FINDINGS OF FACT AND CONCLUSIONS OF LAW

This case concerns a contract dispute between plaintiff AGK Sierra de Montserrat, L.P. (“AGK”) and defendant Comerica Bank (“Comerica”). Plaintiff AGK contends that defendant Comerica breached their contract by refusing to indemnify AGK against losses it incurred in connection with AGK's purchase of a residential development from Comerica.

A six-day bench trial in this case commenced on May 25, 2022. (Doc. No. 92). At trial, the court heard from seven witnesses and admitted 85 exhibits into evidence. (Doc. No. 97.) The witnesses who were sworn and testified at trial included: Nader Pakfar (an attorney who represented AGK in the underlying real estate transaction with Comerica, appearing by Zoom videoconference), Alvin Galstian (an attorney who represented AGK in the underlying real estate transaction with Comerica, appearing by Zoom videoconference), Don Murphy (the founder of Kinetic Homes Limited Partnership, one of the two entities comprising AGK), Louis Friedel (a member representative for Angelo Gordon Real Estate, Inc., the second of the two entities comprising AGK), Timothy Gorry (counsel for plaintiff), Keith Maruska (an officer in Comerica's Special Assets department), and Francis Ferrer (the Vice President of Corporate Counsel at Comerica). Following the bench trial, the court directed the parties to submit post-trial briefs and proposed findings of fact and conclusions of law, which the parties filed on July 29, 2022 and August 18, 2022. (Doc. Nos. 110, 111, 113, 116).

On July 29, 2022, when attempting to file its post-trial brief, Comerica mistakenly filed a different document with the court. (See Doc. Nos. 112, 117). As a result of this error, Comerica did not file its post-trial brief until August 18, 2022. (Doc. No. 116.) However, Comerica successfully filed its proposed findings of fact and conclusions of law on July 29, 2022. (Doc. No. 113.)

Having considered the testimonial evidence and exhibits admitted at trial, the parties' arguments, and the applicable law, the court sets forth the following findings of fact and conclusions of law pursuant to Federal Rule of Civil Procedure 52(a).

FINDINGS OF FACT

A. The Parties

Plaintiff AGK is a partnership formed by Angelo Gordon Real Estate, Inc. (“AGRE”), a large real estate investment trust, and Kinetic Homes Limited Partnership (“Kinetic Homes”), a company that partnered with professional investment firms to acquire and sell real estate properties. (Doc. Nos. 100 at 105:10-17; 101 at 168:2-169:10.) AGK was formed for the sole purpose of purchasing and developing the residential property underlying this action. (Doc. Nos. 103 at 47:1-4; 84 at 3.) Defendant Comerica is a bank incorporated in the state of Texas. (Doc. No. 100 at 112:7-14.)

B. Development and Foreclosure of Sierra de Montserrat

In 2005, Westwood Montserrat, Ltd. (“Westwood”), a limited partnership owned by Curtis Westwood (“Mr. Westwood”), began developing a residential subdivision in Loomis, California, commonly known as Sierra de Montserrat. (Doc. No. 84 at 2; JX-118 at 25.) As the developer, Westwood recorded a Declaration of Covenants, Conditions, and Restrictions for Sierra de Montserrat (the “CC&Rs”). (Doc. No. 84 at 2; see also JX-118 at 25-100). Pursuant to those CC&Rs, Westwood possessed certain rights as the “declarant” of Sierra de Montserrat.(Doc. No. 84 at 2; see also JX-118 at 27.) In order to develop Sierra de Montserrat, Westwood obtained a loan from defendant Comerica, which was secured by a deed of trust that, inter alia, assigned to Comerica certain rights in Sierra de Montserrat in the event of Westwood's default. (Doc. No. 84 at 2.)

The CC&Rs provide that “[t]he ‘Declarant' means Westwood Montserrat, Ltd., and its successors and assigns, if such successors or assigns should acquire five or more undeveloped Lots from Declarant for the purpose of development and sale and be designated as a successor Declarant in a recorded instrument.” (JX-118 at 27.)

Around the time of the 2008 financial crisis, Westwood defaulted on its loan to Comerica. (See Doc. No. 84 at 2.) Subsequently, Comerica initiated a nonjudicial foreclosure of most of the Sierra de Montserrat lots. (Id.) On October 27, 2009, a few days before the foreclosure sale, Westwood recorded a document titled Supplemental Declaration Regarding Construction Obligation and Memorandum of Repurchase Right (the “Supplemental Declaration”) with the Placer County Recorder. (See JX-37 at 1-3.) The Supplemental Declaration purported to impose additional construction requirements on the lots at Sierra de Montserrat and to give Westwood additional rights as declarant, including the right to repurchase certain lots at Sierra de Montserrat. (Id. at 2.)

On November 6, 2009, Comerica acquired 51 lots in Sierra de Montserrat through a nonjudicial foreclosure sale. (Doc. No. 84 at 2.) That day, Comerica recorded a trust deed pursuant to the sale, which provided that Comerica received those 51 lots as well as certain rights related to those lots, including

[a]ll present and future right [sic], title and interest . . . in and to all accounts, general intangibles . . . interest and documents . . . and all other agreements, obligations, rights and written materials . . . relating to or otherwise arising in connection with or derived from the Property . . . .
(JX-120 at 1, 3.)

Thereafter, Comerica sought to sell the Sierra de Montserrat lots through a team within its Special Assets Group, called the “Other Real Estate” team. (Doc. No. 104 at 53:3-19, 59:24-60:8.) Keith Maruska, a manager in Comerica's California Other Real Estate Department, was one of the main individuals at Comerica who was responsible for the marketing and sale of the lots. (Doc. Nos. 84 at 2; 104 at 54:1-9, 59:24-60:12.) At trial, Mr. Maruska testified that it was Comerica's practice to “dispose of these bank-owned properties as quickly as possible” due to the risk of “something happening at the property that could potentially bring liability to the bank” and the cost of maintaining ownership over distressed property. (Doc. No. 104 at 59:13-23.) Consistent with that practice, Mr. Maruska began the process of procuring a broker shortly after the foreclosure sale, and with the approval of his superiors at Comerica, selected Steve Chamberlain of Colliers International to serve as the broker for the Sierra de Montserrat sale process. (Id. at 60:2-14; see also Doc. No. 84 at 3.)

C. Comerica's Sale of Sierra de Montserrat to AGK

On March 19, 2010, Don Murphy, the president of Kinetic Homes, sent a letter of intent to Mr. Chamberlain, expressing his intent to purchase the bank-owned lots at Sierra de Montserrat on behalf of AGRE and Kinetic Homes. (JX-21 at 1.) The letter proposed a purchase price of $8,050,000. (Id. at 2.) Over the coming weeks and months, the parties negotiated for the sale of the 51 lots, with Keith Maruska serving as the primary point of contact for Comerica and Don Murphy serving as the primary point of contact for AGRE and Kinetic Homes. (Doc. Nos. 84 at 2; 104 at 63:12-14; 101 at 176:14-17.) In addition, Francis Ferrer, in-house counsel for Comerica, served as Comerica's legal point of contact on the transaction, and attorneys Nader Pakfar and Alvin Galstian served as counsel for AGRE (later, AGK) in connection with the transaction. (Doc. Nos. 84 at 3; 100 at 105:14-16.) As noted above, Mr. Chamberlain acted as Comerica's real estate agent for the sale of the Sierra de Montserrat lots. (Id.)

Prior to founding Kinetic Homes, Mr. Murphy was the president of Shea Homes in Sacramento, California. (Doc. No. 101 at 167:12-16.) His business plan for Kinetic Homes was to “acquire land, . . . build[] up a land portfolio,” and either sell property throughout the distressed economic period as the market improved, or eventually build homes. (Id. at 168:18-24.) Mr. Murphy planned to fund his ventures using “outside capital” from “professional investment firms.” (Id. at 159:5-6.) Through his work at Shea Homes, Mr. Murphy had a prior relationship with AGRE, which led to their partnership in purchasing Sierra de Montserrat lots from Comerica. (Id. at 169:6-10.) It was understood among AGRE and Kinetic Homes that AGRE would serve as the “money partner” for the transaction, whereas Mr. Murphy on behalf of Kinetic Homes would “tak[e] the lead in the [Purchase and Sale Agreement] negotiations and the business points,” which would in turn need to be “fully approved” by AGRE. (Id. at 177:8-10, 177:18-178:25.) As explained further below, these parties formally formed AGK in order to purchase and develop the 51 lots at Sierra de Montserrat. (See Doc. No. 103 at 47:1-4; 84 at 3.) At trial, Mr. Murphy testified that he “believe[d] the structure was [AGRE] had 95 percent [equity ownership], . . . another Angelo Gordon entity . . . had one percent, and then [Mr. Murphy] was a two percent equity partner.” (Doc. No. 101 at 178:11-14.) Pursuant to this structure, Mr. Murphy was “responsible for day-to-day management of really every type, . . . but then [he] would report back to [AGRE] for approval on any matters of substance.” (Id. at 178:15-19.) Thus, Mr. Murphy was effectively AGK's “boots on the ground” in the transaction, whereas AGRE served as AGK's money partner. (See id.)

1. Purchase and Sale Agreement

On May 17, 2010, AGRE and Comerica entered into a purchase and sale agreement (“PSA”) regarding the 51 lots at Sierra de Montserrat. (JX-27.) The PSA provided for a deposit of $450,000 and a purchase price of $8,200,000, set a thirty-day due diligence period prior to closing, and stated that “[t]he Property is being purchased and sold “AS IS” and “WHERE IS,” with all faults.” (JX-27 at 1, 7, 13.) The second page of the PSA contains a handwritten interlineation, initialed by Keith Maruska, appointing Arah Tresler from First American Title Company (“FATCO”) as the escrow agent for the deal. (See JX-27 at 2; Doc. No. 105 at 25:1926:23.) At trial, Mr. Maruska testified that the PSA was drafted using a Comerica template document, that FATCO was Comerica's preferred escrow vendor, and that the handwritten addition of Arah Tresler at FATCO as the escrow agent was made at Comerica's request. (Doc. No. 105 at 24:10-26:23.)

At trial, Mr. Maruska testified that in accordance with Comerica's preference for “finality” in transactions-in other words, selling properties without any contingent liability following the sale-it was Comerica's intent to sell the property “as is, where is” with “no representations or warranties.” (Doc. Nos. 104 at 56:18-57:6, 74:10-17; 105 at 34:17-18.)

During the subsequent due diligence period, AGK identified several potential issues with the sale of Sierra de Montserrat. In particular, AGK raised concerns regarding the possibility that Westwood remained the declarant of Sierra de Montserrat, notwithstanding the foreclosure sale and subsequent trust deed. (See Doc. No. 100 at 127:5-128:13.) The declarant of Sierra de Montserrat wields significant control over the development, through control of the homeowners' association (“HOA”), the HOA board, and the design review committee (“DRC”). (See JX-39 at 1-2.) AGK believed that having control over Sierra de Montserrat was a critical issue because without control over the development, it would be difficult to obtain the requisite approvals to improve lots or modify existing homes, and in turn, “relatively high-net-worth” and “sophisticated” parties would be reluctant to buy into the development. (See Doc. Nos. 102 at 126:15-21; 101 at 17:4-9.) AGK's concern that Westwood retained the status of declarant was exacerbated by AGK's diligence research indicating that Mr. Westwood himself was “very unhappy with the foreclosure,” that Sierra de Montserrat was Mr. Westwood's “personal pet project that he was planning for his retirement,” and that Mr. Westwood had a reputation among the “greater development community” for being quite litigious. (See id. at 124:4-8; Doc No. 101 at 185:10-16); (see also Doc. No. 102 at 127:3-5) (attorney Galstian testifying that “[w]hat I recall at this time was hearing that Mr. Westwood was a fighter, you know, was an aggressive person, and that he was not afraid to litigate”). Moreover, AGK learned through its due diligence that Westwood had sued Comerica alleging fraud and that such litigation was still ongoing at that time. (Doc. No. 104 at 129:10-22; JX-66 at 2.) Based on this information, AGK feared that the risk of litigation with Mr. Westwood over control of Sierra de Montserrat “was substantially high” and that “Mr. Westwood was not going to go down without a fight.” (Doc. No. 100 at 124:12-14.)

At trial, Mr. Maruska testified that he “definitely did not volunteer [the] information” about Comerica's lawsuit with Mr. Westwood; rather, AGK learned of the existence of such a lawsuit on its own through due diligence research. (Doc. No. 104 at 129:10-22, 132:12-24.) Similarly, Mr. Maruska testified that Comerica had “strong concerns” about whether it held the declarant rights to Sierra de Montserrat, but did not disclose its concerns-or its knowledge of the Supplemental Declaration-to AGK. (Id. at 132:23-133:25.)

As early as May 21, 2010, Mr. Chamberlain emailed Mr. Maruska and Mr. Murphy to schedule a call between the parties and an HOA expert who had been recommended by Comerica. (JX-28 at 2-3; Doc. No. 100 at 128:1-29:14.) On that call, the parties discussed whether, under the CC&Rs, Comerica's foreclosure had allowed it to successfully assume the declarant role, or whether there was an open question as to who was the declarant because there was not a specific assignment of those declarant rights from Westwood to Comerica in the sale or trust deed. (Doc. No. 100 at 129:18-22.) Similarly, AGK consulted with HOA experts of their own choosing as well as HOA experts from FATCO to discuss the declarant issue. (Doc. No. 100 at 128:1-6, 132:19-133:4; JX-29; JX-31 at 2-3.) On June 1, 2010, Mr. Murphy summarized his call with the FATCO experts in an email to Mr. Maruska, stating that FATCO's “experts confirmed our read that there are challenges in gaining control of the HOA, the Architectural Committee, and the Board.” (JX-32 at 1.)

On June 2, 2010, attorney Pakfar sent an email to Mr. Murphy, attorney Galstian, and Louis Friedel, a representative for AGRE, summarizing the CC&R issues relating to the transaction:

In sum, there are significant concerns as to whether Comerica, or AGK as successor, have sufficient rights as “Declarant” under the CC&Rs or control over the Design Review Committee (“DRC”). As you know, the title of Declarant is typically passed along by way of a recorded “Assignment of Declarant Rights,” which did not occur in this instance given the foreclosure. Alternatively, there may be foreclosing lender provisions in the CC&Rs themselves that automatically transfer Declarant rights upon foreclosure, but those provisions are not present in these CC&Rs. Accordingly, there is a debate as to who is the Declarant under the CC&Rs. The “experts” we consulted . . . had a variety of opinions, but the majority opinion was that Westwood could have a reasonable claim to be the Declarant, either as to the entire property or just the Lots over which [Westwood] retained ownership.
A disagreement as to the identity of the Declarant has a myriad of ancillary effects. For example, . . . . Westwood has already made claims as to his retention of some level of control, whether of the DRC or otherwise . . . and any buyer would need to have certainty as to its status as Declarant prior to effectively being able to operate and manage the property.
Finally, in any case, [Mr.] Westwood has apparently taken the clever step of assigning himself a certain number of lots [through the Supplemental Declaration]. Accordingly, even if he were to relinquish (or be deemed to relinquish) his status as Declarant, he would still be able to hold the project hostage by virtue of voting provisions. . . . Accordingly, even under the assumption you could successfully become the “Declarant,” you would still need to obtain [Mr.] Westwood's consent to take certain major actions, which given his demeanor and stated hostility would not be a favorable position to you. . . .
The most efficient way to clarify matters is to deal directly with Westwood. Alternatively, there may be ways to mitigate the risk by doing additional research and attempting to draft around our concerns, but ultimately these steps can not [sic] fully protect you against the time/costs of fighting Westwood . . . .
(JX-33 at 2-3.) Mr. Murphy forwarded this email to Mr. Chamberlain, who in turn forwarded the email to Mr. Maruska. (See JX-33 at 1.) In addition, Mr. Maruska forwarded the email internally to senior leadership at Comerica, with the description, “Summary of why Sierra de Montserrat sale maybe [sic] falling apart. . . . lets [sic] review and see if we think this is true/accurate . . . .” (JX-66 at 3.) In response, Nancy Kordoban, a senior vice president group manager within the Special Assets Group, wrote, “Can we not sue Westwood requesting relief from the court? If the analysis [from attorney Pakfar] is correct, and the CC&R's do not contain language transferring Declarant rights upon foreclosure I don't see any other way around this.” (JX-66 at 2; see also JX-65; Doc. No. 104 at 61:2-4.) After being informed by senior leadership that Westwood “has sued us claiming ‘Fraud'” and is “[s]eeking declaratory relief so [Westwood] may ascertain its rights and duties . . .,” Ms. Kordoban responded that “[i]t seems that any savvy buyer is going to figure this out unless the info below is wrong.” (JX-66 at 1-2; see also JX-65; Doc. No. 104 at 61:5-8.) In another email, Ms. Kordoban wrote that “if there are provisions that should be included as standard (auto transfer of Declarant rights and control of voting rights in foreclosure), legal should be in the loop so that when the bank makes loans going forward, those provisions are always there unless specifically negotiated out.” (JX-65 at 1.) At the bench trial in this case, Mr. Maruska testified that he disagreed with Ms. Kordoban's concerns, because “the buyer has the opportunity to walk, if they want,” so Comerica need not “solve this issue” for the buyer. (Doc. No. 104 at 144:10-24.)

At trial, attorney Pakfar, Mr. Murphy, and Mr. Friedel all testified that the satisfactory resolution to the potential declarant issue was a “condition precedent” to AGK closing the deal to purchase the Sierra de Montserrat lots. (Doc. No. 100 at 138:14-139:5) (attorney Pakfar describing resolution of the declarant issues as “the very least that AGK would need in order to close”); (Doc. No. 102 at 65:14-20) (Mr. Murphy explaining that AGRE was “sufficiently concerned about control issues” such that if AGK's requested solutions were not granted, AGRE “[was] not going to close the deal”); (Doc. No. 103 at 17:4-7) (Mr. Friedel explaining that if the parties could not come to a resolution on this issue, “that would be a failure of a condition precedent. We would terminate the purchase and sale agreement and get our deposit back and move on.”). Specifically, AGK internally identified three feasible solutions to the potential control issues, in order of its preference: (1) a written settlement agreement between Comerica and Westwood in which Westwood would agree to relinquish his rights as declarant; (2) a reduction in the purchase price to account for the litigation-related and control-related risks; or (3) for Comerica and AGK to “draft around the issue,” namely, to “contractually get comfort from [Comerica] that this issue wasn't going to complicate AGK's life” through an indemnity provision. (See Doc. No. 100 at 135:10-137:2.) Attorney Pakfar testified that a written settlement agreement between Mr. Westwood and Comerica was “by far the best solution,” because it was the only resolution that was “airtight,” ensuring that AGK would become the declarant of Sierra de Montserrat. (See id. at 135:18-22.) Beyond such a settlement, attorney Pakfar considered the other options “much worse.” (See id. at 136:9.) With respect to a price reduction to offset the costs of potential control issues, it would be difficult to “predict the future[] and monetize how many different ways Mr. Westwood could complicate [AGK's] life.” (Id. at 136:9-13.) Similarly, attorney Pakfar thought an indemnity provision was “[t]he very worst result we could get because, . . . we didn't want a fight,” and an indemnity provision would have the effect of AGK “really inheriting a lawsuit.” (Id. at 137:6-12.) For these reasons, AGK “strongly preferred” the settlement option; by contrast, an indemnity provision “was the last straw,” the “very least that [Mr. Friedel] needed in order to be able to get [AGRE] to authorize the closing.” (Id. at 139:21-140:10.)

