From Casetext: Smarter Legal Research

In re Detroit Edison Co.

Court of Appeals of Michigan.
Jun 23, 2015
311 Mich. App. 204 (Mich. Ct. App. 2015)

Opinion

Docket No. 318388.

06-23-2015

In re APPLICATION OF DETROIT EDISON COMPANY FOR 2012 COST RECOVERY PLAN.

Bruce R. Maters, Jon P. Christinidis, and David S. Maquera and Fahey Schultz Burzych Rhodes PLC, Okemos (by William K. Fahey and Stephen J. Rhodes) for the Detroit Edison Company. Olson, Bzdok & Howard, PC (by Emerson Hilton and Christopher M. Bzdok, Traverse City,), and Shannon Fisk for the Michigan Environmental Council. Bill Schuette, Attorney General, Aaron D. Lindstrom, Solicitor General, Matthew Schneider, Chief Legal Counsel, B. Eric Restuccia, Deputy Solicitor General, and Steven D. Hughey and Anne M. Uitvlugt, Assistant Attorneys General, for the Michigan Public Service Commission.


Bruce R. Maters, Jon P. Christinidis, and David S. Maquera and Fahey Schultz Burzych Rhodes PLC, Okemos (by William K. Fahey and Stephen J. Rhodes) for the Detroit Edison Company.

Olson, Bzdok & Howard, PC (by Emerson Hilton and Christopher M. Bzdok, Traverse City,), and Shannon Fisk for the Michigan Environmental Council.

Bill Schuette, Attorney General, Aaron D. Lindstrom, Solicitor General, Matthew Schneider, Chief Legal Counsel, B. Eric Restuccia, Deputy Solicitor General, and Steven D. Hughey and Anne M. Uitvlugt, Assistant Attorneys General, for the Michigan Public Service Commission.

Opinion

PER CURIAM.

Michigan Environmental Council (MEC) appeals by right from an order of the Michigan Public Service Commission (PSC) granting the application filed by Detroit Edison Company (Edison) to implement a power supply cost recovery (PSCR) plan in its rate schedules for the 2012 metered jurisdictional sales of electricity, and for approval of its five-year forecast. We affirm.

I. PERTINENT FACTS AND PROCEDURAL HISTORY

This case concerns MEC's challenge to Edison's reduced-emission fuel (REF) project. This project involves applying chemical additives to coal to produce REF. Edison maintains that the use of REF results in reduced sulfur dioxide (SO2), mercury, and possibly nitrous oxide (NOx) emissions, and thus reduced emission expenses. Edison proposed to sell at book cost a portion of its coal inventory to affiliated unregulated fuels companies Belle River Fuels Company (BRFC) and the St. Clair Fuels Company (SCFC). The coal would be chemically treated at those plants and then sold back to Edison.

The PSC considered the REF project in an earlier case but did not grant Edison permission to implement the project at that time, concluding that it needed more information on the efficacy of the methods for reducing emissions. The PSC also required Edison to demonstrate that the REF project was a reasonable and prudent method of achieving maximum emission reduction at minimum cost, and that the REF project complied with the PSC's “Code of Conduct.”

See In re Application of Detroit Edison Company for 2011 PSCR Plan, order of the Public Service Commission, entered December 6, 2011 (Case No. U–16434, 2011 WL 6278331).

The Legislature enacted 2000 PA 141, the Customer Choice and Electricity Reliability Act (Act 141), MCL 460.10 et seq. , to further the deregulation of the electric utility industry. Detroit Edison Co. v. Pub. Serv. Comm. No. 1, 261 Mich.App. 1, 4, 680 N.W.2d 512 (2004), vacated in part on other grounds 472 Mich. 897, 695 N.W.2d 336 (2005). Act 141 required the PSC to implement a code of conduct to be applicable to all regulated electric utilities. MCL 460.10a(4) provides:
No later than December 2, 2000, the commission shall establish a code of conduct that shall apply to all electric utilities. The code of conduct shall include, but is not limited to, measures to prevent cross-subsidization, information sharing, and preferential treatment, between a utility's regulated and unregulated services, whether those services are provided by the utility or the utility's affiliated entities. The code of conduct established under this subsection shall also be applicable to electric utilities and alternative electric suppliers consistent with section 10, this section, and sections 10b through 10cc.
The PSC adopted its Code of Conduct in 2001.

