From Casetext: Smarter Legal Research

Bennington Foods v. Croix Renaissance

United States Court of Appeals, Third Circuit
Jun 9, 2008
528 F.3d 176 (3d Cir. 2008)

Summary

affirming district court's rejection of claim for harm to reputation and holding that plaintiff's "inability to gain possession of the scrap metal at issue here creates at most a monetary loss."

Summary of this case from Metal v. Okapi Consultants, LLC

Opinion

Nos. 07-2254, 07-2313.

Argued on December 10, 2007.

Opinion Filed: June 9, 2008.

Appeal from the District Court of the Virgin Islands, Raymond L. Finch, Chief Judge.

Kimberly L. Boldt, Esquire, (Argued), Alters, Boldt, Brown, Rash Culmo, Boca Raton, FL, for Appellee, Bennington Foods, LLC, d/b/a Bennington Group.

Joseph P. Klock, Jr. Esquire, (Argued), JuanCarlos Antorcha, Esquire, Epstein, Becker Green, Miami, FL, Joel H. Holt, Esquire, Christiansted, St. Croix USVI, for Appellant, St. Croix Renaissance Group, Inc.

Kenneth A. Novikoff, Esquire, Rivkin Radler, LLP, Christiansted, St. Croix USVI, Warren B. Cole, Esquire, Hunter, Cole Bennett, Christiansted, St. Croix USVI, for Appellant, Montrose Global Assets, Inc.

Before: SMITH, NYGAARD and ROTH, Circuit Judges.


OPINION


St. Croix Renaissance Group, LLP (SCRG), appeals the imposition of a preliminary injunction that would allow Bennington Foods, L.L.C., to remove scrap metal from SCRG's property. SCRG is challenging the District Court's findings under both the likelihood of success prong and the irreparable harm prong of the preliminary injunction test.

We conclude that this injunction should be vacated because the District Court erred in finding that failure to grant the injunction would cause irreparable harm.

I. BACKGROUND

This case arose out of the planned dismantling of an aluminum processing plant on St. Croix, U.S. Virgin Islands. The plant is on property owned by SCRG. Montrose Global Assets, Inc., entered into an agreement with SCRG to find a company to remove the plant structure from the property. Montrose contracted with Bennington Group to remove the metals from the dismantled structure at a set price. SCRG, Montrose, Bennington, and Bradford Welding Truck Equipment, Inc., then entered into the Dismantling Contract that apportioned responsibility for the various tasks that needed to be done in order for the dismantling to take place. In the clauses that are relevant to this litigation, SCRG was required to obtain the necessary permits for the demolition to take place, and Bennington was required to comply with local laws.

Bennington does business under a registered, fictitious name as Bennington Group, LLC.

SCRG applied for a Major Coastal Zone Management (CZM) Permit on March 7, 2006. Before SCRG obtained a permit, it requested that Bennington begin pre-demolition work, without verifying that such work could be performed without a permit. SCRG believed that Bennington could harvest the scrap metal on the ground without a permit. Bennington's contractors began this work on April 2, 2006.

On April 26, 2006, the Department of Building Permits informed SCRG that permits, in fact, were needed to perform the pre-demolition activities. SCRG verbally instructed Bennington to stop working. Bennington and its contractors complied for about three weeks. They then resumed working, notwithstanding SCRG's directive. The Department of Planning and Natural Resources (DPNR) Division of Permits issued a Stop Work Order on June 12, 2006. On June 15, the St. Croix Committee of the Virgin Islands CZM Commission issued a Cease and Desist order. After a hearing before DPNR, the CZM Commission issued Notices of Violation and Assessment of Civil Penalties to SCRG, Bennington, and Bennington's subcontractors.

Meanwhile, just after the Stop Work Order was issued on June 13, Montrose determined that Bennington had never provided any proof of insurance as required by the Demolition Contract and that Bennington had defaulted on the contract by failing to abide by the laws of the U.S. Virgin Islands "governing demolition and removal of structures, waste disposal and/or environmental protections" as required by the contract. On June 19, SCRG forcibly evicted Bennington's contractors from the property.

Prior to June 19, Bennington had completed preparations to remove and ship approximately 30,000 tons of scrap metal and 50 tons of copper. These metals are the subject of the instant injunction.

Bennington initiated an arbitration proceeding against SCRG in New York on June 28, 2006, pursuant to the Sales Contract. SCRG responded by filing, in the Circuit Court of the Eleventh Judicial Circuit in and for Miami-Dade County, Florida, a Complaint/Application To Stay Demand For Arbitration. On September 26, the Florida circuit court judge issued an order granting SCRG's application, finding that neither Bennington nor SCRG was bound by the arbitration clause in the Sales Contract because they were not parties to that contract.