Attorney Pakfar also testified that, in addition to these three potential options to rectify the declarant's rights issue, AGK separately sought to obtain “title insurance” from FATCO “certifying that the declarant right had actually passed to Comerica, and would pass to [AGK].” (Doc. No. 100 at 132:4-7; see also Doc. No. 101 at 19:8-11.) Although it appears that FATCO did provide AGK with title insurance related to the Sierra de Montserrat sale, the scope of that title insurance-including whether AGK obtained the certification it sought from FATCO-is not clear from the evidence introduced by the parties in this action at trial. (See Doc. Nos. 103 at 73:22-25; 101 at 36:5-7, 36:23-25; 100 at 151:14-15.)

2. The “Mission Critical” Email

With these concerns in mind, on June 15, 2010, prior to the expiration of the due diligence period, Mr. Murphy emailed Mr. Chamberlain identifying certain issues as “mission critical” to the deal (the “mission critical email”). (JX-38 at 2.) Therein, Mr. Murphy identified two major issues. First, AGK posited that due to the way the property was titled, AGK would need to pay a $15,000 deposit to the Wildlife Heritage Foundation for each lot purchased. (Id.; see also Doc. No. 101 at 192:2-193:15.). In light of this extra expense, Mr. Murphy wrote that the Wildlife Heritage Foundation deposits would “reduce[] what we can pay by approximately $400,000 to $470,000.” (JX-38 at 2.)

Second was the issue of control. Mr. Murphy summarized this issue as follows:

When we put in our offer for the property the view from the Bank was that we could easily gain full control of the property (i.e., the HOA, Design Review Committee (DRC), and Board) via gaining declarant rights. In reality, it is not explicitly stated in the CC&Rs that the declarant rights transfer upon bulk sale and/or upon foreclosure. The Bank's recorded Deed of Trust states that they receive ‘all rights', etc, [sic] but there was not a single expert that we consulted that could/would state that this clause guarantees declarant status . . . . Thus, there [is] . . . a high likelihood that we will have to either defend our position against legal challenges and/or take legal action ourselves to attempt to gain control. Further, and significantly, if we are not the declarant and the [Supplemental Declaration] that Westwood filed late last year stands up in court he has the ability to buy the lots back from us three years from the foreclosure/transfer date . . . .
. . . [I]t hurts the value of the property by not being able to make changes and/or have total control. . . .
(Id. at 2-3.) Mr. Murphy stated that the control issue in turn created “significantly more return risk” for AGK, particularly as it related to legal costs, delays, and “muddy waters.” (See id. at 3; Doc. No. 102 at 38:21-24.) More specifically, AGK “would need to allocate legal dollars and personnel resources to either defending . . . or asserting” AGK's control rights. (JX-38 at 3.) The control challenges would also cause delays, which would “hurt[] [AGK's] returns (on both principal and deposits) and reduce[] . . . what [AGK] can pay.” (Id.) Finally, “any control issues and/or legal challenges will muddy the waters and hurt prospect [sic] buyer's confidence in our project,” which would in turn cause potential buyers to “sit and wait or create a scenario where they need a deeper discount to take the risk of buying a lot without everything being settled.” (Id.)

In outlining potential solutions to these control issues, Mr. Murphy wrote,

I have not heard back from [Comerica] regarding their status with Westwood and whether or not they are trying to cut a deal with him.
[W]e would be prepared to close at contract price on schedule (or with an extension) if we can get satisfactory resolution on our two primary due diligence concerns. Alternatively, we will still buy the property ‘as-is' but would require an appropriate price reduction to reflect the challenged nature of the circumstances. We would need a $435,000 reduction for the deposit issue and an additional $1,150,000 for legal/control risk, return risk, return loss on the 11 compromised lots, and time costs for all personnel involved. Thus, we are prepared to waive feasibility tomorrow with a revised contract price of $6,615,000. If we waive tomorrow we would require that the PSA be modified such that the bank would record an assignment of declarant rights to us to at least create as [sic] additional hurdle for Westwood to clear.
(Id. at 1, 3.) At trial, Mr. Friedel explained in his testimony that he provided the $435,000 and $1,150,000 figures to Mr. Murphy after running calculations of AGK's estimated fees and losses associated with the Wildlife Heritage Foundation deposits and the control issues. (Doc. No. 103 at 25:7-26:6.) Mr. Murphy testified that an “assignment of declarant rights” would contain an acknowledgement that Comerica was the declarant of Sierra de Montserrat and that Comerica would assign those rights to AGK. (Doc. No. 102 at 52:23-53:2.)

These eleven “compromised lots” referred to eleven lots “that have smaller building envelopes and relatively significant slope coming off the main road,” rendering them more suitable for building homes that are smaller than the minimum square footage requirements at the development. (JX-38 at 2.) As a result, AGK believed these lots would be “very difficult to sell” if AGK was not able to “reach an agreement” to allow the building of around ten smaller homes in the development. (Id. at 2-3.) Without control of the development, AGK feared it would not be able to reach such an agreement and the eleven lots would be difficult to sell, and consequently, this issue “reduces what [AGK] can pay” for the 51 lots at Sierra de Montserrat. (See id.) These eleven “compromised lots” are not otherwise relevant to the outcome of this action.

The PSA in this transaction provided for a 30-day due diligence period during which AGK's $450,000 deposit would be “contingent,” meaning that AGK's deposit would be refundable if it decided not to proceed with the deal during the due diligence period. (See JX-27 at 1; Doc. No. 101 at 69:19-70:24.) In this context, “waiving feasibility,” also referred to as “waiving contingency” or “waiving due diligence,” refers to the buyer waiving the contingent nature of its deposit, such that the buyer's deposit would only be refundable under certain limited circumstances. (See Doc. No. 101 at 69:23-25.)

Although the mission critical email did not explicitly mention indemnification, Mr. Murphy and Mr. Friedel testified at trial that indemnification was being considered by AGK at this time as an element of the proposed solutions in the mission critical email. (Doc. Nos. 102 at 95:12-22; 103 at 26:16-21.) Specifically, they testified that AGK would not have required an indemnification provision in order to close the deal if Comerica had entered into a settlement with Westwood regarding the declarant status-which Mr. Murphy alluded to when describing Comerica “cutting a deal” with Mr. Westwood-or if AGK had received the full amount of the requested price reduction and the assignment of declarant rights. (See Doc. No. 102 at 23:8-12) (Mr. Murphy explaining that “[m]y recollection is [Comerica was] working on a release. My recollection was at some point they actually had an agreement with Westwood. I believe he was either going to, or filed for bankruptcy protection, and there was a release of some sort, either in the works, or completed.”); (Doc. No. 103 at 26:16-21) (Mr. Friedel explaining that if AGK had received the full price reduction and the assignment of declarant rights, AGK “would have still asked for” an indemnification provision, but “would have closed without it”); (Doc. No. 102 at 95:12-22) (Mr. Murphy explaining that “[a]t that point, in my mind, had we gotten the full reduction, . . . we would have closed “as is” with the full reduction and with the transfer of declarant rights . . . . When that was not granted, . . . we required a release and/or indemnity.”). Mr. Murphy and Mr. Friedel testified that, without either a settlement between Comerica and Westwood or the requested price reduction, AGK's remaining feasible solution to close the deal was to pursue an assignment of declarant rights that included an indemnification provision relating to the declarant's rights issue. Therefore, the court finds that AGK's position at time of mission critical email was that it would not have necessarily required an indemnification provision in order for the deal to close. (See Doc. Nos. 102 at 95:12-22; 103 at 26:19-27:7.)

At trial, attorney Pakfar testified that, as AGK's lawyer on this transaction, he viewed the inclusion of an indemnity provision as “part and parcel” to an assignment of declarant rights; in other words, as a matter of course, any assignment of declarant rights would include a clause through which Comerica agreed to indemnify AGK for costs arising out of disputes over who was the true declarant of Sierra de Montserrat. (Doc. No. 101 at 160:2-161:15.) However, attorney Pakfar conceded that the meaning of AGK's reference to an “assignment of declarant's rights” in the mission critical email would best be determined by Mr. Friedel, “the ultimate decisionmaker.” (Id. at 161:15-18.)

Mr. Chamberlain forwarded the mission critical email to Mr. Maruska, who replied on June 16, 2010, “Comerica Bank will allow a $500,000 reduction in price (adjusted price of $7,700,000) if they waive contingency and the deal can still close on time.” (JX-38 at 1.)

3. Amendments to the PSA

Also on June 16, 2010, while the discussion of the mission critical issues remained ongoing, the parties executed the first of three amendments to the PSA. (See JX-60.) This amendment extended the due diligence period through June 18, 2010 and was transmitted between the parties by email, with Mr. Maruska, attorney Pakfar, Ms. Tresler, Mr. Murphy, Mr. Ferrer, Ms. Kordoban, Mr. Chamberlain, another Comerica employee, and a colleague of Mr. Chamberlain all copied on the email chain. (Id.)

Two days later, on June 18, 2010, the parties executed the second amendment to the PSA (the “second amendment”). (See JX-61.) The second amendment, also transmitted by email to the same individuals as the first amendment to the PSA, reduced the purchase price by only $500,000-from $8,200,000 to $7,700,000-rather than the $6,615,000 proposed by Mr. Murphy in his June 10, 2010 email. (See id. at 6.) In addition, the second amendment extended the due diligence period to June 25, 2010. (Id.)

Following the execution of the second amendment, on June 21, 2010, Mr. Murphy circulated a revised version of the mission critical email to Mr. Maruska, copying Mr. Chamberlain, Mr. Friedel, and attorney Pakfar. (JX-39.) Once again, Mr. Murphy outlined two major issues, the first being the $15,000 per lot deposits to the Wildlife Heritage Foundation and the second being the control issues. (Id. at 1.) Mr. Murphy added more detail to his explanation of the ambiguity surrounding who was the declarant of Sierra de Montserrat and the consequences for AGK stemming from this ambiguity. (See id. at 2.) Despite the parties having already negotiated a $500,000 reduction in the purchase price in the second amendment, Mr. Murphy retained his statement from the June 16, 2010 version of the mission critical email that AGK “would need a $435,000 reduction for the [Wildlife Heritage Foundation] deposit issue and an additional $1,150,000 for legal/control risk, return risk, return loss on the 11 compromised lots, and time costs for all personnel involved” in order for the deal to close. (See id. at 3.) Mr. Murphy also restated that AGK would be prepared to “waive feasibility tomorrow with a revised contract price of $6,615,000” and a modification to the PSA “such that the bank would record an assignment of declarant rights to us to at least create as [sic] additional hurdle for Westwood to clear.” (Id.) Mr. Murphy added,

This reduced price would be the result of subtracting $435,000 (for the Wildlife Heritage Foundation deposit) and $1,150,000 (for legal/control related risks) from the original $8,200,000 contract price provided for by the initial PSA. (See JX-39 at 3; JX-27 at 1.)

[Attorney Pakfar] could also provide references of other [Department of Real Estate] attorneys/experts that he spoke with as well that confirmed the control challenges. He would also be happy to discuss the assignment of declarant rights provisions that we included in our initial second amendment proposal with [Mr. Ferrer]. We are trying to keep legal costs down but it appears that the Bank will require at least one further conversation in this regard. [Mr. Maruska], when you choose to forward this on to [Mr. Ferrer] I would appreciate it if [attorney Pakfar] and [Mr. Ferrer] could coordinate schedules for a call sooner rather than later.
It is my goal to try to get you any further supporting documentation that you need early this week so that we can attempt to come to final terms early enough to still close this month.
(Id. at 3.) Despite Mr. Murphy's request, a subsequent call between Attorney Pakfar and Mr. Ferrer, the Vice President of Corporate Counsel at Comerica, to discuss these control challenges never occurred. (Doc. Nos. 101 at 20:4-5; see also Doc. No. 104 at 98:6-11.) When questioned at trial about the lack of a call, attorney Pakfar pointed to AGK's “increasing level of frustration with Mr. Ferrer's unavailability,” because Mr. Ferrer was the [AGK's] legal point of contact at Comerica, “and it was tough to get work done when he just wouldn't respond to [AGK], despite [Mr. Murphy's] urging.” (Doc. No. 101 at 20:5-10.) Indeed, Mr. Maruska did not forward Mr. Murphy's email onto Mr. Ferrer, because “there was nothing for us to gain by [doing] that,” “[i]t didn't have substance,” and he simply “just didn't want to set up a phone call between the two of them” without there being a specific document to discuss. (Doc. No. 104 at 98:6-11, 156:157:22.) Instead, Mr. Maruska-who believed this email was part of “an ongoing attempt to lower the price” of the deal-asked Comerica's HOA expert for an opinion letter that could help justify a further price reduction to Comerica's management. (Id. at 97:3-4.) It is unclear what the outcome was, if any, of Mr. Maruska's inquiry to Comerica's HOA expert in that regard.

Attorney Pakfar testified that “Mr. Ferrer was generally hard to reach the whole time. This wasn't a very helpful seller in that sense. . . . [Comerica wasn't] engaging a lot with us . . . certainly when it counted around closing time, [Mr. Ferrer's] unavailability was more pronounced, and more frustrating, because that's when we were trying to close.” (Doc. No. 101 at 118:7-16.) Similarly, attorney Galstian testified that he “had really very little luck in dealing with the seller side in terms of communications.” (Doc. No. 102 at 143:9-12.). At trial, Mr. Ferrer testified that he was “pretty sure” that he spoke with attorney Pakfar about the PSA, but did not recall speaking to attorney Galstian at all or speaking to attorney Pakfar about any of the deal documents other than the initial PSA. (Doc. No. 105 at 60:8-62:1.)

In contrast to his trial testimony, Mr. Maruska testified in his deposition in this case that he “believe[d]” he forwarded the email to Mr. Ferrer. (Doc. No. 104 at 157:5-12.) When questioned at trial about this inconsistency, Mr. Maruska clarified that he did not believe he forwarded the email. (Id. at 158:6-11.) He explained that Comerica counsel does not help with pricing; rather, the deal price is a “business decision by the business unit,” and he did not want to involve Mr. Ferrer unless there was a document for Mr. Ferrer to review. (Id. at 159:3-4, 159:22-24.)

On June 25, 2010, the parties executed a third amendment to the PSA (the “third amendment”). (See JX-43.) The third amendment was also transmitted by email in a continuation of the same email thread between Mr. Maruska, attorneys Pakfar and Galstian, Ms. Tresler, Mr. Murphy, Mr. Ferrer, Mr. Friedel, Ms. Kordoban, Mr. Chamberlain, another Comerica employee, and a colleague of Mr. Chamberlain that had been used to transmit the first and second amendments. (JX-43 at 1, 7.) The third amendment set a closing date of June 30, 2010 and further reduced the purchase price by another $350,000, from $7,700,000 to $7,350,000. (Id.) In addition, the third amendment required that the parties enter into

The closing date and the end of the due diligence period are two distinct deadlines. (See JX-27 at 2) (describing the closing date as “no later than five (5) days after the end of the Buyer's Due Diligence Period.”) Thus, following the third amendment, the due diligence period was set to expire on June 25, 2010 and the deal's closing deadline was June 30, 2010. (See JX-61 at 6) (extending the buyer's due diligence period to June 25, 2010).

an original Assignment of Declarant Rights, duly executed and acknowledged by Seller and in recordable form, assigning to Buyer all of “Declarant's interest in the Development,” as contemplated by Section 10.03 of the Declaration of Covenants, Conditions, Restrictions and Easements for Sierra de Montserrat, and otherwise in form and substance acceptable to Buyer [.]
(Id.) (emphasis added). Although the third amendment required the assignment of declarant's rights to be “in form and substance acceptable to” AGK, no such assignment of declarant's rights had been drafted by the parties as of that time. Further, the third amendment did not provide information concerning the substance or material terms of such an assignment of declarant's rights. Instead, the third amendment simply included the yet-to-be-drafted assignment of declarant's rights among the list of documents required for closing. (See id.; JX-27 at 3.) Attorney Pakfar testified that this structure was typical of a provision in a PSA listing documents required for closing, since these portions of a PSA simply provide a “list of closing documents” and do not contain the “crude material terms” of those closing documents. (Doc. No. 101 at 132:4-5.) Rather, according to him, the material terms of such closing documents would only be reflected within the contents of those documents, when they were eventually drafted. (See id.)

The rationale underlying including this assignment-of-declarant's-rights provision in the third amendment stemmed from the parties' plans with respect to the drafting of the assignment of declarant's rights. AGK wished to draft the assignment of declarant rights and negotiate it with Mr. Ferrer; however, because Comerica was not comfortable with AGK preparing the first draft of the assignment, the parties agreed that FATCO, serving in a nonpartisan capacity, would prepare the first draft. (See Doc. No. 101 at 29:4-18, 30:8-10, 125:18-126:3.) With the due diligence period set to expire at 5:00 p.m. on June 25, 2010, AGK had just a few hours to decide whether to waive contingencies in order to proceed with the deal. (See JX-61 at 6; Doc. No. 101 at 69:23-25; JX-43 at 7.) Because AGK was unable to draft the assignment of declarant rights and “couldn't get ahold of Mr. Ferrer [to discuss the provisions of the assignment of declarant's rights],” AGK felt that its “only other option” was to agree to waive contingencies but require that AGK would have sole discretion on the ultimate form of the assignment of declarant rights. (Doc. No. 101 at 29:19-22; see also JX-39 at 3.) Thus, as attorney Pakfar explained during his trial testimony, AGK wanted the provision about the assignment of declarant rights added to the third amendment because AGK “wanted to make it clear that AGK would only close if the form of the declarant assignment was acceptable in [AGK's] sole and absolute discretion.” (Doc. No. 100 at 122:7-10.) Although by waiving contingencies, AGK would lose its deposit, Comerica “would potentially be subject to an Assignment of Declarant Rights they weren't 100 percent comfortable with, so this was a way to essentially keep the deal as contingent”; in other words, “despite the due diligence expiring, AGK would still [effectively] have the right to terminate the deal in its sole discretion if it was not fully satisfied with the declarant assignment.” (Id. at 122:11-18.)

AGK did, in fact, waive due diligence on June 25, 2010, as memorialized by an email from attorney Pakfar in the same email chain the parties employed to transmit the draft and executed versions of the third amendment. (See JX-47 at 1.)

