E. Cornell Malone Corp. v. Sisters of the Holy Family

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA SECTION: "G"(5)
May 23, 2012
CIVIL ACTION NO. 12-0361 (E.D. La. May. 23, 2012)

Summary

refusing to enforce clause “because the construction project is located within Louisiana ... against the public policy of Louisiana, under both the Louisiana statute and by application of [The Bremen ] regarding a forum selection clause in contravention of public policy”

Summary of this case from Bowen Eng'g, Corp. v. Pac. Indem. Co.

Opinion

CIVIL ACTION NO. 12-0361

05-23-2012

E. CORNELL MALONE CORP. v. SISTERS OF THE HOLY FAMILY, ST. MARY'S ACADEMY OF THE HOLY FAMILY, WESTERN SURETY COMPANY, and SAFECO INSURANCE COMPANY OF AMERICA


ORDER AND REASONS

Before the Court is Defendants Western Surety Company ("Western") and Safeco Insurance Company of America's ("Safeco") (collectively, the "moving Defendants") Motion to Dismiss, Alternatively to Stay Proceedings. Having considered the motion, the response, the record, and the applicable law, for the following reasons, the Court will deny the motion.

Rec. Doc. 9.

I. Background

A. Factual Background

This case arises from a dispute regarding a construction project, No. 57270-St. Mary's Academy Permanent High School Campus, located in New Orleans, Louisiana. St. Mary's Academy of the Holy Family ("St. Mary's") entered into a construction contract on the project with a general contractor, Satterfield & Pontikes Construction Group, LLC ("S&P"). The funding for the project was provided by the Federal Emergency Management Agency ("FEMA"), with funds paid to the State of Louisiana through the Governor's Office of Homeland Security and Emergency Preparedness ("GOHSEP"), which administers the funds and pays the applicant, here St. Mary's.

Rec. Doc. 1 at ¶ 7.

Id. at ¶ 8; Rec. Doc. 23 at p. 3.

Rec. Doc. 9-2 at p. 2.

For the project, Western and Safeco, as sureties to S&P, issued a $31,800,000 payment bond, obligating themselves to pay S&P's debts with respect to work on the project. During the course of the project, S&P entered into a $1,280,000 subcontract with Plaintiff, E. Cornell Malone Corp. ("Malone") for Malone to perform roofing for the project. Malone alleges that it "fully and satisfactorily performed its scope of work under the terms of the Subcontract and in compliance with the Project's plans and specifications applicable to Malone's scope of work." Malone also alleges that it timely submitted invoices to S&P throughout the course of the project but that $134,236.73 remains due and owing to Malone for work performed.

Rec. Doc. 1 at ¶ 9; Rec. Doc. 19-3; Rec. Doc. 23 at pp. 3-4.

Rec. Doc. 1 at ¶ 10; Rec. Doc. 23 at p. 4.

Rec. Doc. 1 at ¶ 11; see also Rec. Doc. 23 at p. 4 ("The fact that Malone's work conformed to the requirements of the plans, specifications, and contract documents is evidenced by the fact that the Project was accepted as complete by the Owner. In fact, the Defendants herein do not allege or claim that Malone's work was incomplete or deficient in any way.").

Rec. Doc. 1 at ¶¶ 12-13; see also Rec. Doc. 23 at p. 4.

On February 25, 2011, Malone "filed and recorded with the Clerk of Court and Recorder of Mortgages for the Parish of Orleans, an Affidavit and Sworn Statement of Amount Due and Statement of Claim or Privilege," creating a lien and privilege on the project property where Malone performed the roofing work. Malone filed an amendment to the affidavit on March 16, 2011, in which it added an additional claim, supplementing the first privilege.

Rec. Doc. 1 at ¶ 15; Rec. Doc. 19-1; Rec. Doc. 23 at pp. 4-5.

Rec. Doc. 1 at ¶ 16; Rec. Doc. 19-2; Rec. Doc. 23 at p. 5.