On September 30, 2011, Edison filed an application requesting authority to implement a PSCR plan in its rates schedules for the 2012 metered jurisdictional sales of electricity. The application indicated that Edison intended to move forward with implementation of its REF project, but represented that the decision would have no impact on the requested maximum PSCR factor for 2012.

The Proposal for Decision issued by the administrative law judge (ALJ) assigned to the case recommended that Edison be denied permission to implement the REF project; however, contrary to the ALJ's recommendation, the PSC approved the REF project, stating as follows:

The Commission finds that Detroit Edison's REF project should be approved and that it complies with the Code of Conduct and the Guidelines. The Commission reviewed the company's testimony and Exhibits A–21 through A–23 and finds that Detroit Edison, in compliance with the directive in the December 6 order [in Case No. U–16434], provided the Commission with sufficient additional information to evaluate the reasonableness and prudence of the REF project.

The Commission believes that the REF project is a reasonable means of attaining maximum emission reductions for minimum cost. As explained by Detroit Edison, at [Edison's St. Clair Power Plant and its Belle River Power Plant], PSCR customers will receive a reduction in annual working capital expense through the sale, at market price, of a portion of the company's coal inventory to its affiliated fuels companies. The affiliated fuels companies will treat the coal with REF adder and then resell the treated coal to Detroit Edison. The cost of the REF adder will be offset by a corresponding savings in PSCR emissions allowance expense, resulting in a net cost of zero or less to PSCR customers. At [Edison's Monroe Power Plant], Detroit Edison receives a coal fee rate from the affiliated fuels company, reducing the cost of every ton of coal treated with REF adder that is consumed, which translates into a credit for the company's PSCR customers.

In response to the ALJ's finding that Detroit Edison did not provide any of the actual contracts between the company and its affiliated fuels companies for consideration, the Commission agrees with Detroit Edison that 1982 PA 304 (Act 304), MCL 460.6j et seq. only requires a description of all relevant major contracts, but does not require admission of the actual contracts. In addition, the Commission agrees with Detroit Edison and the Staff that the company's eligibility for the tax credits and the potential for the affiliated fuels companies to profit from the REF project is irrelevant to an Act 304 proceeding. As explained by Detroit Edison, Act 304 does not permit “the Commission to include third party expenses or revenues related to coal or any other fuel supply into Act 304 review and ratemaking.” Detroit Edison's replies to exceptions, p. 27. As a result, the Commission may not consider whether the tax credits may be used to offset fuel costs.

The Commission disagrees with the Attorney General that REF costs should be treated as O & M costs. As explained by Detroit Edison, MCL 460.6j(13)(d) refers to “fuel movement that occurs after the utility receives the fuel at the power plant.” Detroit Edison's replies to exceptions, p. 21. The Commission finds that all of the coal processing costs take place before the coal is delivered to the company.

Based on the evidence presented in Exhibits A–21 and A–23, the Commission finds that the REF project complies with the Code of Conduct. There is structural separation between the company and its affiliated fuels companies; they do not engage in joint advertising, marketing, or other promotional activities related to the provision of the fuels processing service; and there is no preferential treatment for or subsidization of the affiliated fuels companies by Detroit Edison.

The Commission finds that Detroit Edison has complied with Section III.C of the Code of Conduct. As discussed previously, the record supports that Detroit Edison purchases coal from a third party at market price, then sells the coal at the same market price to its affiliated fuels companies. The cost of the coal for the affiliated fuels companies is Detroit Edison's booked cost, or its fully allocated embedded cost. Therefore, both the market cost and the fully allocated embedded cost is higher than the other, compensation to Detroit Edison by the affiliated fuels companies complies with Section III.C of the Code of Conduct.

When the affiliates resell the treated coal to Detroit Edison, it is for the same market price the affiliated fuels companies paid to the company (or in this case, the fully allocated embedded cost), plus the cost of REF adder. The price of the treated coal is offset by a corresponding savings in PSCR emissions allowance expense, resulting in zero cost for the treated coal. Under Section III.C of the Code of Conduct, compensation to the affiliated fuels companies by Detroit Edison for the treated coal must be the lower of market price or 10% over fully allocated embedded cost. Because market price and the fully allocated embedded cost are the same in this case, the Commission finds that market price is lower than 10% over the fully allocated embedded cost. By paying the affiliated fuels companies market price for the treated coal, Detroit Edison has complied with Section III.C of the Code of Conduct.