The third amendment also required Comerica's closing documents to include “an original notarized instrument, duly executed and acknowledged by [Comerica] and in recordable form, that has the effect of removing as a matter of record and encumbrance on title” Westwood's Supplemental Declaration. (JX-43 at 7; see also JX-27 at 3.) Similar to the provision for the assignment of declarant's rights, the revocation of the Supplemental Declaration had to be “in form and substance acceptable” to AGK. (JX-43 at 8.)

In the email chain attaching the executed third amendment, attorney Pakfar also attached what he described as “a redline to the Second Amendment circulated last week.” (JX-43 at 2.) The redline, which was generated by a computer program to show the differences between two documents, displays a stricken-out paragraph titled “Settlement with Westwood.” (Doc. Nos. 100 at 123:7-9; 101 at 72:18-25, 76:8-20; JX-43 at 16.) The stricken-out paragraph would have required Comerica to enter into a settlement with Westwood and Mr. Westwood, pursuant to which Westwood would agree to relinquish all rights as declarant and acknowledge that the declarant status had been transferred to Comerica. (See Doc. No. 100 at 123:13-18; JX-43 at 16.) This provision was proposed by AGK but deleted at Comerica's instruction. (Doc. No. 101 at 76:8-20; see also Doc. No. 102 at 130:18-24.)

There appeared to be some confusion at trial regarding which version of the second amendment was used to generate this redline, which in turn led to confusion regarding the size of the price reduction provided for by the third amendment. (See, e.g., Doc. Nos. 101 at 76:21-77:9; 102 at 58:17-22.) The court thus provides the following clarification: The redline does not appear to have been run against the finalized version of the second amendment that was executed by the parties. For example, the executed second amendment provided for a purchase price of $7,700,000, but the version of the second amendment used in attorney Pakfar's redline provided for a purchase price of $7,200,000. (See JX-61 at 6; JX-43 at 15.) Mr. Murphy explained in his testimony that at some point during these negotiations, the parties may have discussed a $7,200,000 purchase price, but he could not recall exactly what brought the price down to $7,200,000 in the draft second amendment or back up to $7,350,000 as provided for by the finalized third amendment, citing “ongoing conversations” regarding the “continuum of [AGK's] concession requests.” (See Doc. No. 102 at 58:10-59:16.) Likewise, as described below, the version of the second amendment attorney Pakfar used in this redline contained a “Settlement with Westwood” section that was not in the parties' executed second amendment. (See JX-61 at 6-7; JX-43 at 16.) At trial, attorney Pakfar clarified during his testimony that “there was a draft Second Amendment that included the settlement with Westwood,” and the version of the second amendment he used in the redline was “some version” of the second amendment, though he couldn't remember which. (Doc. No. 101 at 77:5-9, 77:18-19.) The court also notes that the redline does not reflect that the “Assignment of Declarant Rights” section was a new addition; in other words, it appears that there was a version of the second amendment that included an Assignment of Declarant Rights section, though the executed version of the second amendment did not include this provision. (See JX-43 at 15; JX-61 at 6-7.) This inference is supported by the fact that Mr. Murphy's June 21, 2010 mission critical email states that attorney Pakfar would “be happy to discuss the assignment of declarant rights provisions that [AGK] included in our initial second amendment proposal with [Mr. Ferrer].” (JX-39 at 3.) Accordingly, the court finds that AGK proposed both the settlement with Westwood provision and the assignment of declarant rights provision, at the latest, at some point during negotiations with Comerica over the second amendment, which was executed on June 18, 2010. The court notes, however, that Mr. Murphy also referenced both of these options in his June 15, 2010 mission critical email, and AGK may have raised them even earlier. (See JX-38 at 2.) At trial, Mr. Maruska testified that AGK raised the issue of Comerica's lawsuit prior to the execution of the PSA on May 17, 2010 and “brought up” settlement with Westwood at some point, though he could not recall when. (Doc. No. 104 at 130:13-16, 130:22-131:14; see also JX-27.) Mr. Maruska also testified that an assignment of declarant rights was discussed between the parties as early as June 15, 2010 in the mission critical email, though it was possible that it could have been brought up by AGK even earlier. (See Doc. No. 104 at 150:19-151:20.)

At trial, there was some confusion as to which party proposed this provision and which party deleted it. (See Doc. No. 101 at 75:24-76:22.) Attorney Pakfar clarified in his testimony that AGK proposed the “settlement with Westwood” provision. (Id. at 76:8-13.) Nonetheless, based on the programmatically-generated notations on the document, it may have been him (or someone else on the AGK side of the transaction) who actually deleted the text from the draft document at Comerica's direction. (See id.) (“I [was the one] sending this document . . . . [s]o they wouldn't have struck it out. They would have presumably communicated to [Mr. Murphy] that they won't agree with that, but they wouldn't be the one striking it out, because they are not running the Delta View [computer program].”) At trial, Mr. Maruska testified that he “was extremely confident that we [Comerica] weren't going to reach a settlement with Mr. Westwood, and did not want to promise to force that . . . . I wasn't going to get management at Comerica to agree on settling with Mr. Westwood so that we could sell this property.” (Doc. No. 104 at 130:9-16.) Thus, it is unclear to the court who at Comerica determined that the settlement with Westwood provision had to be deleted, particularly in light of the above-described emails and testimony that Ms. Kordoban was concerned about Comerica's ability to sell Sierra de Montserrat in light of its ongoing litigation with Westwood and the declarant's rights issues, but that Mr. Maruska disagreed with her and took the position that Comerica need not “solve this issue” for a buyer. (See JX-66 at 1-2; JX-65 at 1-2; Doc. No. 104 at 144:10-24.)

As noted above, a settlement between Comerica and Westwood was AGK's preferred “gold standard” method to resolve the control issues related to Sierra de Montserrat. (See Doc. No. 102 at 46:9-10.) At trial, Mr. Murphy testified that AGK likely maintained the belief that such a settlement was possible up until the parties' negotiation of the third amendment. (Id. at 46:19-25.) Although he could not remember precisely when AGK realized that such a settlement would not occur, Mr. Murphy testified that AGK “probably” realized that a settlement with Westwood would not happen once the “Settlement with Westwood” provision was removed from the draft third amendment. (Id.) Mr. Murphy testified that in his experience, it is “very typical” for his residential real estate deals to involve “negotiating down to the wire.” (Id. at 47:2-6.) Nonetheless, given how close AGK's realization in this regard was (around June 25, 2010) to when the deal was supposed to close (June 30, 2010), Mr. Murphy testified that it is “likely” that he presumed the parties would extend the deal deadlines again after this point, noting that it would not be unusual for deals he had worked on to receive four or five time extensions. (Id. at 47:1-11.)

4. Timing and Pressure Surrounding the Deal

The parties did not, in fact, enter into any subsequent amendments further extending the due diligence period past June 25, 2010 or the closing deadline past June 30, 2010. At trial, attorney Pakfar testified that he was not aware of any internal pressure from AGK for the deal to close on June 30, 2010, particularly because AGK was the buyer rather than a seller trying to get property off of its books by a certain date. (Doc. No. 101 at 60:11-22.) Similarly, attorney Galstian testified that he does not believe he, attorney Pakfar, or AGK put any “time pressure” on Comerica to sign closing documents, and indeed, Galstian had a handful of closings at that time, which made him wish he had more time on the Sierra de Montserrat deal. (Doc. No. 102 at 144:20-145:5.) Mr. Friedel likewise testified that AGRE did not need the deal to close by June 30, 2010 and would have been willing to close after that date. (Doc. No. 103 at 40:14-20.)

In contrast, Mr. Murphy, attorneys Pakfar and Galstian, and Mr. Friedel all testified that Comerica and/or Mr. Maruska were under pressure to close the deal by the end of the quarter on June 30, 2010. As attorney Pakfar explained his understanding of the timing,

[A] quarter is a measurement period, a significant measurement period for companies and banks, so there was some incentive for Mr. Maruska . . . I'm not exactly sure what the incentive was, whether there was a bonus involved, or just your books and records look cleaner. There definitely was a hard push to close June 30th on their end. . . . I don't believe [Mr. Maruska ever communicated that to me directly] . . . . But it was . . . very clear why that date was picked, and there was a closing push to get it done, which, as I was saying, that's why . . . everything was delicate at this point. . . . we were under the gun to close June 30 . . . . there was pressure from them- significant pressure . . . to close on time because of the bank's demand.
(Doc. No. 101 at 59:10-22, 60:23-61:1). Mr. Friedel testified that his “understanding, at the time, was that there was sensitivity on the bank's part to get this off the books by the end of the quarter, which would be a June 30th quarter end date.” (Doc. No. 103 at 30:25-31:3.) Attorney Galstian testified that he did not put any time pressure on Mr. Maruska to sign closing documents and “if anything, it was the other way around,” and that his “recollection was [that] Comerica wanted this off their books at the end of the quarter.” (Doc. No. 102 at 144:20-23, 145:4-5.) Mr. Murphy similarly testified that, “[m]y recollection is there was a deadline for the bank. I believe they were trying to get it in a certain quarter to get the asset off the books.” (Doc. No. 102 at 63:24-64:1.) The court finds that all of this testimony was credible and suggests, at the very least, that AGK perceived Comerica to be putting pressure on the deal to close by June 30, 2010.

Mr. Maruska also testified-albeit in a less consistent manner-as to the sensitivity in connection with the timing of the sale. When asked if there was “any significance” to the June 30, 2010 closing date, Mr. Maruska responded, “[n]ot really. It is end of quarter. However, it wouldn't have mattered if it had drug over to another quarter.” (Doc. No. 104 at 92:14-17.) Although his compensation was tied to “[d]ollars or assets sold, and sales dollars for a calendar year,” Mr. Maruska testified that it would not have mattered, with respect to his compensation, whether the Sierra de Montserrat sale closed on or before June 30, 2010. (Id. at 92:18-25.)

The court finds that Mr. Maruska's trial testimony is not wholly credible in this regard, however, because he also testified that closing the deal was important and to feeling at least some pressure to do so by the end of the quarter. On cross-examination, Mr. Maruska testified that Comerica “always want[s] to sell the assets as quickly as we can” and that it was “very important” for Comerica to remove real estate owned from its portfolio generally. (Id. at 180:25181:6.) When asked if the quarter-end in particular is a “very important reporting period,” Mr. Maruska answered that it is “important, [but] not very important” and said that closing the Sierra de Montserrat deal by the end of the quarter would have been “helpful” but “not critical.” (Id. at 181:7-11, 181:22-24.) When confronted with his deposition testimony, in which he stated that it is “very important” to move real estate owned off of his portfolio, Mr. Maruska responded that “I do recall delays in the process from when we started, and so we were trying to-every day that an asset is still owned, it's still liability for the bank” and conceded that getting real estate owned off of his portfolio by the end of the quarterly reporting period is “important.” (Id. at 182:3-16.) Thereafter, Mr. Maruska testified that he felt “some pressure” to finish the deal by the end of the quarter, but reiterated that “[i]t wasn't critical.” (Id. at 182:17-19.) Thus, although it appears Mr. Maruska's compensation might not have been directly impacted by the closing of the deal by the end of the quarter, it also appears that his testimony as to the importance of the quarter-end date and the level of pressure he felt to close the deal by then is at best unclear, and at worst, somewhat inconsistent. The court therefore attributes more credibility to the testimony of Mr. Murphy, attorneys Pakfar and Galstian, and Mr. Friedel and finds that Mr. Maruska felt at least some pressure from Comerica to close the deal by June 30, 2010, and this time-pressure was observable to AGK.

Although the court concludes that the time pressure on closing the Sierra de Montserrat deal derived mostly, if not totally, from Comerica's side of the negotiations, the court notes that Mr. Murphy was also under pressure in a general sense to close the deal. As noted above, Mr. Murphy was AGK's “boots on the ground,” whereas AGRE served as the money partner with ultimate authority over the transaction. (Doc. No. 101 at 177:7-178:2.) In addition, as noted above, Mr. Murphy had only recently left his employment with Shea Homes to found his individual venture, Kinetic Homes. (Id. at 167:12-16.) In his own words,

It was important for me [to get the deal across the finish line]. At that time, I was probably seven or eight months in from departing from Shea [Homes]. The housing market was still pretty bad. So for me, this was a deal that I put a lot [of] time and effort and energy into. For me, it was the closest deal to completion that would launch my independent efforts as Kinetic Partners, so it was pretty important to me personally.
(Doc. No. 102 at 24:23-25:6.) Mr. Murphy testified that at one particularly fraught point during the negotiations, his “heart sank, [when he] thought the deal was going to blowup [sic],” and he recalls “pacing” while discussing pertinent issues with attorney Pakfar during that time. (Id. at 65:1-8.) Thus, although there is no evidence before the court suggesting that Mr. Murphy felt pressure to close the deal by a specific deadline date, the court observes that both of the parties serving as primary points of contact on either side of the transaction-Mr. Maruska for Comerica and Mr. Murphy for AGK-were eager for this deal to close and perhaps were more personally invested in the deal's outcome than were Comerica and AGRE.

5. Preparation of Closing Documents

On June 25, 2010, the escrow agent, Ms. Tresler, responded to attorney Pakfar's email attaching the executed third amendment and asked whether “anyone ha[s] a draft of the proposed release to be sufficient to meet your requirements to remove the Supplemental Declaration as required under the 3rd Amendment. . . . Also under what section of the CC&R's that you feel the seller has the authority to sign such a document.” (JX-45 at 2-3.) When asked about his understanding of Ms. Tresler's inquiry, attorney Pakfar testified that

the [third] amendment required that the effect of th[e] revocation of the [supplemental] declaration be that the matter is removed from title. . . . so she's, I think, responding to that and . . . . [s]he's saying [“]why do you feel seller, Comerica, has the authority[”] This goes to the heart of the issue, which is that . . . the seller would only have that authority if they were the declarant. . . . she's basically asking [“]are you sure Comerica is the declarant and can effectively sign that.[”]
(Doc. No. 101 at 31:19-32:10.) Attorney Pakfar further explained that by this time in the deal, AGK had “done the research, and [AGK] thought that it was an open question as to who was the declarant, and absent Comerica settling with Mr. Westwood, and resolving that issue in writing, we weren't going to be able to resolve that issue. Otherwise it was going to be a gray area.” (Id. at 34:11-16.) Therefore, it was “frustrating” for attorney Pakfar that Ms. Tresler did not “already have her arms around the issue” by June 25, 2010, though he noted that “she's an escrow officer,” and “[e]scrow officers don't always need to know the intricacies.” (Id. at 34:17-35:15.) Attorney Pakfar added,
[W]e were very stressed and frustrated by Mr. Ferrer as well, to be honest, because this is not, ideally, how you do a deal.
If he would have just contacted us a week ahead, he could have comfortably negotiated a form and had a joint strategy. But, you know, he was playing his cards close to his [chest], not communicating with us, going through [Ms. Tresler]. So it was a game of telephone.
(Id. at 35:18-25.)

In response to Ms. Tresler's email, and consistent with the above-described testimony that the parties agreed to have FATCO draft the assignment of declarant rights, attorney Pakfar clarified that on a call with FATCO's title officer the previous day, the title officer “offered to provide forms for both the [Assignment] of Declarant Rights and the Revocation of Supplemental Declaration and confirmed that the former would be recorded and the latter would be sufficient to remove the Supplemental Declaration from title.” (JX-45 at 2.) Attorney Pakfar testified that in his view by agreeing to record the revocation of the Supplemental Declaration, the FATCO title officer had demonstrated that he was “comfortable enough” with the gray area surrounding the declarant issues for FATCO to “take the position that Comerica is the declarant.” (Doc. No. 101 at 36:5-7.)

Ms. Tresler then confirmed that she spoke with the title officer, received the forms, and would “include [the forms] in the documents for closing to be signed by the seller, and send] out for review by the buyer.” (JX-45 at 1) (emphasis added). Four minutes later, Ms. Tresler responded to her own email attaching “the examples of the forms that I will be preparing” and asking the parties to “confirm they are sufficient-we are willing to insure based on these forms.” (JX-46 at 1-2.)

As the court explained above, while it is apparent that FATCO provided title insurance to AGK with respect to Sierra de Montserrat, based on the evidence presented at the trial of this action, the exact scope of that title insurance is somewhat unclear. (See Doc. Nos. 103 at 73:2225; 101 at 36:5-7, 36:23-25; 100 at 151:14-15.)

Ms. Tresler's email contained two one-page PDF attachments. (Id. at 11-12.) The first attachment was titled “RECISSION [sic] OF DECLARATION OF RESTRICTIONS” and contained several blanks throughout the three sentences of text appearing on the page, as well as blanks for signature and date entries (“template RDR”). (Id. at 11.) The page was stamped with a large “SAMPLE” watermark across the page. (Id.) Intended to serve as the revocation of the Supplemental Declaration required by the third amendment, the body text of the template RDR stated:

The undersigned owners hereby rescind, cancel and revoke al those Covenants, Conditions and Restrictions recorded on [BLANK] in Book [BLANK] at Page [BLANK] of Official Records in the Office of the County Recorder of [BLANK] County, State of California.
The affected property is lots [BLANK] through [BLANK] inclusive, as shown upon that certain map entitled [BLANK], filed for record on [BLANK] in Bookof [sic] Maps, at Page [BLANK] in the Office of the County Recorder of [BLANK] County, State of California.
The undersigned are all the owners of the property as shown on that certain map entitled: [BLANK]
(Id. at 11; see also JX-45 at 2.)

The second attachment was titled “ASSIGNMENT,” bore the “SAMPLE” watermark across the page, and contained only one sentence of text with several blanks in which to add inserted text (“template ADR”):

FOR VALUE RECEIVED, the undersigned hereby grants, assigns, and transfers to [BLANK] all [BLANK] interest under that certain [BLANK] dated [BLANK], executed by [BLANK] to [BLANK], and recorded as instrument No. [BLANK] on [BLANK] in Book [BLANK] at Page [BLANK] of Official Records in the Office of the County Recorder of [BLANK] County, State of California, and more particularly described as follows: [BLANK]
(JX-46. at 12.) The bottom of the form contained a date and signature line for “Assignor(s),” and the top of the page contained an information box “FOR RECORDER'S USE ONLY.” (Id.) In other words, the attachments to Ms. Tresler's email were mere empty templates.

Mr. Maruska replied to Ms. Tresler's email (with all parties from the third amendment to the PSA email chain still copied) stating that Comerica had “reviewed and approved the form templates” and instructing Ms. Tresler to “send completedforms (ready for execution by seller) over to us for final blessing by legal counsel.” (Id. at 1) (emphasis added). At trial, Mr. Ferrer confirmed that he had reviewed Ms. Tresler's sample forms and did not have any concerns about them, other than the fact that they were blank and needed additional information. (Doc. No. 105 at 40:14-16.)