B. Procedural Background

As a result of these events, on February 6, 2012, Malone filed suit against defendants St. Mary's, Western, and Safeco. Malone alleges a claim against St. Mary's, secured by the privileges entered on the immovable property, under the provisions of La. R.S. § 9:4801, et seq. Malone also alleges that St. Mary's remains liable, even though Western and Safeco issued payment bonds for the project, because, allegedly, the notice and bond were not properly and timely filed in accordance with La. R.S. § 9:4811. Additionally, Malone alleges claims against Western and Safeco on the Labor and Material Payment Bond under the provisions of the payment bond, the Louisiana Private Works Act, and Louisiana law regarding sureties. Malone has specifically stated that it "did not and has not sued S&P on or under the Malone Subcontract." Having inadvertently omitted the exhibits referenced in Malone's complaint, on April 25, 2012, Malone filed an unopposed motion for leave to file the exhibits, which this Court granted.

Rec. Doc. 1. St. Mary's was originally incorrectly named as Sisters of the Holy Family, St. Mary's Academy of the Holy Family.

Rec. Doc. 1 at ¶ 17.

Id. at ¶ 18.

La. C.C. art. 3035, et seq.

Rec. Doc. 23 at p. 5.

Rec. Doc. 19.

Rec. Doc. 22.

Western and Safeco filed the present Motion to Dismiss, Alternatively to Stay Proceedings on March 22, 2012, in which they assert that this action should be stayed or dismissed due to improper venue, due to a pending state court action, or because this suit is premature due to specific provisions in the subcontract entered into between Malone and S&P. Malone filed its response in opposition on April 27, 2012.

Rec. Doc. 9.

Rec. Doc. 23.

On March 30, 2012, St. Mary's filed its answer, in which it also asserted a third party demand against S&P and asserted cross claims against Western and Safeco. Therein, St. Mary's asserts that S&P failed to perform its work in a good and workmanlike manner, that S&P failed to complete the project within the time specified in the contract, and that St. Mary's made all payments that were due and owing under the contract for work performed by S&P and Malone. Against Western and Safeco, St. Mary's asserts that to the extent that St. Mary's is liable to Malone for amounts not paid for Malone's work on the project, Western and Safeco as sureties must indemnify St. Mary's for amounts deemed to be owed. Western and Safeco have filed a second motion to dismiss or stay, regarding the cross claims asserted by St. Mary's, and S&P has filed a motion to dismiss or stay or for a more definite statement, in which S&P also asserts a counterclaim against St. Mary's.

Rec. Doc. 12.

Id. at ¶¶ 32-36.

Id. at ¶¶ 48-50.

Rec. Doc. 25.

Rec. Doc. 27.

II. Law and Analysis

A. Motion to Dismiss for Improper Venue

The moving Defendants argue that this Court should dismiss the present action because of a forum selection clause contained within the subcontract between S&P and Malone, which requires any disputes to be litigated in Harris County, Texas.

Rec. Doc. 9-2 at p. 11.

Subcontract Agreement, Rec. Doc. 9-5 at section 11(d)(ii).

Under the Federal Rules of Civil Procedure, a party may move a court to dismiss an action for improper venue. When an action has been filed in an improper district, the district court "shall dismiss, or if it be in the interest of justice, transfer such case to any district or division in which it could have been brought." In deciding whether venue is proper, the court may look outside of the complaint and its attachments. There exists a split within the Fifth Circuit regarding which party bears the burden of proof on a Rule 12(b)(3) motion to dismiss for improper venue, but the burden of proof is clear when improper venue is asserted on the basis of a forum selection clause. Forum selection clauses are generally enforceable under federal law, and a party resisting enforcement "bears a 'heavy burden of proof.'" The presumption of enforceability "may be overcome, however, by a clear showing that the clause is 'unreasonable under the circumstances.'"

Ambraco Inc. v. Bossclip B.V., 570 F.3d 233, 238 (5th Cir. 2009), cert. denied, 130 S.Ct. 1054 (2010).

See Ross v. Digioia, No. 11-1827, 2012 WL 72703, at *2 (E.D. La. Jan. 10, 2012) (Vance, C.J.) (collecting cases).

Ginter ex rel. Ballard v. Belcher, Prendergast & Laporte, 536 F.3d 439, 441 (5th Cir. 2008).

Id. (quoting Haynsworth v. The Corporation, 121 F.3d 956, 963 (5th Cir. 1997)).

Haynsworth, 121 F.3d at 963 (quoting M/S Bremen v. Zapata Off-Shore Co., 407 U.S. 1, 10 (1972)).

Where a forum selection clause "would contravene a strong public policy of the forum in which suit is brought, whether declared by statute or by judicial decision," the United States Supreme Court has held that the clause is unreasonable under the circumstances and should not be enforced. Louisiana law specifically provides:

Bremen, 407 U.S. at 15.

