. This case is moot, and we dismiss it for lack of authority to hear it.

In re Burrell, 415 F.3d 994, 998 (9th Cir.2005); Sze v. I.N.S., 153 F.3d 1005, 1007 (9th Cir.1998).

Madison claims that the government failed to conduct an environmental impact statement or environmental assessment as required by the National Environmental Protection Act in May of 2000 when the Tulalip Tribes obtained coverage under a 1998 regional National Pollution Discharge Elimination System storm water construction general permit to discharge storm water in connection with a construction project. In June of 2002 however, the Tribes completed the construction project and filed a "Notice of Termination" ending coverage under the permit. Moreover, the 1998 permit expired in 2003 and was replaced at that time by a new general permit due to expire in 2008. Therefore, the question of whether the EPA should have complied with NEPA when it extended coverage under the 1998 general permit is no longer live.

Both parties argue that the case is not moot because the life span of the Tribes' construction projects is short, so the controversy is capable of repeating itself yet evading review. Regardless of whether the short duration of a construction project would prevent judicial review of whether the EPA complies with NEPA when it extends permit coverage to a project, we conclude that the case is still moot because the issue here-whether the government was required to prepare an environmental impact statement for the issuance of general permit coverage to the Tribe for its construction project-is based on an argument that the 1998 general permit is a regulation. Because the 1998 general permit is no longer valid, any determination that the permit is or is not a regulation would not resolve controversies arising under the new 2003 permit. Although there may indeed be litigation between these same parties in the future, it is not clear that there would be insufficient time to challenge the coverage under the 2003 permit before it expires.

Because there is no longer a live controversy in this case, and because there will be adequate time to challenge any future permit coverage, we dismiss this case as moot. We also vacate the decision below under the doctrine of United States v. Munsingwear, Inc.

United States v. Munsingwear, Inc., 340 U.S. 36, 39, 71 S.Ct. 104, 95 L.Ed. 36 (1950); see also In re Burrell, 415 F.3d at 999.

The appeal is therefore DISMISSED as moot, and the decision of the district court VACATED.


Summaries of

Madison v. Tulalip Tribes of Wash.

United States Court of Appeals, Ninth Circuit
Jan 13, 2006
163 F. App'x 499 (9th Cir. 2006)

dismissing case as moot: "Although there may indeed be litigation between these same parties in the future, it is not clear that there would be insufficient time to challenge the coverage under the 2003 permit before it expires."

Summary of this case from National Parks Conservation Ass'n v. United States Army Corps of Engineers
Case details for

Madison v. Tulalip Tribes of Wash.

Case Details

Full title:Guy MADISON, Plaintiff--Appellant, v. TULALIP TRIBES OF WASHINGTON, an…

Court:United States Court of Appeals, Ninth Circuit

Date published: Jan 13, 2006

Citations

163 F. App'x 499 (9th Cir. 2006)

Citing Cases

National Parks Conservation Ass'n v. United States Army Corps of Engineers

See Miccosukee Tribe of Indians of Fla. v. United States Army Corps of Eng'rs, 259 F.Supp.2d 1237, 1244…

Amsterdam v. Haw.

There is no valid permit allowing for the construction of the TMT, and, given the successful challenge in…