During closing arguments at trial, defendant asserted that “within minutes” of Mr. Maruska sending this email approving of the template RDR and template ADR, attorney Pakfar sent his email waiving due diligence. (Doc. No. 105 at 133:12-17.) From Mr. Maruska's perspective, defendant argued, “it sure felt like . . . when he gave the initial approval to the forms . . . and then got this waiver of due diligence a few minutes later, that the parties had a deal.” (Id. at 133:18-22.) Despite defense counsel's characterization of the events in his closing argument, attorney Pakfar's email waiving due diligence in fact bears a “19:40:41 EDT” timestamp, nearly one-and-a-half hours after Mr. Maruska's email approving the form templates, which is timestamped “18:15:13 EDT.” (See JX-47 at 1; JX-46 at 1.) Similarly, although Mr. Maruska testified at trial that he thought “this was pretty much a done deal” at this point, this testimony is inconsistent with Mr. Maruska's later testimony in which he acknowledged that he intended to show the completed version of these documents to Mr. Ferrer so that Mr. Ferrer could “make sure it's accurate and that [Comerica] concur[s].” (See Doc. No. 104 at 103:4-7, 107:13-14.) In other words, Mr. Maruska knew that the template forms still needed to be filled out and then would still be subject to, at the very least, internal legal review and approval. This fact would suggest that Mr. Maruska did not view the deal negotiations as having been fully concluded at this time, because there still was a possibility that Mr. Ferrer would offer revisions to the forms, which would in turn require another round of review and approval by AGK. Furthermore, the trial exhibits in this case do not indicate whether AGK ever responded to Mr. Maruska's email approving of the templates or communicated anything to Comerica indicating that AGK also approved them. Accordingly, while the court acknowledges that AGK's waiver of due diligence took place within two hours of Mr. Ferrer approving of the template RDR and template ADR, the court is unable to conclude whether Mr. Maruska at that time actually thought that the parties had fully concluded their negotiations or by extension, whether Mr. Maruska at that time thought that the template RDR and template ADR were “in form and substance acceptable to Buyer,” as was required by the parties' third amendment. (See JX-43 at 7-8.)

Although both Mr. Maruska's email approving of the template forms and attorney Pakfar's email waiving due diligence both were sent in the email thread that had been used earlier to transmit the executed third amendment, their emails were not in direct response to each other. (See JX-46 at 1; JX-47 at 1.) Mr. Maruska's email was in direct response to Ms. Tresler's email attaching the templates, while attorney Pakfar's email was in direct response to Mr. Maruska's email attaching the executed third amendment. (See JX-46 at 1-2; JX-47 at 1-2.)

Although the evidence introduced at trial does not suggest that anyone from AGK's side of the transaction replied to Ms. Tresler's June 25, 2010 email attaching the template RDR and template ADR or Mr. Maruska's June 25, 2010 email approving of them, attorney Pakfar testified at trial that his understanding of the template ADR was “that it wasn't really a great Assignment of Declarant Rights form.” (Doc. No. 101 at 39:24-25.) Attorney Pakfar thought that “[i]t was not at all tailored to the transaction” and “was just a very generic assignment form” that would require “a lot of work” to be effective, and both this document and the template RDR were “definitely not in recordable form.” (Id. at 39:25-40:8.)

a. Emails between FATCO and Comerica on June 27-28, 2010

On Sunday, June 27, 2010, escrow agent Ms. Tresler started a new email chain in which she emailed only Mr. Maruska, Mr. Ferrer, Ms. Kordoban, and another Comerica employee, saying:

Here are my closing documents for review, and if acceptable for execution by you-I await the buyer S comments on the Recission [sic] and Assignment.
When approved and ready please execute, complete where necessary, have notarized and send over night [sic] to my attention, at the earliest AM delivery for that day.
If we are to record on Wednesday [June 30, 2010] I need these documents no later than 8am on Wednesday-Federal Express is the suite next door so their 8am is usually here by 7:30 or so.
Should you have any questions don't hesitate to let me know.
(JX-70 at 2) (emphasis added). Attached to her email were nine documents related to closing, including updated versions of the assignment of declarant's rights and recission of declaration of restrictions with the information added to the blank spaces from the template versions of these documents (“June 27 ADR” and “June 27 RDR,” respectively). (See DX-B at 1, 6, 250; see also Doc. No. 104 at 111:1-16 (Mr. Maruska confirming that the only changes to the June 27 ADR was that it had been filled-in with transaction-specific information.)) The draft closing documents in Ms. Tresler's email referred to the buyer as “AG Sierra de Montserrat, L.P.” (See DX-B at 6, 9, 13, 25, 28.) As Ms. Tresler noted in her email, she had not yet received feedback from AGK regarding the June 27 ADR and June 27 RDR. (Id. at 1; see also Doc. No. 104 at 109:11-23.) At trial, Mr. Maruska testified he understood Ms. Tresler's email to be asking Comerica to read and execute the documents “and return with Fed-Ex under [a] . . . pretty tight time frame,” despite the fact that Ms. Tresler indicated that the assignment of declarant's rights and ADR had not yet been approved by AGK. (Doc. No. 104 at 109:3-7, 109:14-18.) Although Mr. Maruska stated that Ms. Tresler's request did not “make sense” in light of AGK's then-pending feedback, he also noted that no one from AGK had communicated to him that FATCO's template ADR and template RDR forms were unacceptable. (Id. at 109:22-23, 111:1-6.) Mr. Maruska testified that Comerica would not typically execute an assignment of declarant's rights or a rescission of declaration of restrictions at closing, but he did not have any concerns about the forms at that time. (Id. at 110:4-8, 112:1-3, 112:13-23.) In addition, Mr. Maruska testified that he did not think the third amendment required the assignment of declarant's rights to include anything beyond what was contemplated by the June 27 ADR. (Doc. No. 104 at 111:23-25.)

On Monday, June 28, 2010, Mr. Ferrer replied to Ms. Tresler's email saying, “Assignment of Declarant rights and rescission are ok.” (JX-70 at 1.) During his trial testimony, Mr. Ferrer recalled having reviewed the June 27 ADR, though he did not recall discussing it with Mr. Maruska or anyone else. (Doc. No. 105 at 63:18-22.) Mr. Ferrer testified that he “didn't have issues with these documents, and [he] expected that if the buyer had issues with these documents, they would convey the issues.” (Id. at 65:18-18.) Although Ms. Tresler's email stated that she was awaiting AGK's comments on the June 27 ADR and June 27 RDR, Mr. Ferrer never saw or reviewed any subsequent drafts of these documents until after the initiation of this action. (See Doc. No. 105 at 67:1-20, 68:1-9, 69:2-4, 69:8-11, 69:22-25) (Mr. Ferrer confirming that he was not included on any deal emails after June 28, 2010, did follow up with anyone at Comerica to see what happened to the deal, and did not look at the closing documents on this deal until after the initiation of this action, despite being the primary lawyer on the deal for Comerica).

The court notes that Mr. Ferrer also admitted on cross-examination that he had testified at his deposition in this action that he did not specifically recall seeing a filled-out version of the assignment of declarant's rights at any time. (Doc. No. 105 at 63:18-65:4.) Although the court acknowledges that Mr. Ferrer's deposition and trial testimony are contradictory in this regard, the court finds that, given his June 28, 2010 email approving of the June 27 ADR and June 27 RDR, it is likely Mr. Ferrer reviewed these documents at that time. (See JX-70.)

According to Mr. Ferrer's testimony, he never called attorney Pakfar or attorney Galstian following the execution of the third amendment to inquire about what should be included in the assignment of declarant's rights or revocation of the supplemental declaration provided for by the third amendment. (Doc. No. 105 at 65:8-12.)

b. Emails between FATCO andAGKon June 27-28, 2010

On June 27, 2010, Ms. Tresler also started a new email chain with only AGK parties, specifically, attorneys Pakfar and Galstian, along with Mr. Friedel. Her email read, in relevant part:

Here are the drafts of the closing documents for review and comment.
In the interest of time-I prepared the Deed as I was not aware who might be drafting the final version.
If acceptable please complete, execute those that require you [sic] signature and fax or email back to me for closing-retaining the originals for your records. . . .
I will need a copy of the buying entity partnership and related entity documents for our underwriters [sic] review.
(JX-49 at 1.)

The next day, on June 28, 2010 at 6:31 p.m. Pacific Daylight Time, attorney Galstian replied to Ms. Tresler's email, adding Mr. Murphy to the email chain but not anyone from Comerica, and stating, in relevant part:

The joint exhibit containing attorney Galstian's email simply lists a timestamp of 6:31 p.m., without explicitly listing time zone information. (JX-49 at 1.) Indeed, some of the emails contained in the joint exhibits bear Eastern Daylight Time timestamps, while others simply list a time without any identification of the time zone. (Compare JX-121 at 1 with JX-49 at 1.) The parties did not provide an explanation for this discrepancy at trial. Nonetheless, a comparison of emails that were reprinted in multiple joint trial exhibits suggests that the timestamps of emails lacking time zone descriptions are listed in Pacific Daylight Time. (See, e.g., JX-60 at 1) (email from Mr. Maruska bearing a timestamp of 20:53 p.m. Eastern Daylight Time); (JX-61 at 2) (same email from Mr. Maruska bearing a timestamp of 5:53 p.m. without time zone information). Therefore, the court concludes that attorney Galstian's email on June 28, 2010 was sent at 6:31 p.m. Pacific Daylight Time.

I attach handwritten comments to the Documentary Transfer Tax page and the Rescission of Declaration of Restrictions you circulated yesterday. I also attach an insert (in MS Word) intended to replace the relevant text currently set forth in the draft Assignment of Declarants [sic] Rights. Lastly, I attach a further updated Deed (and a redline to show changes made), which has been updated to match the relevant text to be set forth in the Assignment of Declarants Rights. Please update the Deed accordingly.
(Id.) Attached to his email was: (1) a Documentary Transfer Tax page with a handwritten edit by AGK changing the buyer entity's name from “AG Sierra de Montserrat, L.P.” (a name that FATCO had used throughout the draft closing documents it prepared) to “AGK Sierra de Montserrat, L.P.”; (2) a scanned copy of the June 27 RDR containing handwritten edits and notes made by AGK; (3) a Microsoft Word document containing new, revised language for the assignment of declarant rights (the “AGK ADR insert”); (4) a redline showing AGK's digital\ edits to FATCO's draft grant deed; and (5) a “clean” copy of the draft grant deed with AGK's edits incorporated into the document. (Id. at 3-10.)

AGK's specific edits to this document are not relevant to the disposition of this action.

For the purposes of this action, AGK's edits to the draft closing documents prepared by FATCO can be summarized as proposing two relevant changes to the deal. First, AGK's edits sought to correct the buyer's name on the closing documents. (See id. at 3.) Second, AGK's edits sought to replace the text in the June 27 ADR with modified and additional language, such that the assignment of declarant's rights would state as follows:

FOR VALUE RECEIVED, the undersigned herby grants, assigns and transfers to:
AGK SIERRA DE MONTSERRAT, L.P., a Delaware limited partnership (“Successor Declarant”), all of its right, title and interest, as Declarant, in and to the Declaration of Covenants, Conditions, Restrictions and Easements for Sierra de Montserrat, recorded with the Placer County Recorder as Document Number 2006-013195000, as modified by the First Amendment to Declaration of Covenants, Conditions, Restrictions and Easements for Sierra de Montserrat, recorded with the Placer County Recorder as Document Number 2007-0038051-00, as may be modified from time to time (collectively, the “CC&Rs”). Hereafter, the undersigned shall no longer be entitled to exercise any of Declarant's rights under the CC&Rs.
Successor Declarant hereby accepts the foregoing assignment of Declarant rights under the CC&Rs from the undersigned. Upon recordation of this instrument, all references to “Declarant” in the CC&Rs shall be deemed to refer to Successor Declarant for all purposes.
The undersigned agrees to indemnify, defend and hold Successor Declarant harmless from and against any and all loss, liability, claims or causes of action existing in favor of or asserted by any party arising out of the undersigned's position as “Declarant” under the CC&Rs on or before the date first above written. In accordance herewith, the undersigned expressly acknowledges that the undersigned shall remain responsible for all obligations, responsibilities and liabilities that accrued before the date of this assignment.
(Id. at 5). The court notes that, beginning with “AGK SIERRA DE MONTSERRAT,” every single sentence of the AGK ADR insert differed from the June 27 ADR. (See id. at 5; DX-B at 6.) Most notably, however, is the addition of the final paragraph providing that the undersigned (Comerica) would indemnify, defend and hold AGK harmless under certain circumstances (the “indemnity paragraph”). (JX-49 at 5.) At trial, attorney Galstian testified that AGK sent its edits to the June 27 ADR in the format of a Microsoft Word insert, rather than a redline, because the version of the assignment of declarant's rights that Ms. Tresler had sent was in a PDF format, and attorney Galstian could not “red line a scanned PDF against something.” (Doc. No. 102 at 142:20-143:1.) Because attorney Galstian “didn't have anything to red line against,” he and attorney Pakfar drafted the AGK ADR insert in a new document, which is what AGK “ultimately sent out here.” (Id. at 142:20-143:2; see also id. at 138:4-13.)

In drafting the AGK ADR insert, both attorneys Galstian and Pakfar testified that it was their intent for the indemnity paragraph to be “as broad as possible.” (Id. at 140:1-3; Doc. No. 101 at 56:24.) Attorney Galstian also testified that they intended for the text “on or before the date first above written” to relate to Comerica's position as the declarant, such that “any claim arising, or asserted by anyone while Comerica was the declarant, up until the date it was no longer declarant, would be a claim that is-that they indemnify [AGK] over, even if the filing of the claim happens whenever.” (Doc. No. 102 at 140:21-141:5.) In addition, their “idea” behind the language “shall remain responsible” in the indemnity paragraph “was that anything that accrued during Comerica's period as the declarant, would be within the indemnity.” (Id. at 141:12-14.) Similarly, attorney Pakfar testified that “we were intending to have [Comerica] indemnify our client for anything that arises out of [the declarant] issue[,] . . . their position as declarant prior to assigning it to us” such that “[a]nything that pertained to whether or not Comerica was declarant, would be covered.” (Doc. No. 101 at 56:15-18, 56:25-57:1.) Attorney Pakfar also testified that it was their intent, for example, that “[i]f AGK's not the declarant after the date hereof because there wasn't an effective assignment, that would be covered,” and HOA and community related issues would similarly be covered, because if Comerica was “not the declarant, they couldn't have assigned it to us [AGK], then we're not the declarant, then we don't have control of the board, then we have problems.” (Id. at 57:5-15.)

When asked why he did not include anyone from Comerica on his response to Ms. Tresler attaching AGK's proposed closing document revisions, attorney Galstian testified that he “didn't think of including Comerica” because “all [he] did was hit ‘reply all.” (Doc. No. 102 at 137:58.) Attorney Galstian further testified that he “was just continuing on this [email] chain, to which, no seller group was a party, and as an ancillary matter, I had really very little luck in dealing with the seller side in terms of communications.” (Id. at 143:9-12.) According to attorney Galstian, Comerica was not “really responsive” and AGK was “having a lot of difficulty in getting through with them.” (Id. at 143:14-17, 135:21-136:3.) He “expressed frustration to Ms. Tresler on this issue,” and she “said that she was in in touch with the seller side.” (Id. at 143:14-20, 135:21136:3.) Because “[s]he wasn't having the same [communication] problems,” Ms. Tresler “agreed to facilitate . . . the closing of the transaction by being the go-between.” (Id. at 143:18-20.) Accordingly, attorney Galstian expected that Ms. Tresler would “literally, press forward and send [his June 28, 2010 email response attaching AGK's edits to the draft closing documents] to the seller group.” (Id. at 143:6-7.) With the expectation that Ms. Tresler would directly forward his email to Comerica, attorney Galstian “took care in drafting” the email and “wanted it to be very detailed.” (Id. at 136:4-7.)

The court observes that although attorney Galstian may have hit “reply all” on Ms. Tresler's June 27, 2010 email to AGK, it appears that attorney Galstian did in fact add Mr. Murphy- whom Ms. Tresler had not included in her June 27, 2010 email to AGK-as a recipient on the email chain. (See JX-49 at 1.) However, there is no evidence before the court suggesting that attorney Galstian's decision not to add Comerica representatives to this email chain was nefarious in any way, particularly in light of the fact that both AGK and Comerica responded to Ms. Tresler's separate June 27, 2010 emails to the parties without copying the opposing side of the deal on their responses. (See JX-70 at 1.) Indeed, Mr. Maruska testified at trial that he “understood Ms. Tresler was acting as the go-between for closing documents in the last few days of the transaction” and that “at the very end” of the transaction, Ms. Tresler would ask questions of each side separately, and Comerica would respond to her inquiries without copying AGK. (Doc. No. 104 at 177:5-8; 169:8-170:3, 176:12-20.) Therefore, the court does not infer ill-intent from either AGK's or Comerica's decisions not to copy the opposing party on their responses to Ms. Tresler's separate June 27, 2010 emails to each side.

It remains unclear to the court whether AGK and Comerica had explicitly discussed a provision such as the indemnity paragraph up until this point in their deal negotiations. As described above, attorney Pakfar testified that he was under the impression throughout the negotiations over the deal that any assignment of declarant rights entered into by the parties would necessarily include an indemnity provision. (See, e.g., Doc. No. 101 at 138:7-10, 161:3 10.) However, as also noted above, Mr. Friedel's and Mr. Murphy's trial testimony suggests that they did not view an indemnity provision as inherent to an assignment of declarant's rights as a matter of course; rather, as the deal progressed, it became clear to them that AGK would require some sort of indemnification from Comerica in order to close on the deal. (See, e.g., Doc. No. 102 at 95:12- 22, 97:1-11) (Mr. Murphy explaining his impression that if AGK had received the price reduction it requested from Comerica, AGK would have closed with just the reduction and an assignment of declarant rights, but when that price reduction was not granted, AGK at that point also “required a release and/or indemnity”); (Doc. No. 103 at 26:16-23, 27:2-7) (Mr. Friedel explaining the same). Based on this testimony, it is apparent that AGK engaged in internal discussions surrounding indemnification prior to June 28, 2010, the date of attorney Galstian's email with the AGK ADR insert.

Notwithstanding these internal discussions, the evidence before the court is mixed with regard to AGK's discussions with Comerica surrounding possible indemnification. At trial, Mr. Maruska testified that as of June 25, 2010, he had not discussed Comerica indemnifying AGK with anyone at AGK, and up through the close of the deal, no one at AGK had informed him that AGK would not close without an indemnification. (See Doc. No. 104 at 100:22-25, 117:5-8, 120:8-11.) Similarly, Mr. Ferrer testified that he did not have a discussion with attorney Pakfar about indemnity at any time during deal negotiations, and he would have remembered if they had discussed the topic, because it was Comerica's position that the sale of Sierra de Montserrat would be “as is, where is” with “no representations or warranties.” (Doc. No. 105 at 34:14-35:4.) By contrast, Mr. Murphy stated at trial that, after it became clear that AGK would not receive the full price reduction it requested and Comerica would not settle with Westwood, Mr. Murphy “believe[s]” he “made it clear” to Mr. Maruska and Mr. Chamberlain that AGK would require Comerica to indemnify it in order to close the deal, though he couldn't “remember exactly how it was phrased or in what context.” (Doc. No. 102 at 98:16-101:4.) More specifically, he testified as follows:

The specific phrasing of Mr. Maruska's testimony in this regard leaves open the possibility that he discussed the possibility of Comerica indemnifying AGK internally with others at Comerica.