The Commission agrees with Detroit Edison that the company did not violate the pre-sale notification requirements of the Guidelines with the sale of its coal inventory. As stated by Detroit Edison, the pre-sale notification requirement was intended to provide the Commission with notice of intent to sell significant utility plant property, and not the routine sales involved here. The Commission finds that Detroit Edison's sale of its coal inventory is not utility plant property, but is part of the utility's day-to-day business.

Based on the testimony and evidence provided by Detroit Edison, the Commission finds credible Detroit Edison's claim that it investigated REF arrangements with the two other licensees, CERT and A.J. Gallagher, but that [DTE Energy Services] offered Detroit Edison the best deal. Detroit Edison provided substantial testimony about the price of REF adder at other licensees' facilities and provided ample evidence that Detroit Edison's customers would have paid more had the company contracted with these other companies. [In re Detroit Edison's Application for a 2012 PSCR Plan, order of the Public Service Commission, entered June 28, 2013 (Case No. U–16892), pp. 31–34, 2013 WL 3355854.]

The PSC approved Edison's application for a PSCR plan for Edison's 2012 metered jurisdictional electric sales and the REF project. This appeal followed.

II. STANDARD OF REVIEW

The standard of review for PSC orders is narrow and well defined. Under MCL 462.25, all rates, fares, charges, classification and joint rates, regulations, practices, and services prescribed by the PSC are presumed, prima facie, to be lawful and reasonable. See Mich. Consol. Gas Co. v. Pub. Serv. Comm., 389 Mich. 624, 635–636, 209 N.W.2d 210 (1973). A party aggrieved by an order of the PSC has the burden of proving by clear and convincing evidence that the order is unlawful or unreasonable. MCL 462.26(8). To establish that a PSC order is unlawful, the appellant must show that the PSC failed to follow a mandatory statute or abused its discretion in the exercise of its judgment. See In re MCI Telecom. Complaint, 460 Mich. 396, 427, 596 N.W.2d 164 (1999). An order is unreasonable if it is not supported by the evidence. See Attorney General v. Pub. Serv. Comm., 269 Mich.App. 473, 479, 713 N.W.2d 290 (2006).

A final order of the PSC must be authorized by law and be supported by competent, material, and substantial evidence on the whole record. Const. 1963, art. 6, § 28; Attorney General v. Pub. Serv. Comm., 165 Mich.App. 230, 235, 418 N.W.2d 660 (1987).

This Court gives due deference to the PSC's administrative expertise, and is not to substitute its judgment for that of the PSC. Attorney General v. Pub. Serv. Comm. No. 2, 237 Mich.App. 82, 88, 602 N.W.2d 225 (1999). We give deference to the PSC's interpretation of its own Code of Conduct; however we apply principles of statutory construction in our review of that code and its statutory underpinnings. See In re Complaint of Consumers Energy Co., 255 Mich.App. 496, 503–504, 660 N.W.2d 785 (2003). If the language of a statute is vague or obscure, the PSC's construction serves as an aid to determining legislative intent, and will be given weight if it does not conflict with the language of the statute or the purpose of the Legislature. However, the construction given to a statute or the PSC's Code of Conduct by the PSC is not binding on us. See In re Complaint of Rovas Against SBC Mich., 482 Mich. 90, 103–109, 754 N.W.2d 259 (2008). Whether the PSC exceeded the scope of its authority is a question of law that we review de novo. In re Complaint of Pelland Against Ameritech Mich., 254 Mich.App. 675, 682, 658 N.W.2d 849 (2003).

III. CODE OF CONDUCT

On appeal, MEC argues that the PSC erred by finding that Edison's REF project complied with the Code of Conduct. We disagree.

The purpose of the PSC's Code of Conduct is to “promote fair competition by establishing measures to prevent cross-subsidization, information sharing, and preferential treatment between the regulated and unregulated operations of electric utilities, alternative electric suppliers, and their affiliates.” Code of Conduct, preface.