. . . with respect to construction contracts, subcontracts, and purchase orders for public and private works projects, when one of the parties is domiciled in Louisiana, and the work to be done and the equipment and materials to be supplied involve construction projects in this state, provisions in such agreements requiring disputes arising thereunder to be resolved in a forum outside of this state or requiring their interpretation to be governed by the laws of another jurisdiction are inequitable and against the public policy of this state.

The statute goes on to "declare[] null and void and unenforceable as against public policy any provision in a contract, subcontract, or purchase order" that "[r]equires a suit or arbitration proceeding to be brought in a forum or jurisdiction outside of this state."

La. R.S. § 9:2779A.

La. R.S. § 9:2779A.

La. R.S. § 9:2779B.

Here, the Malone subcontract purports to require Malone to file suit in Harris County, Texas:

In the event that arbitration does not hold pursuant to the Subcontract for any reason, then Subcontractor agrees that the dispute will be resolved by courts of competent jurisdiction in Harris County, Texas.

However, because the construction project is located within Louisiana and because one of the parties to the subcontract, S&P, is domiciled in Louisiana, the forum selection clause in the Malone subcontract, which would require litigation outside of Louisiana, is unenforceable as against the public policy of Louisiana, under both the Louisiana statute and by the application of Supreme Court case law regarding a forum selection clause in contravention of public policy.

Subcontract Agreement, Rec. Doc. 9-5 at section 11(d)(ii).

Subcontract Agreement, Rec. Doc. 9-5 at section 11(d)(ii).

Bremen, 407 U.S. at 15.

Additionally, the payment bond itself, under which the claims against the moving Defendants are brought, states:

[n]o suit or action shall be commenced hereunder by any claimant . . . [o]ther than in state court of competent jurisdiction in and for the county or other political subdivision of the state in which the Project, or any part thereof is situated or in the United States District Court for the district in which the Project, or any part thereof, is situated, and not elsewhere.

Malone has not attempted to provide any evidence that would meet the "heavy burden of proof" to demonstrate that this forum selection clause, requiring litigation within Orleans Parish or the Eastern District of Louisiana, is unenforceable. Furthermore, Louisiana courts have held that action brought on a lien under the Louisiana Private Works Act "must proceed in a court having jurisdiction over the property, that is, in the parish where the land is situated."

Labor and Material Payment Bond, Rec. Doc. 19-3 at p. 2.

Labor and Material Payment Bond, Rec. Doc. 19-3 at p. 2.

Gurtler, Herbert & Co. v. Marquette Cas. Co., 145 So.2d 145, 148 (La.App. 4 Cir. 1962).

Accordingly, venue is proper in this District, and this Court need not and will not dismiss the present action because of the provision in the subcontract that would require suit to have been filed in Harris County, Texas.

B. Motion to Dismiss or Alternatively to Stay

1. Standard on Motion to Dismiss

The Federal Rules of Civil Procedure provide that an action may be dismissed "for failure to state a claim upon which relief can be granted." "Factual allegations must be enough to raise a right to relief above the speculative level" and must contain "enough facts to state a claim to relief that is plausible on its face." A claim is facially plausible when the plaintiff has pled facts that allow the court to "draw a reasonable inference that the defendant is liable for the misconduct alleged."

Bell Atl. Corp. v. Twombly, 550 U.S. 544, 556 (2007).

In re Katrina Canal Breaches Litigation, 495 F.3d 191, 205 (5th Cir. 2007) (quoting Twombly, 550 U.S. at 570).

Twombly, 550 U.S. at 570.

On a motion to dismiss, asserted claims are liberally construed in favor of the claimant, and all facts pleaded are taken as true. The court, however, should not look beyond the pleadings, although exhibits are considered part of a pleading; if the court does look beyond the pleadings and any attachments thereto, the Federal Rules of Civil Procedure generally require the court to "treat the motion to dismiss as one for summary judgment and to dispose of it as provided in Rule 56." If the motion is converted to one for summary judgment, the Court must first provide the parties notice and then may consider the evidence.

Leatherman v. Tarrant Cnty. Narcotics Intelligence & Coordination Unit, 507 U.S. 163, 164 (1993); see also Tellabs, Inc. v. Makor Issues & Rights, Ltd., 551 U.S. 308, 322-23 (2007).