In this instance, I'm sure I was having conversations with the bank and the broker, Steve Chamberlain, related to [AGRE]'s requirement to get an indemnity in there. I don't recall specifics of conversations with the bank or with Steve Chamberlain. My most vivid recollection was talking to [attorney Pakfar], related to the indemnity, and he was saying that the bank was pushing back on the indemnity. I also-it was related at the time to title insurance, that First American was having heartburn . . . related to the [revocation of the Supplemental Declaration]. So certain things in this deal are etched in my mind forever. . . . [including] my conversations with [attorney Pakfar], because I recall specifically I was on vacation in Tahoe, and I never forget pacing the deck of that home we rented, and talking to [attorney Pakfar] about how the bank was pushing back on the indemnity, and First American was pushing back on our title insurance.
(Doc. No. 102 at 64:14-65:6.) Mr. Murphy testified that conversations regarding indemnity occurred after June 25, 2010, and his conversation with attorney Pakfar while on vacation in Tahoe would have happened “late in June” 2010, “very close to the final date, . . . because again, I was very concerned we wouldn't have enough time to address the issue if the bank was pushing back on the indemnity.” (Id. at 66:17-20; 65:21-66:7.) It is not apparent from the evidence presented at trial what precisely Mr. Murphy meant when he referred to FATCO “pushing back” on AGK's title insurance, but as the court has described above, on June 25, 2010, FATCO did question why AGK felt Comerica would have the authority to execute a revocation of the Supplemental Declaration, but this issue appeared to have been resolved that same day. (See JX-45 at 1-2.) Therefore, if the conversations described in Mr. Murphy's testimony took place, it appears likely that they occurred on and/or perhaps shortly after June 25, 2010. Similarly, Mr. Murphy also testified as to his belief that (at some unspecified time) attorney Pakfar communicated to Comerica that without indemnity, AGK would not close on the deal. (Doc. No. 102 at 99:15-18.) Attorney Pakfar testified that prior to June 28, 2010, he recalls “generally speaking [with Comerica] about how [the declarant issue] is not a risk that we could take” and how AGK “would need Comerica to . . . assume the risk somehow,” but he did not recall whether he specifically discussed indemnity with Mr. Ferrer, due to Ferrer's limited communication. (Doc. No. 101 at 48:15-23, 49:1-5.) Instead, it was attorney Pakfar's understanding that the indemnity was something “our side had discussed with their side, via [Mr. Murphy].” (Doc. No. 101 at 49:3-5.) Thus, there was conflicting testimony presented at trial in this regard, which may be attributable to the unfortunate nearly-twelve-year gap between the deal negotiations and the trial of this action. As a result, and in any event, the court is ultimately not persuaded that, prior to attorney Galstian's June 28, 2010 email to Ms. Tresler attaching the AGK ADR insert, anyone at AGK spoke with anyone at Comerica regarding the possibility of Comerica indemnifying AGK with respect to the declarant's rights issue.

Attorney Pakfar also testified that no one at Comerica ever communicated to him that the bank would not enter into an agreement providing for an indemnification provision and that he did not discuss the bank's internal policies with anyone at Comerica. (Doc. No. 101 at 58:10-18.)

Mr. Friedel testified that he never communicated to anyone at Comerica that such an indemnity provision was a condition precedent for AGK to close on the deal. (Doc. No. 103 at 42:21-23.) Friedel's testimony in this regard is not inconsistent with other testimony or evidence admitted at trial, and the court thus concludes that Mr. Friedel did not personally discuss such an indemnification provision with anyone at Comerica at any point prior to the close of this deal.

In commenting on the progression of the deal and AGK's insertion of the indemnity paragraph into the AGK ADR insert relatively late in the deal's lifecycle, attorney Pakfar testified:

If Comerica a week before would have let us draft the [assignment of declarant rights], I can assure you, it would have been much more robust. It would have had all kinds of reps and warranties and an indemnity, and Comerica would have had a week to negotiate. . . . So what was going on through my mind was . . . nobody wants to close a deal like this. We would want to do a normal exchanging of drafts at an earlier date, carefully going through a law firm prepared form of assignment. We were doing things this way because of Comerica. This is how they wanted it done.
(See Doc. No. 101 at 136:25-137:7, 138:3-6, 139:5-12.) According to attorney Pakfar, in drafting the AGK ADR insert, AGK was “just commenting as requested and [AGK] expected Comerica to comment and do legal review” in return. (Doc. No. 101 at 58:23-25; see also id. at 140:9-10, 49:14-18.)

c. Buyer Entity Name Change

On June 28, 2010-a few hours before attorney Galstian sent Ms. Tresler his email attaching AGK's edits to the proposed closing documents and the AGK ADR insert-the parties also engaged in a separate email conversation pertaining to the proper name of the buyer entity. (See JX-121.) As noted above, the draft closing documents Ms. Tresler had transmitted to the parties on June 27, 2010 referred to the buyer as “AG Sierra de Montserrat, L.P.,” and the PSA was between Comerica and AGRE. (See generally JX-27, DX-B, JX-49.)

On June 28, 2010, AGRE and AGK entered into an Assignment and Assumption of Purchase and Sale Agreement whereby AGRE assigned its interest in the PSA to AGK. (JX-100 at 1-3.) Thereafter, attorney Pakfar started a new email chain with Ms. Tresler, Mr. Maruska, and Mr. Ferrer in the “to” field, and attorney Galstian, Mr. Murphy, and Mr. Friedel in the “cc” field (“buyer name change email”). (JX-121.) Attorney Pakfar attached to that email the executed Assignment and Assumption of Purchase and Sale Agreement, explaining that the document assigns “Buyer's rights under the PSA to the specially formed joint venture entity beneficially owned by AG and Kinetic (and their affiliates).” (Id. at 1.) He instructed the email recipients to “please note the new Buyer entity name for all purposes going forward.” (Id.)

Based on the evidence presented at trial, after attorney Pakfar sent the buyer name change email on the afternoon of June 28, 2010, Mr. Ferrer was not included as a recipient on any further deal-related communications, despite Ms. Tresler having informed Mr. Ferrer the previous day that she was still awaiting AGK's comments on the June 27 ADR and June 27 RDR. (See Doc. No. 105 at 68:16-69:4; JX-70 at 2.)

6. Execution and Recording of Closing Documents

Less than five minutes after attorney Pakfar sent the buyer name change email, Ms. Tresler emailed Mr. Maruska informing him that she was in the process of correcting the buyer's name on the closing documents. (JX-72 at 3.) She attached a revised version of the deed “[t]o make sure this gets executed in time” and stated that she would “make the changes to the rest and send them back out.” (Id. at 3-4.) Mr. Maruska requested that Ms. Tresler resend any closing documents that needed to be signed with Karen Balmer, who assisted Mr. Maruska with deal closings, being copied on the email. (JX-72 at 2; Doc. No. 104 at 119:4-18.) According to Mr. Maruska, Ms. Balmer would print documents for him to sign, flag the execution lines, print FedEx labels, and ship closing documents, “especially when time frames were tight,” such as in this deal. (Doc. No. 104 at 119:14-20.) At trial, Mr. Maruska testified that he did not instruct Ms. Tresler to copy Mr. Ferrer on the closing documents because he thought the documents Mr. Ferrer had previously reviewed were “the final documents” and that negotiations had concluded. (See Doc. No. 104 at 170:11-20.) This is despite the fact that in her June 27, 2010 email that he received Ms. Tresler had stated she was still awaiting comments to those same documents from the buyer.

The buyer name change email (JX-121 at 1) bears a 17:09 p.m. Eastern Daylight Time timestamp, whereas Mr. Tresler's email (JX-72 at 3) was sent at 2:13 p.m. Pacific Daylight Time. (See also Doc. No. 100 at 78:15-20.) At that time, attorney Galstian had not yet sent Ms. Tresler the email containing AGK's comments on the closing documents and the AGK ADR insert, which, as described above, was sent at June 28, 2010 at 6:31 p.m. Pacific Daylight Time. (See JX-49 at 1.)

On Tuesday, June 29, 2010, Ms. Tresler emailed Mr. Maruska and Ms. Balmer new versions of the closing documents, which incorporated AGK's changes. (JX-72 at 1.) The body of her email read, “Here you go-these will need to arrive at the earliest overnight delivery you can send them in order to close tomorrow.” (Id.) Her email included nine attachments of closing documents. (Id.) All of the attachments bore the word “new” at the start of the file name, including the attachment “New Assign Dec Rights,” which had been revised to include the language from the AGK ADR insert, including the indemnity paragraph (“final ADR”). (Id. at 1, 8.) The attachments also included a revised version of the June 27 RDR, labeled “New Recission [sic]” (“final RDR”). (Id. at 1, 28.) Apart from relabeling all the attachments with the word “new,” Ms. Tresler did not otherwise describe in her email any changes that had been made to the closing documents. (See id. at 1; DX-B.)

The body text of the final RDR stated that “The undersigned owner as Declarant hereby rescinds, cancels and revokes all those Covenants, Conditions and Restrictions contained in that [Supplemental Declaration].” (JX-72 at 28.)

At trial, Mr. Maruska testified that he noticed that the attachments were all described as “new,” but he assumed that this denotation was only added to reflect the change to the buyer's name-despite the fact that some of the closing documents labeled “new” did not even include the buyer's name in them. (See Doc. No. 104 at 119:21-120:1, 172:12-20, 175:13-16; JX-72 at 6, 18.) Because no one specifically notified him as to any other changes to the closing documents, Mr. Maruska then signed the documents, including the final ADR and final RDR, without reading them or sending them to Mr. Ferrer for approval. (Doc. No. 104 at 175:25176:11.) Although the June 27 ADR was only one paragraph long, and the final ADR was three paragraphs long with the indemnity paragraph just above his signature line, Mr. Maruska testified that he nonetheless did not notice the changes to the final ADR:

On June 30, 2010, Ms. Balmer emailed Ms. Tresler an executed copy of a form authorizing Mr. Maruska to sign instruments on Comerica's behalf. (JX-73 at 1, 6.)

I had a lot of other duties. I [knew] it was one page. . . . if it turned into three pages, I probably would have noticed it, but with it just being one page, I did not see the subsequent two paragraphs. It was about the same size.
(Doc. No. 104 at 173:12-25.)

AGK has suggested that Mr. Maruska in fact noticed the indemnity paragraph in the final ADR but made a “business decision” that it was fine to nonetheless sign the final ADR, motivated by the time pressure he felt to close the deal by June 30, 2010. (See, e.g., Doc. No. 104 at 182:20183:1.) Mr. Maruska denied this suggestion at trial. (Id. at 183:2.) The court need not and does not resolve this credibility determination. However, it does appear plausible to the court that Mr. Maruska did not notice the new indemnity paragraph in the final ADR.

Because the final ADR contained substantive modifications from the June 27 ADR that Mr. Ferrer had reviewed, under Comerica's internal policies, Mr. Maruska should have forwarded the final ADR to Mr. Ferrer for his approval prior to signing. (Doc. No. 105 at 67:11-20.) In addition, Mr. Maruska testified that he would not have had authority to agree to an indemnification of any kind in favor of a buyer; instead, the department head and legal team would have had to authorize such a provision. (Doc. No. 104 at 75:4-21.)

The final ADR and final RDR were recorded in Placer County on June 30, 2010. (See JX-51 at 1; JX-103 at 1.) Mr. Maruska never sent Mr. Ferrer the closing documents, and Ferrer never followed up to inquire about what had happened with regard to AGK's comments on the June 27 ADR or with the closing of the deal more generally. (See Doc. No. 105 at 67:21-68: 9.) Attorney Pakfar testified that because Comerica is a “sophisticated party,” AGK assumed Comerica read and agreed to the indemnity paragraph set out in the final ADR. (Doc. No. 101 at 140:9-15.) Attorney Pakfar did not think it was AGK's “job” to suggest to Comerica that they might not want to agree to such the indemnity provision, just as Comerica did not caution AGK about agreeing to portions of the PSA that were unfavorable to AGK. (Id. at 138:17-139:4, 140:10-15.)

D. Post-Sale Litigation with Mr. Westwood

Following Comerica's sale of Sierra de Montserrat to AGK, Mr. Westwood brought several lawsuits against AGK, its owners, and/or other individuals affiliated with Sierra de Montserrat. (See, e.g., JX-117, JX-118, JX-119, JX-134.) Two of these lawsuits are relevant to this action: (1) Westwood Montserrat, LTD v. AGK Sierra de Montserrat et al., No. S-cv-0029131, initiated in the Placer County Superior Court on May 2, 2011 (the “Kincade Action”); and (2) Westwood Montserrat, LTD v. AGK Sierra de Montserrat, L.P. et al., No. S-cv-0032447, initiated in the Placer County Superior Court on January 25, 2013 (the “Murphy Action”), (collectively, the “Westwood litigation”). (See JX-6; JX-118.)

At the trial before this court, attorney Gorry testified as a witness on the issue of the attorneys' fees that AGK had accrued in the Westwood litigation. Attorney Gorry further testified that Mr. Westwood additionally filed some “ancillary” lawsuits that were dismissed, as well as a lawsuit that Mr. Westwood filed against AGK to enforce covenants on behalf of the Wildlife Heritage Foundation. (Doc. No. 103 at 57:20-58:1, 58:20-22; JX-117.) AGK does not seek indemnification from Comerica for its expenses incurred in defending against those lawsuits, nor does AGK argue that those lawsuits fall within the scope of the indemnity paragraph of the final ADR. (See Doc. No. 103 at 58:12-25.)

1. The Kincade Action

The Kincade Action was brought by Westwood against defendants AGK, the Sierra de Montserrat HOA, and Robert and Jennielyn Kincade, individuals who had purchased unimproved lots at Sierra de Montserrat. (JX-6 at 2; Doc. Nos. 103 at 59:6-10; 104 at 5:22-6:1.) At trial, the parties did not dispute that the Kincade Action was eventually submitted to arbitration and bifurcated into two phases. (Doc. No. 103 at 61:12-17.) The first phase of the arbitration pertained to whether Westwood or AGK was the declarant of Sierra de Montserrat, and the arbitrator determined that Westwood was the declarant. (Id. at 61:22-25, 62:11-18.) The second phase of the arbitration pertained to whether certain building design elements-such as spiked fence caps, chimney caps, front doors, and drainage management measures-that AGK and the Kincades sought to implement violated design guidelines and the CC&Rs. (Id. at 63:1-14, 64:14.)

AGK agreed to indemnify the Kincades and provided the Kincades with a defense in the Kincade Action. (Doc. No. 104 at 7:12-14.) Attorney Gorry testified that it was his understanding that AGK decided to defend the Kincades in part because “the underlying claims all arose from [Mr. Westwood's] declarant status.” (Doc. No. 104 at 8:3-13.) Similarly, in AGK's closing argument at the trial of this action, AGK asserted that it indemnified the Kincades because “all of the arguments, all of the law, everything was the same” between AGK's defense and the Kincades' defense. (Doc. Nos. 103 at 63:18-22; 105 at 106:2-6.) AGK represents that it incurred $1,000,331.09 in legal fees and costs in connection with its defense (both on its own behalf and on the Kincades' behalf) in the Kincade Action. (Doc. No. 103 at 78:11-12; JX-108; JX-109). At the trial of this case, attorney Gorry testified that AGK received an attorneys' fee award in the Kincade Action for its fees incurred in defending the Kincades (but not as to its own fees), but that AGK has been unable to collect upon that award. (Doc. No. 104 at 45:10-20.)

2. The Murphy Action

The Murphy Action was initially brought by Westwood against AGK, Colliers International, Mr. Murphy, and Mr. Chamberlain, but Westwood's fourth amended complaint in that action named AGK, Mr. Murphy, AGRE, Kinetic Homes, FATCO, and Kinetic Partners, Inc. as defendants. (JX-118, JX-142; Doc. No. 103 at 69:5-6.) The parties do not dispute that the Murphy Action pertained to Mr. Westwood's attempt to exercise his purported rights under the Supplemental Declaration to repurchase certain lots at Sierra de Montserrat for a reduced price. (See Doc. No. 103 at 68:21-25.)

Attorney Gorry testified at the trial in this action that FATCO felt as though some, but not all, of the claims in the Murphy Action were covered by the title insurance FATCO provided AGK. (Doc. No. 104 at 45:21-20.) FATCO assigned the law firm Steyer Lowenthal Boodrookas Alvarez & Smith (“Steyer Lowenthal”) to defend the claims FATCO had “accepted on tender under the title insurance policy” such that Steyer Lowenthal served as co-counsel with AGK's counsel in the Murphy Action. (Doc. No. 103 at 73:23-74:2.)

After AGK and AGRE prevailed at a bifurcated bench trial in the Murphy Action, the Murphy Action continued as to defendants Mr. Murphy, Kinetic Homes, and Kinetic Partners, Inc., until they eventually settled with Westwood. (Doc. No. 104 at 26:3-27:3.) AGK provided the legal defense for Mr. Murphy, Kinetic Homes, and Kinetic Partners, Inc., because AGK considered Mr. Murphy and the Kinetic entities to be part of the AGK “umbrella.” (See Doc. No. 105 at 32:24-33:2; 105 at 106:11-19.) AGK states in this action that it incurred $1,377,345.75 in legal fees and costs in connection with its defense (including the legal fees incurred by Steyer Lowenthal and fees incurred in defending Mr. Murphy, Kinetic Homes, and Kinetic Partners, Inc.) in the Murphy Action. (Doc. No. 103 at 78:11-12). At the trial in this case, attorney Gorry testified that AGK received an attorneys' fee award in the Murphy Action, but that AGK has, once again, been unable to collect upon that award. (Doc. No. 104 at 45:1420.)

Attorney Gorry testified that AGK's legal fees also included fees for AGRE, noting that AGK and AGRE were “both being represented under the [same] umbrella” while they were involved in the Murphy Action. (Doc. No. 104 at 24:9-14, 33:3-17.)

E. The Present Litigation

On April 17, 2015, AGK sent Comerica a demand letter seeking indemnification for the attorneys' fees it incurred in the Westwood litigation. (Doc. No. 103 at 79:17-80:16; JX-105.) One week later, Comerica sent a written response indicating that it would not indemnify AGK for the Westwood litigation. (Doc. No. 84 at 4; JX-106.)