On November 22, 2006, Bennington filed a complaint for damages in the District Court for the Virgin Islands. Bennington then sought a preliminary injunction, allowing it to remove the scrap metal and copper that had already been prepared for removal. The injunction was granted after Bennington amended its complaint to seek equitable relief as well as money damages. SCRG appealed.

We have jurisdiction over this appeal pursuant to 28 U.S.C. § 1291(a)(1). We review an order granting a preliminary injunction for abuse of discretion, the factual findings for clear error, and the determinations of questions of law de novo. See NutraSweet Co. v. Vit-Mar Enterprises, Inc., 176 F.3d 151, 153 (3d Cir. 1999).

II. DISCUSSION

The District Court found that failing to issue a mandatory injunction would cause irreparable harm to Bennington. Specifically, it found that failure to issue the injunction would harm Bennington's reputation for being able to deliver scrap metal on time. However, a plaintiff in a breach of contract case cannot convert monetary harm into irreparable harm simply by claiming that the breach of contract has prevented it from performing contracts with others and that this subsequent failure to perform will harm the plaintiff's reputation. See Frank's GMC Truck Center, Inc. v. General Motors Corp., 847 F.2d 100, 102 (3rd Cir. 1989) ("[t]he availability of adequate monetary damages belies a claim of irreparable injury"), In re Arthur Treacher's Franchisee Litigation, 689 F.2d 1137, 1145 (3rd Cir. 1982) ("we have never upheld an injunction where the claimed injury constituted a loss of money, a loss capable of recoupment in a proper action at law").

The inability to gain possession of the scrap metal at issue here creates at most a monetary loss. In the event that subsequent failure to deliver scrap metal to others might create a cognizable risk of irreparable harm to the plaintiffs reputation, Bennington has not demonstrated, except by Bennington's president's personal assertions, that the scrap metal business is different from other types of commerce in such a way that normal breach of contract remedies could not provide a remedy. Nor has Bennington identified any contracts to resell the scrap metal which it has been unable to perform, any third parties with whom it has suffered a loss of reputation, or any attempts — futile or otherwise — it has made to fulfill contracts to deliver scrap metal by obtaining it from other sources.

In order to obtain a preliminary injunction we have repeatedly held that the moving party must demonstrate "(1) the reasonable probability of eventual success in the litigation and (2) that the movant will be irreparably injured pendent lite if relief is not granted. Moreover, while the burden rests upon the moving party to make these two requisite showings, the district court `should take into account, when they are relevant, (3) the possibility of harm to other interested persons from the grant or denial of the injunction, and (4) the public interest.'" Instant Air Freight Co. v. C.F. Air Freight, Inc., 882 F.2d 797, 800 (3rd Cir. 1989). Moreover, where the relief ordered by the preliminary injunction is mandatory and will alter the status quo, the party seeking the injunction must meet a higher standard of showing irreparable harm in the absence of an injunction. Tom Doherty Associates, Inc. v. Saban Entertainment, Inc., 60 F.3d 27, 33-34 (2nd Cir. 1995).

As we find that Bennington has not met this heightened standard and that there is no possibility of irreparable harm on the record before us, there is no need to analyze the other prongs of the test.

Bennington argues, however, that it has a reputation for delivering scrap metal on time and that this reputation will be irreparably harmed if it is not allowed to remove the scrap metal at issue here. In particular, Bennington claims that its dealings with its suppliers in India are particularly dependent on its reputation. The District Court concluded that this represented an irreparable harm analogous to those faced by the plaintiffs in Pappan Enterprises, Inc. v. Hardee's Food Systems, Inc., 143 F.3d 800 (3d Cir. 1998) and Fitzgerald v. Mountain Laurel Racing, Inc., 607 F.2d 589 (3d Cir. 1979). However, neither of those cases is applicable here.

In Pappan, the defendant was enjoined from the continued use of trademarks owned by the plaintiff, 143 F.3d at 803, while in Fitzgerald the defendant racetrack operator was enjoined from suspending the plaintiff trainer and harness racer for allegedly throwing races, 607 F.2d at 593. In both of those cases the reputation of the plaintiff was directly endangered by the defendant's actions — the misleading use of trademarks and a suspension based on suspicion of cheating can, in and of themselves, harm plaintiffs' reputations.

In contrast, any damage to Bennington's reputation will result only indirectly from SCRG's actions. SCRG is not doing anything (or refraining from doing anything) that will directly harm Bennington's reputation with its suppliers in India. Rather, the claim is a two-step one: (1) because SCRG is not delivering (allegedly breaching the contract), Bennington is unable to deliver, and (2) lack of delivery harms Bennington's reputation with third parties with whom Bennington has contracted to resell the scrap. There is nothing in this case to distinguish it from a myriad of other breach of contract cases. Thus, there is no reason to make the extended causal inferences necessary to find irreparable harm to reputation. Any damage Bennington may suffer as a result of SCRG's alleged breach of contract — to the extent it is not speculative — can be proven as an element of the breach of contract claim against SCRG.