Section II of the Code of Conduct, entitled “Separation,” provides in part:

An electric utility or alternative electric supplier that offers, itself or through its affiliates, both regulated and unregulated services shall do so with the structural or functional separation needed to prevent cross-subsidization, information sharing, and preferential treatment between the regulated and unregulated services. This includes, but is not limited to, the following:

* * *

B. An electric utility's or alternative electric supplier's regulated services shall not subsidize in any manner, directly or indirectly, the unregulated business of its affiliates or other separate entities.

Section III of the Code of Conduct, entitled “Discrimination,” provides in part:

An electric utility or alternative supplier that offers, itself or through its affiliates, both regulated and unregulated services shall not unduly discriminate in favor of or against any party, including its affiliates. This includes, but is not limited to, the following:

* * *

C. If an electric utility or alternative electric supplier offering regulated service in Michigan provides services, products, or property to any affiliate or other entity within the corporate structure, compensation shall be based upon the higher of fully allocated embedded cost or market price. If an affiliate or other entity within the corporate structure provides services, products, or property to an electric utility or alternative electric supplier offering regulated service in Michigan, compensation for services and supplies shall be at the lower of market price or 10% over fully allocated embedded cost and transfers of assets shall be based upon the lower of fully allocated embedded cost or market price.

MEC argues that Edison's sale of coal to the fuels companies, and the repurchase of treated coal at the same price from them, violates the Code of Conduct in that: (1) the sale subsidizes the fuels companies because the companies are able to receive favorable tax treatment as a result of the transactions, and (2) Edison's sale of the coal at the fully allocated embedded cost and repurchase of the coal at the same price violates the pricing provision of the Code of Conduct.

MEC cites no authority to support its arguments. An appellant's failure to properly address the merits of an argument constitutes the abandonment of an issue. Woods v. SLB Prop. Mgt., LLC, 277 Mich.App. 622, 626–627, 750 N.W.2d 228 (2008). At any rate, we find that MEC's argument is without merit. The Code of Conduct prohibits acts that result in cross-subsidization and preferential treatment between a regulated utility and an unregulated affiliate. Code of Conduct, preface. A “subsidy” is defined as “any grant or contribution of money.” Random House Webster's College Dictionary (1997), p. 1284. Nothing in the code prevents an unregulated affiliate from making a profit from a project with a regulated utility. The fuels companies gained tax benefits from selling treated coal to Edison. The undisputed evidence showed that Edison could not have obtained those same tax benefits. There is no evidence establishing that, had Edison done business with an unaffiliated company rather than with its affiliates, that company would not have also obtained the same tax benefits. Edison did not give or grant money to the fuels companies, and did not subsidize the companies in any indirect way.

In addition, MEC presents no evidence to support its assertion that Edison's sale of coal to the fuels companies at the fully allocated embedded cost, which is the same as the market price at which Edison bought the coal, and Edison's repurchase of the coal from the fuels companies at the same price, violates the pricing provisions of the Code of Conduct. MEC asserts that the value added to the coal from the treatment by the fuels companies should have factored into the repurchase price, but does not indicate how that could have been done or if Edison could have done so effectively without violating Section III(C) of the Code of Conduct.

Further, MEC's assertion that the PSC should have required Edison to submit the actual contracts with the fuels companies rather than simply describing the contracts is without merit. MCL 460.6j(3) states that a PSCR plan “shall describe all major contracts and power supply arrangements entered into by the utility....” The PSC did not indicate that it was unable to resolve the issue without examining the actual contracts.

Finally, we reject MEC's assertion that the PSC's finding that Edison investigated the possibility of entering into contracts with unaffiliated companies was not supported by the evidence. Edison's witness testified that other Edison employees had investigated the possibility of contracting with unaffiliated companies but that no such arrangements were made. The ALJ described the witness's testimony as not credible, but the PSC found to the contrary. The PSC was entitled to accept the testimony from Edison's witness even if the record contained evidence that contradicted that testimony. See Great Lakes Steel Div. of Nat'l Steel Corp. v. Mich. Pub. Serv. Comm., 130 Mich.App. 470, 481–482, 344 N.W.2d 321 (1983).

MEC obviously disagrees with the PSC's conclusion regarding subsidization, but has offered no direct evidence to establish that Edison's arrangement with the fuels companies violated the Code of Conduct. MEC has not established that the PSC's order is unlawful or unreasonable. See MCL 462.26(8).

IV. FUELS COMPANIES' TAX CREDIT REVENUE

Next, MEC argues that the PSC erred by holding that the revenue generated for the fuels companies from tax credits was irrelevant to determining whether Edison took all appropriate steps to minimize its costs. We disagree.