On April 29, 2015, AGK initiated this action against Comerica in the Placer County Superior Court, asserting claims for breach of contract and declaratory relief. (Doc. No. 1 at 5.) On June 15, 2015, Comerica removed this action to this federal court on the basis of diversity jurisdiction pursuant to 28 U.S.C. § 1441. (Doc. No. 1 at 1.)

The parties do not dispute that Comerica is a corporation incorporated in Texas with its principal place of business in Texas, nor that AGK is a limited partnership incorporated in Delaware with its principal place of business in New York. (See Doc. No. 1 at 2, 5; see also JX-26 at 4; JX-100 at 1.)

AGK seeks indemnification from Comerica to cover its fees and costs incurred in the Westwood litigation and in this action. (See Doc. Nos. 1 at 9-10; 110 at 12, 18.) As of the first day of trial in this case, attorney Gorry testified that AGK's fees and costs in this action totaled $1,143,481.24. (Doc. No. 103 at 84:13-16.) In its post-trial briefing, AGK provided an updated figure of “at least” $1,146,337.24. (Doc. No. 110 at 19.) Thus, AGK seeks a total amount of $5,246,469.11 in damages and prejudgment interest, comprised of: (1) $1,000,311.09 in attorneys' fees and costs from the Kincade Action, (2) $1,377,345.75 in attorneys' fees and costs from the Murphy Action, (3) $1,146,337.24 in attorneys' fees and costs from this action, and (4) $1,722,475.03 in prejudgment interest. (See Doc. No. 110 at 12, 19, 27.)

In addition, AGK seeks declaratory relief in the form of “the parties' respective indemnity rights and obligations” under the final ADR. (Doc. No. 1 at 10; Doc. No. 105 at 108:9-13.) Because of AGK's expressed view that “[t]he likelihood of litigation [with] Mr. Westwood is still real and present,” AGK asserts that “[i]t is vital if the Court finds that the indemnity obligation from Comerica is proper, and enforceable, then the Court must find that it's continuing.” (Doc. No. 105 at 108:11-13.)

CONCLUSIONS OF LAW

A. AGK's Breach of Contract Claim

In order to prove a breach of contract under California law, a party must show: (1) the existence of a contract; (2) plaintiff's performance under the contract or excuse for nonperformance; (3) defendant's breach; and (4) resulting damages to the plaintiff. Oasis W. Realty, LLC v. Goldman, 51 Cal.4th 811, 821 (2011).

The agreement at issue in this breach of contract action is the final ADR, which contains the indemnity paragraph. The parties do not dispute the fact that Mr. Maruska signed and executed the final ADR on Comerica's behalf. (See, e.g., Doc. Nos. 110 at 8-9; 116 at 20.) The parties also do not dispute that only Comerica was required to sign the final ADR and that Mr. Maruska was authorized to sign closing documents on this deal on Comerica's behalf. (See JX-73; Doc. Nos. 110 at 8-9; 116 at 20.) Therefore, the court concludes that absent proof of an applicable defense, the final ADR is a valid, binding contract.

1. Comerica's Affirmative Defense of Unilateral Mistake

Comerica raises the doctrine of unilateral mistake as an affirmative defense to the validity of the final ADR. As the party asserting this defense, Comerica must offer clear and convincing evidence to prove its defense of unilateral mistake. See Grief v. Sanin, 74 Cal.App. 5th 412, 442 (2022) (recognizing that defendant bore the burden of proving the defense of unilateral mistake by “clear, convincing and satisfactory” evidence); see also Century Sur. Co. v. Weir Bros. Const. Corp., No. 3:14-cv-00687-WQH-NLS, 2015 WL 1608874, at *9 (S.D. Cal. Apr. 9, 2015).

Under California law, a party to a contract may rescind the contract if that party's consent was given by mistake. Cal. Civ. Code § 1689(b)(1). “A mistake that gives rise to rescission may be either a mistake of law or a mistake of fact. See Est. of Eskra, 78 Cal.App. 5th 209, 221 (2022). A mistake of fact-which is the defense Comerica asserts here-is defined as “a mistake, not caused by the neglect of a legal duty on the part of the person making the mistake, and consisting in [a]n unconscious ignorance or forgetfulness of a fact past or present, material to the contract.” Cal. Civ. Code § 1577. “A factual mistake by one party to a contract, or unilateral mistake, affords a ground for rescission in some circumstances.” Donovan v. RRL Corp., 26 Cal.4th 261, 278 (2001). “Unilateral mistake is ground for relief where the mistake is due to the fault of the other party or the other party knows or has reason to know of the mistake.” Architects & Contractors Estimating Servs., Inc. v. Smith, 164 Cal.App.3d 1001, 1007-08 (1985).

Even where a plaintiff has no reason to know of and does not cause a defendant's unilateral mistake of fact, a defendant may obtain rescission of the contract by establishing the following facts: “(1) the defendant made a mistake regarding a basic assumption upon which the defendant made the contract; (2) the mistake has a material effect upon the agreed exchange of performances that is adverse to the defendant; (3) the defendant does not bear the risk of the mistake; and (4) the effect of the mistake is such that enforcement of the contract would be unconscionable.” Donovan, 26 Cal.4th at 282.

a. Unilateral Mistake Caused by AGK

First, Comerica argues that it is entitled to partial recission of the final ADR under the contractual doctrine of unilateral mistake because its “mistake was caused by AGK's failure- intentional or otherwise-to notify Comerica that it had asked the escrow officer to insert an indemnity provision in favor of AGK.” (Doc. No. 89 at 24.) Comerica asserts that Mr. Maruska was mistaken as to the contents of the final ADR, specifically the inclusion of the indemnity paragraph, because he assumed that the final ADR “was identical to the document both he and [Mr.] Ferrer had reviewed and approved the previous day,” that is, the June 27 ADR. (Id.) According to Comerica, Mr. Maruska signed the final ADR under the mistaken belief that the final ADR was not substantively different from the June 27 ADR and did not contain any sort of indemnity provision. (See id.)

Comerica's arguments in this regard are not supported by the evidence presented at trial. There is simply no evidence-let alone clear and convincing evidence-that AGK was at fault for Comerica's mistake or had reason to know of Comerica's mistake. As the court has described above, the evidence admitted at trial establishes that attorney Galstian explicitly flagged AGK's ADR insert when he emailed it to Ms. Tresler, expecting her to “press forward and send” his email directly to Comerica. (JX-49 at 1; Doc. No. 102 at 143:6-7.) In addition, both AGK and Comerica understood that Ms. Tresler was serving as the “go-between” for the parties during the final days of the deal, and indeed, FATCO's role as an intermediary on the drafting and exchange of the assignment of declarant's rights was at Comerica's specific request. (Doc. Nos. 102 at 68:2-5, 143:18-20; 104 at 177:5-8, 169:8-170:3, 176:12-20; 101 at 30:4-10, 35:23-25, 139:1112.) The court also finds persuasive attorney Pakfar's testimony that AGK expected Comerica, a “sophisticated party,” to “read[] and review[]” the final ADR, especially in light of Mr. Maruska's June 25, 2010 email instructing Ms. Tresler to send him completed closing documents for “final blessing by our legal counsel.” (Doc. No. 101 at 140:2-15; JX-46 at 1.) Given that AGK reasonably expected Comerica to read and review the final ADR, it follows that AGK reasonably believed that Comerica knew and approved of the indemnity paragraph once the final ADR was signed and recorded in Placer County without any indication that Comerica had any issue with the final ADR. (See Doc. No. 101 at 138:16-139:4) (attorney Pakfar testifying that in his experience parties sometimes agree to one-sided indemnities without negotiation and explaining that AGK agreed to a one-sided indemnity in Comerica's favor in the PSA without commenting on that provision before signing). Indeed, there is no evidence before the court that Comerica ever communicated anything to AGK that would suggest that Mr. Maruska was unaware of the indemnity paragraph in the final ADR. (JX-51.) Instead, the evidence presented at trial, even construed in the light most favorable to Comerica, suggests that Mr. Maruska's mistake was borne from his failure to read the final ADR prior to signing, despite the fact that Ms. Tresler's email attaching the June 27 ADR stated that she was “await[ing] the buyer's comments” on the document and her email attaching the final ADR labeled the attachment as “New Assign Dec Rights.” (JX-70 at 2; JX-72 at 1.)

The court will assume arguendo that Mr. Maruska indeed mistakenly thought the final ADR he signed was substantively identical to the June 27 ADR. Because the court determines that Comerica has not satisfied its burden of proof as to the affirmative defense of mistake, the court need not and does not make any factual determination as to whether Mr. Maruska had not noticed the indemnity paragraph in the final ADR before signing it or whether Mr. Maruska made a conscious “business decision” to sign the final ADR despite the inclusion of the indemnity paragraph.

Therefore, the court concludes that Comerica has failed to establish that it is entitled to partial recission of the final ADR due to a unilateral mistake that was the fault of AGK.

b. Unilateral Mistake Not Caused by, or known to, AGK

Second, Comerica argues that it is entitled to partial recission of the final ADR even if its mistake was not caused by AGK. (See Doc. Nos. 89 at 24; 116 at 12.) To prevail on this defense, Comerica must prove that: (1) Comerica “made a mistake regarding a basic assumption upon which” it contracted with AGK to sell Sierra de Monsterrat; (2) “the mistake has a material effect upon the agreed exchange of performances that is adverse to” Comerica; (3) Comerica “does not bear the risk of the mistake”; and (4) the effect of Comerica's “mistake is such that enforcement of the contract would be unconscionable.” See Donovan, 26 Cal.4th at 282. Comerica must establish each of these requisite facts, often referred to by California courts as the “ Donovan factors,” by clear and convincing evidence. See Grief, 74 Cal.App. 5th at 442.

The court concludes that Comerica has established only the first two required factors in support of this type of unilateral mistake defense. As described in the court's findings of fact, Comerica introduced ample testimony at trial in support of the proposition that Comerica intended for the sale of the Sierra de Monsterrat lots to be “as is, where is.” (See Doc. Nos. 104 at 56:18-57:6, 74:10-17; 105 at 34:17-18; see also JX-27 at 13.) It thus follows that the alleged mistake here-Mr. Maruska's ignorance as to the inclusion of an indemnity provision favoring AGK in the final ADR-pertains to a basic assumption upon which Comerica made the contract. In Mr. Maruska's own words, such a provision “would be the complete opposite” of finality and “would open the door for nonfinality” in the transaction because it would introduce “contingent liability after the sale.” (See Doc. No. 104 at 74:5-17.) Moreover, an indemnity provision in favor of AGK that opens Comerica up to the risk of post-sale liability certainly has a “material effect upon the agreed exchange of performances” between the parties in this ostensibly “as is, where is” sale, and that effect is adverse to Comerica.

With regard to the third Donovan factor-that the defendant does not bear the risk of the mistake-the California Supreme Court has explained that “the risk of a mistake must be allocated to a party where the mistake results from that party's neglect of a legal duty.” Donovan, 26 Cal.4th at 283. More specifically, “[a] party bears the risk of mistake when . . . he is aware, at the time the contract is made, that he has only limited knowledge with respect to the facts to which the mistake relates but treats his limited knowledge as sufficient.” Id. (citing Rest. 2d Contracts, § 154). It is “well established” that under this third Donovan factor, “in the absence of fraud, overreaching, or excusable neglect, that one who signs an instrument may not avoid the impact of its terms on the ground that he failed to read the instrument before signing it.” Stewart v. Preston Pipeline Inc., 134 Cal.App.4th 1565, 1588 (2005) (citing Hulsey v. Elsinore Parachute Ctr., 168 Cal.App.3d 333, 339 (1985)); see also Rosenfeld v. JPMorgan Chase Bank, N.A., 732 F.Supp.2d 952, 965 (N.D. Cal. 2010) (noting that a party “has a duty to read the terms of a contract before signing”).

Comerica argues that Mr. Maruska's failure to read the final ADR prior to signing was “based upon the reasonable belief that, except for the name of the buyer, it was the very same Assignment that had been carefully reviewed and approved by [Mr.] Maruska and Comerica's counsel the previous day [the June 27 ADR].” (Doc. No. 116 at 20.) Therefore, Comerica asserts that Mr. Maruska exhibited only “excusable neglect” by failing to read the ADR. (Id.)

In support of its argument, Comerica points to the decision in Reidv. Landon, 166 Cal.App. 2d 476 (1958), in which the court rescinded a contract even though the defendant had read the contract, including the provision in question, before signing it. (See Doc. No. 116 at 20.) But Comerica's attempt to compare the facts of this case to those of Reid is unavailing. In Reid, the defendant had agreed to give the plaintiffs a right of first refusal in the event the defendant decided to sell certain real property. Reid, 166 Cal.App. 2d at 479. After the defendant's attorney prepared the agreed-upon right of first refusal, the plaintiffs, without the defendant's knowledge, told the defendant's attorney that the defendant had agreed that the plaintiffs would have an option to buy the property, rather than the plaintiffs having only the right of first refusal. Id. at 479-80. Relying on the plaintiffs' word, and without advising or consulting his client, the defendant's attorney drew “a new letter agreement” that gave the plaintiffs an option to buy the property. Id. at 480. The plaintiffs then presented the document to the defendant for her signature, and she read the document, saw the word “option,” and assumed that “option” referred to the right of first refusal that the parties had originally discussed, and signed the document. Id. The court in Reid held that this evidence justified rescinding the contract, noting that rescission may be warranted where the mistake in question “does not amount to the neglect of a legal duty,” particularly “in a situation in which false representations were made to induce the execution of the instrument.” Id. at 482, 484.

Here, unlike in Reid, there was no evidence presented at trial supporting a conclusion that AGK attempted to conceal the indemnity paragraph or induce Mr. Maruska to sign the final ADR under false pretenses. In addition, when taken together, several facts established by the evidence at trial indicate that Mr. Maruska's failure to read the final ADR or notice the indemnity paragraph stemmed solely from an error in his own judgment: in her email attaching the June 27 ADR, Ms. Tresler informed Mr. Maruska that she was awaiting AGK's comments on the document (a document which Mr. Maruska well knew needed to be “in form and substance” acceptable to AGK pursuant to third amendment and upon which Comerica had not yet heard any feedback or comment from AGK); in her email attaching the final ADR, Ms. Tresler labeled the attachment as “New”; the final ADR was significantly longer than the June 27 ADR, containing three substantive body paragraphs compared to the single-sentence paragraph constituting the body of the June 27 ADR; and the indemnity paragraph in the final ADR was the last body paragraph on the page, appearing directly above Mr. Maruska's signature line. (See JX-70 at 2; JX-72 at 1; JX-51 at 1; DX-B at 6.) Thus, even assuming, without deciding, that Comerica and AGK had never discussed the inclusion of an indemnity provision in the assignment of declarant's rights prior to the deal's closing, Mr. Maruska's alleged belief that the final ADR was identical to the June 27 ADR with the exception of the buyer's name was neither reasonable nor an instance of “excusable neglect.” (See Doc. No. 116 at 20); see also Donovan, 26 Cal.4th at 283 (“A party bears the risk of mistake when . . . he is aware, at the time the contract is made, that he has only limited knowledge with respect to the facts to which the mistake relates but treats his limited knowledge as sufficient.”) (citing Rest. 2d Contracts, § 154); Stewart, 134 Cal.App.4th at 1589 (rejecting the “extreme proposition that a party who fails to read a contract but nonetheless objectively manifests his assent by signing it-absent fraud or knowledge by the other contracting party of the alleged mistake-may later rescind the agreement on the basis that he did not agree to its terms”). Similarly, Comerica does not proffer any explanation for how the decision in Reid-which pertains to a mistake “due largely to . . . the plaintiffs' [false] representations that the document reflected the terms of her original agreement,” 166 Cal.App.4th at 484-is applicable to its defense here, which is not premised upon AGK causing the mistake in this case.

As noted above, Mr. Maruska testified at trial that he noticed that all of the attachments to Ms. Tresler's email attaching the final ADR and other closing documents were marked “new,” but he assumed that this denotation was only added to reflect the change to the buyer's name. (Doc. No. 104 at 119:21-120:1,175:13-16.) However, this mistaken and erroneous assumption was not reasonable, at the very least because some of the closing documents did not even include the buyer's name. (See Doc. No. 104 at 172:12-20; JX-72 at 6, 18.)

Comerica's reliance on the decision in Reid is also unpersuasive because that decision predates by nearly half of a century the California Supreme Court's decision in Donovan, which sets forth the elements a defendant seeking to invoke the unilateral mistake defense must prove “[w]here the plaintiff has no reason to know of and does not cause the defendant's unilateral mistake of fact.” 26 Cal.4th at 282; see also Est. of Eskra, 78 Cal.App. 5th at 223 (explaining that in Donovan, the California Supreme Court “adopt[ed] as California law the rule in section 153, subdivision (a), of the Restatement, authorizing rescission for unilateral mistake of fact where enforcement would be unconscionable”) (citing Donovan, 26 Cal.4th at 281).

Accordingly, the court finds that the facts of this case are more comparable to those cases in which California courts have found that a party's failure to read a contract prior to execution constitutes a neglect of legal duty such that that party bears the risk of the mistake. See Stewart, 145 Cal.App.4th at 1588-89 (“We need look no further than the third Donovan factor to conclude that [the party seeking rescission] raised no triable issue of material fact concerning possible rescission of the settlement agreement. . . . California authorities demonstrate that a contracting party is not entitled to relief from his or her alleged unilateral mistake [of having failed to read a contract before signing].”) (citing cases); see also Reed v. KPS Alarms, Inc., No. 2:15-cv-05482-DMG-E, 2016 WL 1729041 (C.D. Cal. Apr. 29, 2016) (noting that “California contract law ‘imputes to a person the intention corresponding to the reasonable meaning of [his] words and acts' based on ‘[his] outward expression' and not ‘[his] unexpressed intent'” and finding that “by signing the employee agreement, [plaintiff] signified that he received, read, and agreed to the terms of the contract” and “cannot now claim that he did not understand what he signed or was not aware of the terms in the employee agreement”) (quoting Edwards v. Comstock Ins. Co., 205 Cal.App.3d 1164, 1169 (1988)); Matson v. S.B.S. Trust Deed Network, 46 Cal.App. 5th 33, 45 (2020) (finding that the buyer-plaintiff bore the risk of mistake where he “obtained a 94-page title report but did not read it thoroughly” before agreeing to pay a price above the fair market value).

