From Casetext: Smarter Legal Research

Cincinnati Gas Elec. Co. v. Fed. Power Com'n

United States Court of Appeals, Sixth Circuit
Apr 28, 1967
376 F.2d 506 (6th Cir. 1967)

Opinion

No. 17228.

April 28, 1967.

Walter E. Beckjord, Cincinnati, Ohio (Douglas M. Mansfield, Peck, Shaffer Williams, Cincinnati, Ohio, on the brief), for petitioners.

Israel Convisser, F.P.C., Washington, D.C. (Richard A. Solomon, Gen Counsel, Howard E. Wahrenbrock, Sol., Drexel D. Journey, Ernest Liebman, Attys., F.P.C., Washington, D.C., on the brief), for respondent.

Before WEICK, Chief Judge, PECK, Circuit Judge, and CECIL, Senior Circuit Judge.


This proceeding is to review an order of Federal Power Commission, made under the authority of Section 201 of the Federal Power Act requiring the petitioners, The Cincinnati Gas Electric Company (CGE) and its affiliate, The Union Light, Heat and Power Company, to file and maintain on file with the Commission rate schedules covering their wholesale sales.

Petitioners admitted that three of CGE's wholesale customers received out of state energy, but contended that evidence does not support the holding that eight others received such energy.

The petitioners resisted jurisdiction of the Commission to make the order, claiming that, within the meaning of the Act, their wholesale sales did not involve the delivery to their customers of electrical energy generated out of the state, and in any event the sales were made from local distribution facilities and were therefore exempt under Section 201(b) of the Act.

A hearing was held before the Presiding Examiner of the Commission and evidence, including expert testimony, was offered by both the Commission and the petitioners.

The hearing consumed about fifteen days and the case was submitted to the Presiding Examiner on the evidence, oral arguments and briefs. The Presiding Examiner gave careful consideration to the case and handed down his Initial Decision, in which he adopted findings of fact and conclusions of law. His decision appears in twenty-nine pages of the record.

The Presiding Examiner found as a fact:

"(10) At times each of the wholesale customers named above in (4) and (5) receives out-of-state electric energy from the multi-state power network of which the Cincinnati system is a part, such energy having been commingled with the Cincinnati system energy.

"(11) The integrated and coordinated Cincinnati interstate electric system and the systems with which it is interconnected and operating in synchronism form an integrated and operating power pool, and the sales of electric energy by the Cincinnati system to its wholesale customers named above in (4) and (5) are pool sales and by reason of the interstate nature of the pool are sales in interstate commerce."

He also found that the facilities from which the energy is delivered to CGE's wholesale customers, were at least in part constructed and used to sell and interchange energy with other companies and are not used solely in local distribution. He further held that interstate wholesale sales are not exempt from jurisdiction of the Commission.

The Commission adopted the Presiding Examiner's Initial Decision in all material respects and ordered the filing of the rates.

It was conceded by petitioners that they are public utilities within the meaning of the Act.

CGE and its wholly owned subsidiaries are a part of a coordinated and interconnected electric system serving a highly industrialized area of 2600 square miles in nine counties in southwestern Ohio, five counties in northern Kentucky, and one county in eastern Indiana. CGE owns and operates three electric generating stations which are interconnected by transmission lines through Ohio and Kentucky. The system is connected with eight other utility companies in Ohio, Indiana and Kentucky. These other companies in turn are connected with other utilities which constitute the American Electric Power System.

All of these companies are part of the Interconnected Systems Group consisting of one hundred forty utility systems, in thirty-two states. The System forms a pool of multi-state energy which supplies the load of CGE in synchronism with the other connected utilities. CGE thus utilizes out of state energy as well as energy generated by it, to fulfill its requirements. In turn, energy generated by CGE flows through the system, out of the state, and is used by other utilities.

In 1963 CGE system received 11% of its total net generation from out of state, of which 9% was from Indiana sources.

Staff witness Miller testified that each of the wholesale customers in question received out of state energy commingled with Ohio energy. Staff witness Dr. Jessel testified that in an interconnected pool operation, interstate energy was delivered to each of CGE's wholesale customers.

Petitioners' claim was that the evidence was not sufficient to identify out of state energy as being delivered to the wholesale customers; that all units of electricity are identical and it is impossible to identify one unit from another; that the burden was upon the Commission to show the actual source of the specific units delivered to the wholesale customers, and it was scientifically impossible to do so.

There can be no question but that interstate as well as intrastate generated electricity was commingled and was flowing through the CGE system. This is enough to sustain the Commission's jurisdiction.

It would indeed be impossible to prove the source of electrical current supplied from a pool. It was not necessary for the Commission to do so.

As well stated by the Court in Pennsylvania Water Power Co. v. F.P.C., 89 U.S.App.D.C. 235, 193 F.2d 230, at 241 (1951) aff'd 343 U.S. 414, 72 S.Ct. 843, 96 L.Ed. 1042 (1952):

"Each sale is in effect a pool sale drawn from the integrated system and hence interstate in nature."

See also United States v. Public Util. Comm'n of Cal., 345 U.S. 295, 73 S.Ct. 706, 97 L.Ed. 1020 (1953).

Other Appellate Courts have rejected similar contentions. Indiana Mich. Elec. Co. v. F.P.C., 365 F.2d 180 (7th Cir. 1966), cert. denied 385 U.S. 972, 87 S.Ct. 509, (1966); Public Service Co. of Ind., Inc. v. F.P.C., 375 F.2d 100 (7th Cir. 1967); Arkansas Power Light Co. v. F.P.C., 368 F.2d 376 (8th Cir. 1966).

We are satisfied that the distribution facilities of CGE were not used solely in intrastate distribution and that the exemption was not available to it with respect to its wholesale sales. Indiana Mich. Elec. Co. v. F.P.C., supra; Wisconsin-Mich. Power Co. v. F.P.C., 197 F.2d 472 (7th Cir. 1952) cert. denied 345 U.S. 934, 73 S.Ct. 794, 97 L. Ed. 1362 (1953).

In our opinion, the findings of fact of the Commission are supported by substantial evidence and are binding on us.

Affirmed.


Summaries of

Cincinnati Gas Elec. Co. v. Fed. Power Com'n

United States Court of Appeals, Sixth Circuit
Apr 28, 1967
376 F.2d 506 (6th Cir. 1967)
Case details for

Cincinnati Gas Elec. Co. v. Fed. Power Com'n

Case Details

Full title:The CINCINNATI GAS ELECTRIC COMPANY and the Union Light, Heat and Power…

Court:United States Court of Appeals, Sixth Circuit

Date published: Apr 28, 1967

Citations

376 F.2d 506 (6th Cir. 1967)

Citing Cases

Youghiogheny and Ohio Coal Company v. Morton

Safety Act of 1941, 55 Stat. 177, 30 U.S.C. § 451 et seq. (repealed by 83 Stat. 803, December 30, 1969, and…

Town of Concord, Mass. v. Boston Edison Co.

One legal consequence of these interconnections and pooling arrangements is that most electricity flows…