See Fed R. Civ. P. 12(b); O'Quinn v. Manuel, 773 F.2d 605, 608 (5th Cir. 1985).

Neville v. Am. Rep. Ins. Co., 912 F.2d 813, 814 n. 1 (5th Cir. 1990); U.S. ex rel. Riley v. St. Luke's Episocopal Hosp., 355 F.3d 370, 375 (5th Cir. 2004).

Carter v. Stanton, 405 U.S. 669, 671 (1972). There does exist a narrow exception to this rule, such that a court can consider documents attached to the motion to dismiss without converting the motion to one for summary judgment if the complaint referred to the documents and they are central to the plaintiff's claim. Causey v. Sewell Cadillac-Chevrolet, Inc., 394 F.3d 285, 288 (5th Cir. 2004) (citing Collins v. Morgan Stanley Dean Witter, 224 F.3d 496, 498-99 (5th Cir. 2000)).

Scanlan v. Tex. A&M Univ., 343 F.3d 533, 539 (5th Cir. 2003).

Though required to accept all "well-pleaded facts" as true, the court is not required to accept legal conclusions as true. Similarly, "[t]hreadbare recitals of the elements of a cause of action, supported by mere conclusory statements" will not suffice. The complaint must offer more than an "unadorned, the defendant-unlawfully-harmed-me accusation." If factual allegations are insufficient to raise a right to relief above the speculative level, or if it is apparent from the face of the complaint that there is an "insuperable" bar to relief, the claim must be dismissed.

Ashcroft v. Iqbal, 556 U.S. ___; 129 S.Ct. 1937, 1949-50 (2009).

Id. at 1949.

Id.

Moore v. Metropolitan Human Serv. Dep't, No. 09-6470, 2010 WL 1462224, at * 2 (E.D. La. Apr. 8, 2010) (Vance, C.J.) (citing Jones v. Bock, 549 U.S. 199, 215 (2007); Carbe v. Lappin, 492 F.3d 325, 328 & n. 9 (5th Cir. 2007)).

2. Standard on Motion to Stay

There is no question that a district court has inherent power to "control the disposition of the causes on its docket with economy of time and effort for itself, for counsel, and for litigants," nor is there a question that this authority includes the district court's wide discretion to grant a stay in a pending matter. When "the interests of justice seem[] to require such action," a court may exercise its discretion to stay civil proceedings, postpone discovery, or impose protective orders and conditions.

Landis v. N. Am. Co., 299 U.S. 248, 254 (1936).

In re Ramu Corp., 903 F.2d 312, 318 (5th Cir. 1990).

United States v. Kordel, 397 U.S. 1, 12 n. 27 (1970); see also Mayo v. Tri-Bell Indus., 787 F.2d 1007, 1012 (5th Cir. 1986).

In some circumstances, a federal court may stay or abstain from hearing a case due to the existence of parallel state court proceedings. However, "[g]enerally . . . the pendency of an action in the state court is no bar to the proceedings concerning the same matter in the Federal court having jurisdiction." Only under truly "exceptional circumstances" may federal courts stay a case out of deference to pending state court proceedings.

Colorado River Water Conservation Dist. v. United States, 424 U.S. 800 (1976).

Id. at 817.

Cnty. of Allegheny v. Frank Mashuda Co., 360 U.S. 185, 188-89 (1959); see also Stewart v. Western Heritage Ins. Co., 438 F.3d 488, 492-93 (5th Cir. 2006); Mahbod v. New York Life Ins. Co., No. 05-3266, 2006 WL 2513423 (E.D. La. Aug. 25, 2006) (Fallon, J.).

3. Analysis

a. Pending State Court Suit

In their motion, Western and Safeco note the existence of a lawsuit in the 19th Judicial District Court, Parish of East Baton Rouge, State of Louisiana. There, S&P filed suit against St. Mary's, against the State of Louisiana through GOHSEP, and against others for actions that allegedly arise out of the same facts as the instant suit. Specifically, the moving Defendants argue that the instant federal suit and the state suit seek payment for construction work performed by S&P and its subcontractors, including Malone. On this basis, Western and Safeco argue that a stay is appropriate here. Additionally, they argue that GOHSEP controls the FEMA grant funds but is not a party here, such that "[w]hether GOHSEP is considered an 'indispensable' party or only merely 'necessary,' it makes much more sense to resolve these issues in a forum in which all parties with an interest may participate" and that "[t]hat forum is the state court, not this honorable Federal Court."