Because Comerica has not established the third Donovan factor, Comerica is not entitled to partial recission of the final ADR based on its asserted unilateral mistake defense. However, even assuming Comerica had satisfied the third Donovan factor, Comerica has nonetheless failed to establish the fourth requirement necessary in order to invoke the unilateral mistake defense: that enforcement of the contract would be unconscionable in light of the effect of the mistake. See Donovan, 26 Cal.4th at 282. “An unconscionable contract ordinarily involves ‘both a procedural and a substantive element, the former focusing on oppression or surprise due to unequal bargaining power, the latter on overly harsh or one-sided results.'” Winterrowdv. Am. Gen. Annuity Ins. Co., No. 2:00-cv-00677-CAS-RC, 2003 WL 27383464, at *4 (C.D. Cal. Aug. 11, 2003) (quoting Armendariz v. Found. Health Psychcare Servs., 24 Cal.4th 83, 114 (2000)). Although the standards of unconscionability warranting rescission for mistake are “similar” to those standards that courts consider when determining whether it would be unconscionable to enforce a contract or term, “[i]n ascertaining whether rescission is warranted for a unilateral mistake of fact, substantive unconscionability often will constitute the determinative factor, because the oppression and surprise ordinarily results from the mistake-not from inequality in bargaining power.” Donovan, 26 Cal.4th at 291 . The court will thus focus its unconscionability analysis on the substantive element of unconscionability. “The substantive element concerns whether a contractual provision reallocates risks in an objectively unreasonable or unexpected manner.” Jones v. Wells Fargo Bank, 112 Cal.App.4th 1527, 1539 (2003). For a contractual provision to be found to be substantively unconscionable, it must “shock the conscience.” Id. at 1540.

Comerica argues that enforcement of the final ADR would result in “oppression and surprise and an overly inequitable and harsh result” because “Comerica substantially discounted the purchase price of the 51 lots by $950,000 due primarily to AGK's concerns regarding Comerica's uncertain status as the Declarant.” (Doc. No. 89 at 26-27.) The court disagrees. At the time of the mission critical email, Comerica was listing a purchase price for the 51 lots of $8,200,000. (See JX-38 at 3.) AGK requested a $435,000 price reduction for a Wildlife Heritage Foundation deposit issue and a $1,150,000 price reduction for the declarant issue risks, requesting a new purchase price of $6,615,000. (Id.) Comerica countered with only a $500,000 price reduction, which was reflected in the second amendment. (JX-38 at 1; JX-61 at 6.) The court declines to strictly apportion this price reduction by ascribing certain amounts in consideration for the Wildlife Heritage Foundation deposits and certain amounts in consideration for control-related risks. Regardless of any such apportionment, it appears plausible that at least some of this $500,000 price decrease was not made by Comerica as consideration for the declarant's rights issues, and whatever portion of this reduction was in consideration for the control risks associated with this transaction, it was not enough to assuage AGK's concerns regarding the control risks. In other words, the $500,000 price reduction that Comerica offered in response to Mr. Murphy's mission critical email laying out the declarant's rights issue and attendant control risks was insufficient to end the parties' bargaining related to the declarant's rights issue. (See Doc. No. 102 at 95:12-22) (Mr. Murphy testifying that “[a]t that point, in my mind, had we gotten the full reduction [to $6,615,000], . . . we would have closed “as is” with the full reduction and with the transfer of declarant rights. . . . When that was not granted, . . . we required a release and/or indemnity.”) The court's conclusion in this regard is supported by the significant evidence presented at trial that the parties continued to negotiate the declarant's rights issue well after this point. For example, after the execution of the second amendment which provided for the $500,000 price reduction, Mr. Murphy resent a revised version of the mission critical email, this time with more detail describing the magnitude of the control risks. (See JX-39 at 1-2.) In that email, Mr. Murphy reiterated AGK's request for a $435,000 price reduction for the Wildlife Heritage Foundation deposit issue and a $1,150,000 price reduction for the declarant issue risks. (Id. at 3.) Indeed, as noted above, even Mr. Maruska believed this to be “an ongoing attempt to lower the price.” (Doc. No. 104 at 97:3-4.) AGK's continued expressed concerns surrounding the declarant's rights issues is also demonstrated by the fact that a full week after the second amendment was executed, the parties continued to negotiate for further concessions surrounding the declarant's rights issue in the third amendment, which required that the parties enter into an assignment of declarant's rights and that Comerica record an instrument revoking the Supplemental Declaration. (See JX-43 at 7-8.) Thus, the evidence presented at trial does not establish that the $500,000 price reduction contemplated by the second amendment was intended to wholly and completely constitute AGK's compensation for the declarant's rights issue.

Following the $500,000 price reduction contemplated by the second amendment, the parties agreed to yet another price reduction in the third amendment, this one to the tune of $350,000, for a total reduction in price of $850,000. (See JX-43 at 7.) The resulting $7,350,000 price was the final price AGK paid to purchase the lots at Sierra de Montserrat. (See Doc. No. 102 at 59:3-4.) As noted above, at trial, Mr. Murphy could not precisely pinpoint what the $350,000 price reduction was meant to address, stating that he believed “we were negotiating the continuum of our concession requests, so our requests were a price reduction, with Assignment of Declarant Rights. We didn't get our full price reduction, so there were further concessions we were negotiating, and on the continuum was price, control, and those sorts of things.” (Doc. No. 102 at 59:11-16.) Similarly, Mr. Friedel testified that the roughly $700,000 difference between the price AGK was comfortable paying for the property “as is” ($6,615,000) and the price contemplated by the third amendment ($7,350,000) meant that “the risks [AGK was] willing to assume were not the same as the risks [AGK was] willing to assume at the lower price.” (Doc. No. 103 at 32:4-8.) Mr. Friedel testified that, as a result of not getting the full price reduction, AGK's options at that time were to “seek the indemnity, or . . . put our pencils down and walk away with our deposit and go home.” (Id. at 33:1-3.) Consistent with this testimony, the third amendment provided for both the $350,000 price reduction and an assignment of declarant's rights “in form and substance acceptable” to AGK. (See JX-43 at 7.) As attorney Pakfar testified, this requirement was added because AGK “wanted to make it clear that AGK would only close if the form of the declarant assignment was acceptable in [AGK's] sole and absolute discretion” and that Comerica “would potentially be subject to an Assignment of Declarant Rights they weren't 100 percent comfortable with.” (Doc. No. 100 at 122:7-15.) This structure would effectively retain the contingent nature of the deal (despite AGK waiving due diligence), because in theory, AGK could insist on its preferred form and substance of an assignment of declarant rights, and Comerica could walk away from the deal if the substance of the assignment of declarant rights was unacceptable to Comerica. (See id.)

Based upon this evidence admitted at trial, the court disagrees with Comerica's characterizations both that Comerica discounted the Sierra de Montserrat lots by $950,000-it is unclear to the court how Comerica computed this figure, and as noted above, the price reduction in this case was $850,000-and that this price reduction on its own served to resolve all control issues relating to the lots. (See Doc. No. 89 at 26.) Instead, the court concludes based upon the evidence presented at trial that the parties negotiated for a price reduction of $850,000 and an assignment of declarant rights in form and substance acceptable to AGK in order to address the control issues related to the development. On this view, the final ADR was precisely what was contemplated by the parties' bargaining related to the declarant's rights issue.

In short, the evidence presented at trial establishes that the ambiguity surrounding whether Comerica had actually become the declarant of Sierra de Montserrat remained a live issue throughout the entire course of the negotiation of this deal. Indeed, Comerica itself had “strong concerns” about whether it held the declarant rights to Sierra de Monsterrat, but declined to disclose those concerns, or even the fact of Comerica's ongoing litigation with Westwood, to AGK, instead leaving AGK to discover this issue through its own due diligence research. (See Doc. No. 104 at 129:10-22, 132:12-133:35.) Comerica knew the ambiguity surrounding who was the development's declarant was a significant issue for AGK, with Mr. Maruska internally citing it as the reason the sale might “fall[] apart.” (See JX-66 at 3.) Comerica did not agree to AGK's requested price reduction in full, which was necessary for AGK to close the deal “as is,” with an assignment of declarant's rights that might not have included an indemnity provision. (See JX-38; Doc. No. 103 at 26:16-21) (Mr. Friedel explaining that if AGK had received the full price reduction and the assignment of declarant rights, AGK “would have still asked for” an indemnification provision, but “would have closed without it”). Instead, Comerica agreed to a partial price reduction in conjunction with an assignment of declarant rights in a form and in substance acceptable to AGK. (See JX-43 at 7.) Comerica knew that the murkiness surrounding declarant's rights could impact its ability to sell the property, with senior management at Comerica going so far as to say that “any savvy buyer is going to figure this out,” expressing openness to suing Westwood in order to resolve the issue, and stating that Comerica “need[s] to know what [its] options are via counsel” with regard to resolving the issue. (JX-66 at 1-2.) Nonetheless, Mr. Maruska unilaterally decided not to pass along Mr. Murphy's request for a call between attorney Pakfar and Mr. Ferrer to discuss these control challenges, believing “there was nothing for us to gain by [doing] that,” and Mr. Ferrer was “generally hard to reach” throughout the deal, and especially as closing approached. (See Doc. Nos. 104 at 98:8-10; 101 at 118:6-17.) With negotiations on this issue down to the wire, AGK at that time “likely . . . presumed [it] would get another extension” on the due diligence, but Comerica and/or Mr. Maruska were under pressure to close the deal by the end of the quarter on June 30, 2010, and another extension beyond that time never occurred. (See Doc. No. 102 at 47:7-11, 63:24-64:1; 104 at 182:17-19). On June 27, 2010, Mr. Ferrer and Mr. Maruska were both made aware that Ms. Tresler was awaiting comments from AGK on the June 27 ADR, which Mr. Maruska described as “a special document for a special circumstance that usually counsel would be involved in,” “nonordinary,” and “pretty important.” (Doc. Nos. 104 at 107:17, 110:3-8; 105 at 17:25-18:1, 19:20-25.) The final ADR contained an indemnity provision in favor of AGK, which was a standalone paragraph and the last body paragraph of the one-page document, located near Mr. Maruska's signature line, in the same size print as the other body paragraphs in the document. (See JX-51.) The final ADR was not the only deal document containing an indemnity provision, with the PSA also containing unrelated indemnity provisions in favor of Comerica. (See, e.g., JX-27 at 8, 9, 15, 20, 34; see also Doc. No. 101 at 138:17-23.) Mr. Maruska-who, by his own estimate, had worked on the marketing and sale of roughly ten to fifteen distressed properties within Comerica's Special Assets Group by the time of the Sierra de Montserrat deal-was authorized by Comerica to execute the deal's closing documents, and he signed the final ADR without reading it. (See Doc. Nos. 104 at 56:7-10, 175:25-176:3; JX-73.) Mr. Ferrer, Comerica's lawyer working on the deal, never reviewed the closing documents, nor did he ever follow up (with either Mr. Maruska or AGK) to inquire as to the buyer's comments on the June 27 ADR or even as to the outcome of the deal itself. (See Doc. No. 105 at 67:21-68: 9.)

Ms. Kordoban's comments in this regard contribute to the court's skepticism that enforcement of the final ADR “would result in a windfall for AGK,” as Comerica argues. (See Doc. No. 89 at 26.) Indeed, her comments suggest that at least some senior management at Comerica believed that significant concessions related to the Sierra de Montserrat property-potentially including the costs of Comerica litigating with Westwood-might be necessary in order for Comerica to successfully sell the property. Comerica's internal concerns suggest that an indemnity provision in favor of the buyer (particularly one that would potentially indemnify AGK against the costs of litigating with Westwood over the declarant's rights issue, the very litigation Ms. Kordoban seemed to be suggesting that Comerica engage in), even if costly, would not necessarily be a windfall for AGK; instead, the economic value of such an outcome may have been somewhat proportional to what some members of Comerica management thought was necessary for the bank to expend in order for Comerica to receive the benefit of selling the property and getting off of its books.

Furthermore, there was ample evidence admitted at the trial before this court suggesting that because Comerica declined to agree to a full price reduction or a settlement with Westwood, AGK almost certainly would not have closed the deal without the inclusion of the indemnity paragraph in the final ADR. (See Doc. No. 103 at 33:1-3.) Comerica wanted to sell distressed properties “as reasonably quickly as [it] could” given that “every day that an asset is still owned, it's still liability for the bank.” (Doc. No. 104 at 56:13-20, 182:10-13.) As noted above, Comerica was aware that “any savvy buyer” would identify the declarant's rights issue and that remedying it could potentially be costly. (See JX-66 at 1-2.) The final ADR thus allowed the bank to sell the lots by the end of the quarter, as it wanted to do, and it is at least plausible that the potential cost of an indemnity provision was simply a price Comerica would have to pay with almost any buyer as a result of the Sierra de Montserrat foreclosure documents failing to unambiguously transfer the declarant rights from Westwood to Comerica. Although the final ADR contained a one-sided indemnity in favor of AGK, within the broader context of the deal, by purchasing the property without Comerica having entered into a settlement with Westwood, AGK was agreeing to take on control-related risks and difficulties in managing the development on a day-to-day basis. These risks and challenges would exist even with an indemnification from Comerica, which was why AGK ranked indemnity as “a very bad result” and its least-preferred solution to the control issues. (See Doc. No. 100 at 136:4-138:23.) Thus, both parties stood to benefit from the deal's terms, including the final ADR, and both parties were subject to obligations under those terms. Given these facts, the court can hardly conclude that enforcement of the final ADR would “shock the conscience” or yield “overly harsh or one-sided results.” Donovan, 26 Cal.4th at 292; Jones, 112 Cal.App.4th at 1540 (holding that a loan agreement providing for an effective interest rate above ten percent was not substantively unconscionable because “it is not unreasonable or unexpected” in light of the risks a lender takes on when funding a transaction); Five Points Mgmt. Grp., Inc. v. Campaign, Inc., No. 1:20-cv-02599-RBJ, 2021 WL 3710373, at *7 (D. Colo. Aug. 20, 2021) (finding that an agreement was not substantively unconscionable under California law where both parties were subject to obligations under the agreement and noting that the fact “[t]hat one party has more obligations or constraints under a contract does not render the contract unconscionable”); Rios v. Paramo, No. 3:13-cv-02455-WQH-JMA, 2015 WL 8492500, at *6 (S.D. Cal. Dec. 10, 2015) (finding that there was no substantive unconscionability where the contract at issue provided benefits to both parties and thus was not “overly harsh” or “one-sided”) (citation omitted).

As attorney Pakfar testified at trial,

Sometimes parties agreed to one-sided indemnities, or broad indemnities. You know, when we agreed to a universal buyer indemnity [in] the Bill of Sale, I don't remember Comerica saying, [“]hey, did you notice that there's a buyer indemnity and there's no seller indemnity. Are you sure you don't want to ask for a mutual indemnity? Are you sure you don't want to tighten this up a little bit?[”]
They didn't say that. It was our job to look at the Bill of Sale and say, [“]are we okay with that language[”] before we sign the PSA.
(Doc. No. 101 at 138:17-139:1.) In this case, Comerica (and Mr. Maruska) had a duty to read the terms of the final ADR before signing it. See Rosenfeld, 732 F.Supp.2d at 965. Comerica failed to do so, and it must now bear the risk of that mistake. See Greif, 74 Cal.App. 5th at 442 (finding that because the party seeking to rescind a contract bore the risk of the mistake, enforcing the contract would not be unconscionable). Therefore, the court concludes that Comerica has also failed to establish the fourth required prong of its affirmative defense of unilateral mistake.

Accordingly, Comerica is not entitled to partial rescission of the final ADR.

Although AGK appears to believe that Comerica has also separately asserted unconscionability as an affirmative defense, Comerica only argues unconscionability within the context of its unilateral mistake affirmative defense. (See Doc. No. 111 at 12, 15; see also Doc. Nos. 6; 84 at 5; 89 at 24-27.) However, such an affirmative defense would nonetheless fail for the reasons described above. Because of the California Supreme Court's guidance that “substantive unconscionability often will constitute the determinative factor” in an analysis of the applicability of the unilateral mistake defense, the court's analysis set forth above focused primarily on the substantive element of unconscionability. Donovan, 26 Cal.4th 261. Nevertheless, the court notes that the final ADR also does not bear the hallmarks of procedural unconscionability. See Jones, 112 Cal.App.4th at 1539 (“The procedural element requires oppression or surprise. Oppression occurs where a contract involves lack of negotiation and meaningful choice, surprise where the allegedly unconscionable provision is hidden within a prolix printed form.”) (internal citation omitted). Here, the parties engaged in a lengthy negotiation process, both parties to the transaction were sophisticated and wielded comparable bargaining power, and the indemnity paragraph was not hidden in the final ADR.

2. AGK's Performance Under the Contract or Excuse for Nonperformance

The final ADR does not require any action on the part of AGK, and Comerica does not argue that AGK failed to perform its obligations pursuant to the final ADR. (See generally JX-51.) In addition, the evidence presented at trial suggests that AGK paid the agreed-upon purchase price for the lots at Sierra de Montserrat and took all other necessary steps to close the transaction. Therefore, the court finds that AGK performed under the contract at issue.

3. Comerica's Breach

Having found that the final ADR and the indemnity paragraph therein are valid and enforceable, the court next considers whether Comerica breached the final ADR when it refused to indemnify AGK for the fees and costs it incurred in the Westwood litigation. In order for AGK to prove that Comerica breached the final ADR, it must prove that the Westwood litigation falls within the scope of the indemnity paragraph.

a. Interpreting the indemnity paragraph

The court first analyzes the meaning of the indemnity paragraph of the final ADR. See Ins. Co. of State of Penn. v. Gemini Ins. Co., No. 3:13-cv-029341-BAS-DHB, 2014 WL 7407466, at *6 (S.D. Cal. Dec. 30, 2014) (“Under California law, contract interpretation is a matter of law for the judiciary.”).

“The overriding goal of contract interpretation is to give effect to the mutual intention of the parties at the time of contracting, ‘so far as the same is ascertainable and lawful.'” S. Pac. Transp. Co. v. Santa Fe Pac. Pipelines, Inc., 74 Cal.App.4th 1232, 1240 (1999) (quoting Cal. Civ. Code § 1636). “When a contract is reduced to writing, the intention of the parties is to be ascertained from the writing alone, if possible.” Cal. Civ. Code § 1639. However, “[e]xtrinsic evidence . . . can be offered where it is obvious that a contract term is ambiguous, [and] also to expose a latent ambiguity.” S. Pac. Transp. Co., 74 Cal.App.4th at 1241. Furthermore, “[a]ny contract must be construed as a whole, with the various individual provisions interpreted together so as to give effect to all, if reasonably possible or practicable.” City of Atascadero v. Merrill Lynch, Pierce, Fenner & Smith, Inc., 68 Cal.App.4th 445, 473 (1998); see also Ins. Co. of State of Penn., 2014 WL 7407466, at *6. “Courts must interpret contractual language in a manner which gives force and effect to every provision, and not in a way which renders some clauses nugatory, inoperative or meaningless.” City of Atascadero, 68 Cal.App.4th at 473.