MCL 460.6j(6) provides:

In its final order in a power supply and cost review, the commission shall evaluate the reasonableness and prudence of the decisions underlying the power supply cost recovery plan filed by the utility pursuant to subsection (3), and shall approve, disapprove, or amend the power supply cost recovery plan accordingly. In evaluating the decisions underlying the power supply cost recovery plan, the commission shall consider the cost and availability of the electrical generation available to the utility; the cost of short-term firm purchases available to the utility; the availability of interruptible service; the ability of the utility to reduce or to eliminate any firm sales to out-of-state customers if the utility is not a multi-state utility whose firm sales are subject to other regulatory authority; whether the utility has taken all appropriate actions to minimize the cost of fuel; and other relevant factors. The commission shall approve, reject, or amend the 12 monthly power supply cost recovery factors requested by the utility in its power supply cost recovery plan. The factors shall not reflect items the commission could reasonably anticipate would be disallowed under subsection (13). The factors ordered shall be described in fixed dollar amounts per units of electricity, but may include specific amounts contingent on future events.

The PSC has only that authority granted to it by statute. Union Carbide Corp. v. Pub. Serv. Comm., 431 Mich. 135, 148–150, 428 N.W.2d 322 (1988). The Legislature must grant authority by “clear and unmistakable” statutory language. Mich. Electric Coop. Ass'n v. Pub. Serv. Comm., 267 Mich.App. 608, 616, 705 N.W.2d 709 (2005).

The gravamen of MEC's argument is that the PSC erred by failing to consider the fact that the fuels companies received favorable tax treatment by dealing with Edison, and that Edison should have negotiated more advantageous arrangements with the fuels companies to account for the fact that the companies were able to obtain tax credits for selling treated coal to Edison. However, MEC points to no statutory authority that allows the PSC to consider another party's tax benefits when determining whether a utility's decisions underlying its PSCR plan were reasonable and prudent. These tax advantages were not available to Edison, and Edison had no apparent control over the amount of the credit each company would receive. In addition, MEC fails to explain how Edison could determine what amounts to account for when negotiating the contracts, i.e., how much in tax credits the fuels companies would obtain, and whether Edison could account for these amounts and still comply with Section III(C) of the Code of Conduct.

The PSC had no clear authority to consider the fuels companies' tax credits when determining whether Edison's PSCR decisions were reasonable and prudent. Therefore, the PSC did not err by failing to consider the tax credits. The PSC's decision was not unlawful or unreasonable. MCL 462.26(8).

Finally, MEC argues that the PSC's order was not supported by competent, material, and substantial evidence on the whole record. We disagree. MEC waived this issue by failing to raise it before the PSC. See Shaw v. Ecorse, 283 Mich.App. 1, 22, 770 N.W.2d 31 (2009). Nevertheless, we find that the issue is without merit. MEC's argument in this regard is simply a restatement of the unpersuasive arguments that we have already rejected.

V. CONCLUSION

For the reasons stated in this opinion, we hold that the PSC's order granting Edison's application to implement a PSCR plan in its rate schedules for the 2012 metered jurisdictional sales of electricity and for approval of Edison's five-year forecast is lawful and reasonable. See MCL 462.26(8).

Affirmed.

BOONSTRA, P.J., and SAAD and MURRAY, JJ., concurred.


Summaries of

In re Detroit Edison Co.

Court of Appeals of Michigan.
Jun 23, 2015
311 Mich. App. 204 (Mich. Ct. App. 2015)
Case details for

In re Detroit Edison Co.

Case Details

Full title:In re APPLICATION OF DETROIT EDISON COMPANY FOR 2012 COST RECOVERY PLAN.

Court:Court of Appeals of Michigan.

Date published: Jun 23, 2015

Citations

311 Mich. App. 204 (Mich. Ct. App. 2015)
874 N.W.2d 398

Citing Cases

Brunet v. City of Rochester Hills

constitutes the abandonment of an issue." In re Application of Detroit Edison Co for 2012 Cost Recovery Plan,…

Mich. Pub. Serv. Comm'n v. Ind. Mich. Power Co. (In re Ind. Mich. Power Co.)

"An appellant's failure to properly address the merits of an argument constitutes the abandonment of an…