Rec. Doc. 12.

Id. The moving Defendants state, "Specifically, the suit filed in the 19th JDC seeks to force payment for the construction work, including the work performed by Malone, from either [St. Mary's] or GOHSEP." Id.

Rec. Doc. 9-2 at p. 4.

Id. at pp. 4-5.

Despite the moving Defendants arguments that it is best for "all parties" if the issue is resolved by one court, rather than two, as this Court has already noted, exceptional circumstances must be present before a court will stay a federal action on the basis of a pending state action. However, before the Court will even consider whether exceptional circumstances exist, the Court must first satisfy itself that the proceedings are parallel. Proceedings are parallel when they involve the same parties and the same claims.

Id. at p. 4.

Hartford Accident & Indem. Co. v. Costa Lines Cargo Servs., Inc., 903 F.2d 353, 360 (5th Cir. 1990).

Am. Guarantee & Liab. Ins. Co. v. ANCO Insulations, Inc., 408 F.3d 248, 251 (5th Cir. 2005).

Here, the parties to the two suits are disparate; GOHSEP and other parties who are included in the state suit, which is now pending elsewhere, are not present here. Furthermore, there exists a question of whether the two suits even involve the same claims. Even when a case "involve[s] the same underlying episode and entail[s] significant overlapping proof," it may concern "independent wrongs." The facts before this Court do not make it clear that the suits are, indeed, parallel. Given that a court's discretion is heavily weighted in favor of exercising jurisdiction, Western and Safeco have not met their heavy burden to demonstrate that a stay is warranted here. As to the movants' arguments regarding the absence of GOHSEP from this suit, such arguments cannot support a stay or dismissal on the basis of allegedly parallel litigation; if the movants wish to argue that this case cannot proceed without GOHSEP, there are other, more proper options available to them.

See Rec. Doc. 23 at p. 2.

Hartford, 903 F.2d at 360.

Additionally, Western and Safeco assert that the instant case should be stayed or dismissed on the basis of the state court suit because, they allege, Malone is bound by the outcome of the state court suit because of a purported clause contained within the dispute resolution procedures in the subcontract entered into between S&P and Malone. The Court will consider this argument within its consideration of the applicability of the subcontract's dispute resolution procedures.

b. Dispute Resolution Procedures in the Subcontract

The moving Defendants argue that under the terms of the subcontract, Malone is bound by any decision in litigation between St. Mary's and S&P and/or that any claims between Malone and S&P must be submitted to mediation/arbitration. In support of this argument, Western and Safeco point to the specific terms in the subcontract entered into between S&P and Malone. The moving Defendants argue that because Malone has not followed the dispute resolution procedures set forth in the subcontract, this action is premature, Malone will be bound by the state court action, and therefore this Court should dismiss or stay the present action, given that "[a] motion to dismiss should be granted where a matter is premature."

Rec. Doc. 9-2 at p. 3 (citing Kraft Food Ingredients Corp. v. PCI Int'l Consultants, Inc., No. 07-1842, 2008 WL 4001184 (W.D. La. Aug. 27, 2008)).

However, Western and Safeco have provided no reason why this Court should look to the terms of the subcontract here, given that Malone has not sued under it. Instead, as Malone correctly points out, it has only sued Western and Safeco under the Louisiana Private Works Act ("LPWA") and as provided for in the payment bond furnished by Western and Safeco, which includes its own dispute resolution provisions. Malone asserts that the Louisiana Private Works Act and the payment bond each have their own procedures, which Malone maintains that it has followed. This Court finds that it is at least arguable that the terms of the subcontract do not control here, therefore it is not obvious that Malone's alleged failure to follow the dispute resolution procedures contained in the subcontract makes this action premature. Accordingly, relief is not too speculative and is plausible on its face. Furthermore, the subcontract was not included within the pleadings, so consideration of that document would require this Court to convert this motion to one for summary judgment. The Court declines to do so.

Rec. Doc. 23 at p. 2.

Rec. Doc. 23 at p. 2.

c. Pay if Paid Clause

Finally, Western and Safeco assert that as sureties, they can assert any defenses that S&P would be entitled to assert. Specifically, they argue that the instant action is premature because of a "pay if paid" clause in the subcontract that allegedly "provides that payment is only due to Malone after S&P has been paid in full by [St. Mary's] for Malone's work."