Bennington, however, cites to Blackwelder Furniture co. of Statesville, Inc. v. Seilig Manufacturing Co., Inc., 550 F.2d 189, 197 (4th Cir. 1977), a case in which the trial court denied a preliminary injunction. The Fourth Circuit Court of Appeals reversed, holding that the district court's finding of no irreparable harm was clearly erroneous. Id. at 196. In so concluding, the court stated that

The harm posed to Blackwelder's general goodwill by its inability to fill outstanding and accumulating orders in excess of $15,000 for furniture listed in its catalogues is incalculable not incalculably great or small, just incalculable.

Id. at 197.

We are not bound by the holding in Blackwelder and we question whether irreparable harm was sufficiently demonstrated there. In addition, we note that Blackwelder has been distinguished from other preliminary injunction cases on the basis that Blackwelder "involved a manufacturer's refusal to supply its entire product line to a particular retailer, treatment which discriminated against that particular dealer." Advisory Information and Management Systems, Inc. v. Prime Computer, Inc., 598 F.Supp. 76, 78 (M.D.Tenn. 1984). See also Jack Kahn Music Co., Inc. v. Baldwin Piano Organ Co., 604 F.2d 755, 762 (2d Cir. 1979). As we mention above, there is nothing in the record before us to demonstrate that Bennington was unable to fulfill any contracts, was unable to find other sources of scrap metal when the Virgin Islands scrap metal could not be shipped, or lost reputation with any specific customers.

III. CONCLUSION

For the foregoing reasons, we will vacate the preliminary injunction and remand this case to the District Court for further proceedings consistent with this opinion.


Summaries of

Bennington Foods v. Croix Renaissance

United States Court of Appeals, Third Circuit
Jun 9, 2008
528 F.3d 176 (3d Cir. 2008)

affirming district court's rejection of claim for harm to reputation and holding that plaintiff's "inability to gain possession of the scrap metal at issue here creates at most a monetary loss."

Summary of this case from Metal v. Okapi Consultants, LLC

reversing the district court's grant of a preliminary injunction after the district court found that plaintiff would suffer an irreparable harm to his reputation for being able to timely deliver products absent a preliminary injunction

Summary of this case from Mha, LLC v. Siemens Healthcare Diagnostics, Inc.

refusing to grant mandatory relief without more than typical proof of irreparable harm

Summary of this case from Victory v. Berks Cnty.

noting plaintiff's seeking a preliminary injunction that "alter the status quo" must "meet a higher standard of showing irreparable harm"

Summary of this case from Johnson v. Farm Journal, Inc.

explaining that when a court confronts a typical breach of contract claim with no causal inferences necessary to find irreparable harm to reputation, any harm a party may suffer can remedied with traditional breach of contract damages

Summary of this case from Crowdstrike, Inc. v. NSS Labs. Inc.

In Bennington Foods, the plaintiff argued "that it has a reputation for delivering scrap metal on time and that this reputation will be irreparably harmed if it is not allowed to remove the scrap metal at issue here."

Summary of this case from URL Pharma, Inc. v. Reckitt Benckiser Inc.

discussing Pappan Enterprises, Inc. v. Hardee's Food Systems, Inc., 43 F.3d 800 (3d Cir. 1998) and Fitzgerald v. Mountain Laurel Racing, Inc., 607 F.2d 589 (3d Cir. 1979)

Summary of this case from Mha, LLC v. Siemens Healthcare Diagnostics, Inc.

requiring balancing of the harms created by an injunction and that will ensue in its absence

Summary of this case from EDWARD G. RAHLL SONS, INC. v. ZACH

requiring consideration of the public interest prior to issuance of an injunction

Summary of this case from EDWARD G. RAHLL SONS, INC. v. ZACH

stating that a court must consider existence of irreparable harm when determining whether to issue an injunction

Summary of this case from EDWARD G. RAHLL SONS, INC. v. ZACH
Case details for

Bennington Foods v. Croix Renaissance

Case Details

Full title:BENNINGTON FOODS LLC, d/b/a Bennington Group v. ST. CROIX RENAISSANCE…

Court:United States Court of Appeals, Third Circuit

Date published: Jun 9, 2008

Citations

528 F.3d 176 (3d Cir. 2008)

Citing Cases

URL Pharma, Inc. v. Reckitt Benckiser Inc.

In light of the fact that a mandatory injunction "will alter the status quo, the party seeking the injunction…

Healthcare Corp. of Am. v. Data RX Mgmt., Inc.

"[A] plaintiff in a breach of contract case cannot convert monetary harm into irreparable harm simply by…