Rec. Doc. 9-2 at p. 5.

Id. at p. 8.

Although sureties may generally assert the defenses that would be available to their principal, the Louisiana Supreme Court has specifically held that clauses requiring a contractor to pay its subcontractors only after the contractor has itself been paid "constitute[] terms relating to the time of payment." Such clauses do not constitute suspensive conditions, such that general contractors and their sureties will be held liable for full payment on the contract amounts due to subcontractors, even when the general contractor has not itself received payment. "To allow the surety to assert as a defense that the owner has not made payments on the contract would defeat the statutory purpose [of the payment bond scheme] . . . ." Therefore, in Louisiana, a surety is liable to a subcontractor even when the principal has not paid the general contractor, and the surety may not avoid this liability on the basis of a pay if paid clause.

Southern States Masonry, Inc. v. J.A. Jones Const. Co., 507 So.2d 198, 204 (La. 1987).

Id.; see also Pacific Lining Co. v. Algernon-Blair Constr. Co., 819 F.2d 602 (5th Cir. 1987).

Aesco Steel, Inc. v. J.A. Jones Constr. Co., 621 F.Supp. 1576, 1582 (E.D. La. 1985) (Schwartz, J.).

Id. at 603.

Ignoring the fact that St. Mary's has asserted that it did, indeed, pay S&P for Malone's work, movants' "pay if paid" argument fails as contrary to the clearly articulated law that holds that a surety does not escape liability because the contractor has not been paid. Thus, the purported "pay if paid" clause will not defeat Malone's payment bond claim, and this suit is not premature on the basis of any such clause.

See Rec. Doc. 12 at ¶¶ 34-36.

Because the Court has determined that Western and Safeco may not succeed on a "pay if paid" clause defense, the Court need not consider Malone's alternative arguments that there is no "pay if paid" clause applicable here because it is overridden by the subcontract's payment clause or because "a reading of the subcontract as a whole makes it clear that receipt of payment by S&P is not a condition precedent to S&P's obligation to pay Malone," nor must the Court consider converting the motion to dismiss to a motion for summary judgment to allow it to consider the subcontract that was not contained within the pleadings in this case.

See Rec. Doc. 23 at p. 2.

IV. Conclusion

Having determined that venue is proper in this District, and having determined that neither dismissal nor a stay is warranted on the basis of the state court suit, that Malone's alleged failure to follow the dispute resolution procedures contained in the subcontract do not make it implausible that this action is already mature, and that a "pay if paid" clause within the subcontract would not defeat Malone's claims against Western and Safeco,

IT IS HEREBY ORDERED that Western and Safeco's Motion to Dismiss, Alternatively to Stay Proceedings is DENIED.

Rec. Doc. 9.
--------

NEW ORLEANS, LOUISIANA, this 23rd day of May, 2012.

_________________

NANNETTE JOLIVETTE BROWN

UNITED STATES DISTRICT JUDGE


Summaries of

E. Cornell Malone Corp. v. Sisters of the Holy Family

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA SECTION: "G"(5)
May 23, 2012
CIVIL ACTION NO. 12-0361 (E.D. La. May. 23, 2012)

refusing to enforce clause “because the construction project is located within Louisiana ... against the public policy of Louisiana, under both the Louisiana statute and by application of [The Bremen ] regarding a forum selection clause in contravention of public policy”

Summary of this case from Bowen Eng'g, Corp. v. Pac. Indem. Co.
Case details for

E. Cornell Malone Corp. v. Sisters of the Holy Family

Case Details

Full title:E. CORNELL MALONE CORP. v. SISTERS OF THE HOLY FAMILY, ST. MARY'S ACADEMY…

Court:UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA SECTION: "G"(5)

Date published: May 23, 2012

Citations

CIVIL ACTION NO. 12-0361 (E.D. La. May. 23, 2012)

Citing Cases

WCC Cable, Inc. v. G4S Tech. LLC

Next, WCC cites two non-Seventh Circuit cases issued before Atlantic Marine. See Gem Mech. Servs., Inc. v. DV…

Bowen Eng'g, Corp. v. Pac. Indem. Co.

Other courts have reached different conclusions, but generally without extended discussion. See Gem…