“Parties to a contract . . . may define therein their duties toward one another in the event of a third party claim against one or both arising out of their relationship.” Crawford v. Weather ShieldMfg., Inc., 44 Cal.4th 541, 551 (2008). “Indemnity is a contract by which one engages to save another from a legal consequence of the conduct of one of the parties, or of some other person.” Cal. Civ. Code § 2772. Under California law, “[a]n indemnity against claims, or demands, or liability, . . . embraces the cost of defense against such claims, demands, or liability incurred in good faith, and in the exercise of a reasonable discretion.” Cal. Civ. Code § 2778(3). “[P]arties to an indemnity contract have great freedom of action in allocating risk, subject to certain limitations of public policy.” Hello Network, Inc. v. CityGrid Media, LLC, No. 2:14-cv-04301-SJO-E, 2014 WL 12696797, at *3 (C.D. Cal. Nov. 24, 2014) (citing Heppler v. J.M. Peters Co., 73 Cal.App.4th 1265, 1277 (1999)). “In general, such an agreement is construed under the same rules as govern the interpretation of other contracts.” Crawford, 44 Cal.4th at 552. More specifically, “[e]ffect is to be given to the parties' mutual intent, as ascertained from the contract's language if it is clear and explicit.” Id. (internal citations omitted).

As noted above, the indemnity paragraph of the final ADR states:

The undersigned [Comerica] agrees to indemnify, defend and hold Successor Declarant [defined as “AGK Sierra de Montserrat, L.P., a Delaware limited partnership”] harmless from and against any and all loss, liability, claims or causes of action existing in favor of or asserted by any party arising out of the undersigned's position as “Declarant” under the CC&Rs on or before the date first above written. In accordance herewith, the undersigned expressly acknowledges that the undersigned shall remain responsible for all obligations, responsibilities and liabilities that accrued before the date of this assignment.
(JX-51 at 1) (emphases added). The court first concludes that this paragraph constitutes an indemnity under California law. See Cal. Civ. Code § 2772. The court next concludes that the indemnity paragraph is ambiguous, because the language “on or before the date first above written” (the “date phrase”) could modify either of the two preceding phrases: the first phrase “any and all loss, liability, claims or causes of action existing in favor of or asserted by any party” (the “existence phrase”) or the second phrase “arising out of the undersigned's position as ‘Declarant' under the CC&Rs” (the “declarant phrase”). See Reyes v. Wells Fargo Bank, N.A., No. 3:10-cv-01667-JCS, 2011 WL 30759, at *12 (N.D. Cal. Jan. 3, 2011) (“A contract provision is ambiguous when it is capable of two or more constructions both of which are reasonable.”) If the date phrase is construed as modifying the existence phrase, the indemnity paragraph would be read to require Comerica to indemnify AGK against any “any and all loss, liability, claims or causes of action existing in favor of or asserted by any party . . . on or before the date first above written.” Whereas, if the date phrase is construed as modifying the declarant phrase, the indemnity paragraph would be read to require Comerica to indemnify AGK against any such claims “arising out of [Comerica's] position as ‘Declarant' under the CC&Rs on or before the date first above written.” (See JX-51 at 1.) Due to this ambiguity, the court will look to external evidence to interpret the meaning of the indemnity paragraph as it appears in the final ADR. See City of Atascadero, 68 Cal.App.4th at 474 (“The mutual intention to which the courts give effect is determined by objective manifestations of the parties' intent, including the words used in the agreement, as well as extrinsic evidence of such objective matters as the surrounding circumstances under which the parties negotiated or entered into the contract; the object, nature and subject matter of the contract; and the subsequent acts and conduct of the parties.”) (citations omitted).

i. The date phrase: “On or before the date first above written”

As Comerica noted at trial, the final ADR did not contain a date written above the indemnity paragraph until after it was recorded and stamped by the Placer County Recorder on June 30, 2010. (See JX-51 at 1; JX-72 at 8; Doc. No. 100 at 45:10-20.) Thus, when Mr. Maruska signed the final ADR, the only date on the document presumably would have been June 29, 2010, reflecting the date of Mr. Maruska's signature and thus the assignment of Comerica's purported declarant rights. (See JX-51 at 1.) Though the distinction between June 29, 2010 and June 30, 2010 is immaterial for the purposes of these findings of fact and conclusions of law, the court interprets “the date first above written” in the indemnity paragraph as referring to “June 29, 2010,” the only date on the document at the time it was executed.

Comerica argues that the phrase “on or before the date first above written” must modify the phrase “any and all loss, liability, claims, or causes of action existing in favor of or asserted by any party.” (See Doc. No. 89 at 21.) In mounting this argument, Comerica first emphasizes that the following sentence in the paragraph begins with “[i]n accordance herewith” and proceeds to refer to “all obligations, responsibilities, and liabilities that accrued before the date of this assignment.” (Id.) Comerica argues that because this latter sentence addresses obligations and liabilities that have accrued before the date of the assignment and states that this sentence is “in accordance” with the first sentence, it follows that “on or before the date first above written” in the first sentence also refers to the accrual of obligations and liabilities, i.e., “any and all loss, liability, claims or causes of action existing in favor of or asserted by any party . . . on or before [June 29, 2010].” (Id.; see also Doc. No. 116 at 5-6) (emphasis added).

Comerica next contends that “[t]he only time period during which Comerica could ever have possibly have (sic) held the ‘position as Declarant' was ‘on or before the date first above written,” because the assignment of the declarant position to the successor declarant AGK became effective on that date. (Doc. No. 89 at 21-22.) Thus, if the date phrase were interpreted as modifying the declarant phrase, then the date phrase “would be meaningless surplusage.” (Id.). The court finds this particular argument to be persuasive. Further, there is no evidence before the court suggesting that the parties ever intended for the indemnity period to exclude some portion of Comerica's purported time as declarant; in other words, the phrase “on or before the date first above written” would serve no purpose if it were modifying the phrase “arising out of the undersigned's position as ‘Declarant.'” See Idaho v. Coeur d'Alene Tribe, 794 F.3d 1039, 1045 (9th Cir. 2015) (interpreting a contract clause so as to avoid “meaningless surplusage”). It does not necessarily follow, however, that the date phrase was intended to modify the phrase “any and all loss, liability, claims, or causes of action existing in favor of or asserted by any party.” (See JX-51 at 1.) Thus, the court is not persuaded by Comerica's first argument-that the date phrase necessarily modifies the existence phrase.

Importantly, it is not clear that interpreting the date phrase as modifying the existence phrase would align with the drafters' intentions. See S. Pac. Transp. Co., 74 Cal.App.4th at 1240 (describing the “overriding goal of contract interpretation” as “giv[ing] effect to the mutual intention of the parties at the time of contracting”). Attorney Pakfar, one of the two drafters of the indemnity paragraph, addressed this issue and testified at trial as follows:

[W]e talked about, quite a bit, the key issue right-the gray area that we're talking about is the declarant position of Comerica prior to assigning it to us. So before this deal closes, is Comerica declarant or not? . . . . we were intending to have them indemnify our client for anything that arises out of that issue. . . . our intent was to make it as broad as possible. Anything that pertained to whether Comerica was declarant, would be covered. So for example, if the supplemental declaration couldn't be revoked because they weren't declarant, that would be covered. If AGK's not the declarant after the date hereof because there wasn't an effective assignment, that would be covered. Anything that would arise out of Comerica not being the declarant [was] supposed to be covered. If they are not the declarant, and they don't control the DRC, . . . they couldn't have assigned [declarant status] to us, then we're not the declarant, then we don't have control of the board, then we have problems.
(Doc. No. 101 at 56:9-57:15.) This testimony strongly suggests that AGK intended for the date phrase to modify the declarant phrase, even if that modification would result in the meaningless surplusage as described above. Moreover, the importance of interpreting the indemnity paragraph in accordance with the drafters' intentions is heightened here, where the parties had agreed that the final ADR must be “in form and substance acceptable to” AGK, the drafter of this portion of the final ADR.

In short, the date phrase could reasonably be interpreted as modifying the existence phrase or the declarant phrase. However, the court need not determine which interpretation is correct because the court ultimately concludes that either interpretation yields the same outcome when applied to the actions at issue-the Kincade Action and Murphy Action-in this case.

Comerica also argues, without any supporting authority, that “[i]f the Court is unable to resolve any ambiguities in the first sentence of the indemnity provision . . . the Court must construe any ambiguities against AGK, the drafter of the indemnity provision.” (Doc. No. 116 at 6.) Because the court finds that the ambiguity in the first sentence of the indemnity paragraph does not impact the court's analysis regarding the application of that paragraph of the final ADR to the Kincade and Murphy Actions, the court need not address this argument advanced by Comerica. However, the court notes that “unlike insurance policies, which are adhesion contracts, there is normally no reason to construe indemnity agreements against the drafter.” City of Watsonville v. Corrigan, 149 Cal.App. 1542, 1549 (2007); see also Rossmoor Sanitation, Inc. v. Pylon, Inc., 13 Cal.3d 622, 633 (1975) (noting that when parties bargain for protection pursuant to an indemnity agreement, “the protection should be afforded”).

As Comerica aptly points out, if the date phrase were to apply to the declarant phrase, the date phrase would be meaningless surplusage: any action that arose out of Comerica's position as declarant would necessarily have arisen out of Comerica's position as declarant on or before June 29, 2010, the last day upon which Comerica purported to be the declarant. As a result, the indemnity paragraph would include within its scope any action arising out of Comerica's position as declarant, regardless of when the action was brought.

Furthermore, as AGK aptly points out, even if the date phrase were to apply to the existence phrase, the indemnity paragraph would not limit Comerica's indemnity obligations to claims that had actually been filed as of that date (when the final ADR was executed). (See Doc. No. 111 at 17.) If the date phrase were to modify the existence phrase, the plain language of the indemnity paragraph would state in relevant part: “loss, liability, claims or causes of action existing in favor of or asserted by any party . . . on or before the date first above written.” (JX-51 at 1) (emphases added). Comerica's position as declarant ceased as of that date and, as the court explains further below, a claim that arises out of Comerica's position as declarant necessarily existed as of that date. Thus, the indemnity paragraph includes within its scope losses, liabilities, claims, and causes of action that arise out of Comerica's position as declarant, even if no formal lawsuit or other proceeding had yet been initiated as of the time the final ADR was executed, because such claims necessarily existed at that time.

There was ample evidence admitted at the trial of this action suggesting that this interpretation would align with the drafters' intentions regarding the scope of the actions encompassed by the indemnity paragraph. As explained above, attorney Pakfar testified that it was AGK's intent for the indemnity paragraph to be “as broad as possible.” (Doc. No. 101 at 56:24.) Attorney Galstian, the other drafter of the indemnity paragraph of the agreement, also testified that it was his intent for the indemnity paragraph to encapsulate future lawsuits, as opposed to only lawsuits already in existence at the time the final ADR was executed:

I believe the reason we drafted it in this way was we intended it to be as broad as possible. . . . in summary, what we were trying to say was, any claim arising, or asserted by anyone while Comerica was the declarant, up until the date it was no longer declarant, would be a claim that is-that they indemnify us over, even if the filing of the claim happens whenever.
(Doc. No. 102 at 140:2-3, 140:25-141:4.) This trial testimony is likewise consistent with the above-described additional evidence before the court pertaining to AGK's serious concerns regarding future litigation with Westwood and/or Mr. Westwood over control issues. (See JX-38 at 2-3; JX-39 at 2-3); (see also Doc. No. 101 at 186:24-187:10) (Mr. Murphy describing due diligence research revealing Mr. Westwood's reputation that “he was a difficult person [with] a propensity to be litigious”). Thus, even if the date phrase were to modify the existence phrase, the indemnity paragraph would nonetheless encompass future claims filed by third parties, so long as those claims arose out of Comerica's purported position as declarant. Such an interpretation would be necessary in order to “give effect” to the parties' intentions at the time of contracting and to “explain [the final ADR] by reference to the circumstances under which it was made.” S. Pac. Trans. Co., 74 Cal.App.4th at 1240.

Attorney Galstian also testified that he “believe[s]” the words “on or before the date first above written” was meant to modify “the undersigned's position as ‘Declarant'” in the indemnity paragraph. He based this belief on his recollection that he intended the indemnity paragraph to cover claims pertaining to Comerica's status of declarant, regardless of when any such lawsuit was filed. (See Doc. No. 102 at 140:23-141:4.) Although the court declines to determine which phrase in the indemnity paragraph is modified by “on or before the date first above written,” the court's conclusion regarding the scope of the indemnity paragraph under either potential modification is consistent with attorney Galstian's stated intent that the indemnity would cover claims arising out of Comerica's status as declarant, regardless of when any such claim or lawsuit is filed. (See id.)

As the court will explain further below in analyzing whether the fees and costs AGK incurred in connection with the Westwood litigation are covered by the indemnity paragraph, the court concludes that the Kincade and Murphy Actions fall within the scope of the indemnity paragraph, regardless of whether the date phrase modifies the existence phrase or the declarant phrase. Therefore, the court need not and does not determine the correct interpretation of the date phrase, because doing so is not necessary in order to resolve the remaining issues in this case. In other words, because the application of the date phrase to either the declarant phrase or the existence phrase yields the same result here, the court's analysis in this regard “give[s] effect to every part” of the final ADR-including the date phrase-even without strictly determining which phrase the date phrase modifies. See Cal. Civ. Code § 1641 (“The whole of a contract is to be taken together, so as to give effect to every part, if reasonably practicable, each clause helping to interpret the other.”).

b. Whether the Kincade Action falls within the scope offinal ADR

As noted above, the Kincade Action was initiated in the Placer County Superior Court, but was eventually submitted to arbitration. (See JX-6, JX-9.) That arbitration was bifurcated into two phases (see Doc. No. 103 at 61:18-21), which can roughly be summarized as follows. The first phase pertained to whether the declarant rights had transferred to Comerica, and then by extension, AGK. (See Doc. Nos. 103 at 61:25; 104 at 17:8-23.) The second phase of the arbitration addressed whether AGK's purported exercise of those declarant rights-through the use and approval of design features such as fence caps and chimney caps on homes in the development-was permissible. (See Doc. Nos. 103 at 63:4-64:4, 67:10-15; 116 at 10-11.)

i. Whether the Kincade Action arose out of Comerica's position as declarant

AGK asserts that the Kincade Action falls within the scope of the final ADR because each of Westwood's three causes of action “arose out of Westwood's assertion [that] it owned the Declarant rights.” (Doc. No. 110 at 14.) For example, “Westwood contended that AGK improperly purported to be the Declarant, AGK refused to recognize Westwood as the rightful Declarant, AGK wrongfully wielded Declarant powers to create an ‘illegal' [DRC] for the Development, and AGK misrepresented to [the Kincades] that the DRC AGK created had to approve the Kincades' plan submittals.” (Id.) (citing JX-6 at 7-8.) AGK thus argues that the claims asserted in the Kincade Action arose out of Comerica's position as declarant. (See id.)

Comerica, on the other hand, contends that Westwood's claims against AGK in the Kincade Action did not arise out of Comerica's position as the declarant. (Doc. No. 89 at 22-23.) In Comerica's view, Westwood's claims were “based on AGK's repeated, deliberate, and calculated attempts to exercise its purported rights as the Declarant over the objections of Westwood and with full knowledge that its status as the Declarant was ‘grey,'” and these claims “were not ‘arising out of Comerica's position as ‘Declarant.'” (Doc. No. 89 at 23) (emphasis in original). This wholly unpersuasive argument conveniently ignores the fact that AGK's ability to validly exercise the declarant rights Comerica assigned to it squarely hinges on whether Comerica held and wielded those rights to begin with, such that it could validly assign them to AGK. Comerica does not dispute that the Kincade Action arose out of AGK's attempt to exercise declarant's rights. (See Doc. No. 89 at 23.) However, whether AGK could exercise those declarant's rights is inextricably intertwined with the question of whether Comerica was the declarant following its foreclosure on Westwood's lots at Sierra de Montserrat. In the court's view these claims plainly arise out of Comerica's purported position as declarant.

Moreover, to the extent Comerica asserts that Westwood's claims in the Kincade Action did not arise out of Comerica's status as declarant because those claims instead arose out of AGK's “affirmative conduct and fault,” its argument is unavailing. (See Doc. No. 89 at 23.) The “affirmative conduct” Comerica condemns-“AGK's repeated, deliberate, and calculated attempts to exercise its purported rights as the Declarant over the objections of Westwood”-was precisely what was contemplated by the parties when they negotiated the assignment of declarant's rights. (See id.) In Mr. Murphy's June 21, 2010 mission critical email, he wrote:

When we put in our offer for the property the view from the Bank was that we could easily gain full control of the property (i.e., the HOA, Design Review Committee (DRC), and Board) via gaining
declarant rights. In reality, it is not explicitly stated in the CC&Rs that the declarant rights transfer upon bulk sale and/or upon foreclosure. . . . it hurts the value of the property by not being able to make changes and/or to have total control. . . . lack of control creates significantly more return risk in addition to [legal costs, delays, and muddy waters] . . . . If we waive tomorrow we would require that the PSA be modified such that the bank would record an assignment of declarant rights to us to at least create as [sic] additional hurdle for Westwood to clear.
(JX-39 at 1-3.) Without some sort of resolution on the issue of AGK being able to wield and exercise declarant's rights, Comerica acknowledged that the deal might “fall[] apart.” (See JX-66 at 3.) As the court has already described in painstaking detail above, the parties did in fact enter into an assignment of declarant's rights. The evidence at trial overwhelmingly demonstrated that this assignment was meant to help put AGK in the “best position” possible (short of Comerica settling with Westwood, which Comerica was not willing to do) for AGK to be able to assert declarant's rights. (See Doc. No. 101 at 160:18-161:2.) Therefore, Comerica's assertion that “[t]here is no language . . . in the indemnity provision suggesting that the parties intended Comerica's indemnity obligation to extend to claims based on AGKs own affirmative conduct and fault, all of which was entirely out of the control of Comerica” verges on the absurd in the court's view. (See Doc. No. 89 at 23.) Comerica cannot now seek to wash its hands of the clear connection between its prior purported status as declarant and AGK's subsequent exercise of the declarant's rights which Comerica purported to assign to it.

Comerica also argues that the issues arbitrated in the second phase of the arbitration of the Kincade Action did not arise out of Comerica's position as declarant because the second phase of the arbitration pertained to AGK's and the Kincades' alleged violations of the CC&Rs. (Doc. No. 116 at 10-11.) Comerica asserts that these alleged violations, which include the installation of pointed spikes on wrought iron fences and painted metal chimney caps, had “nothing to do whatsoever with Comerica's ‘position as the Declarant.'” (Id. at 11.) While the court recognizes that these alleged design decisions do not at first blush appear to directly pertain to Comerica's status as declarant, they all in fact stem from AGK's attempt to exercise the declarant rights Comerica assigned to it. As noted above, this exercise of control over Sierra de Montserrat was precisely the sort of issue that underpinned the parties' decision to enter into the final ADR and informed AGK's intentions when drafting the indemnity paragraph that was ultimately adopted. The connection between Comerica's status as the declarant and the issues addressed in the second phase of the arbitration in the Kincade Action is supported by attorney Gorry's testimony as a witness in the trial of this case in which he recalled that the parties “continued to discuss” the ruling from the first phase of the arbitration-in which the arbitrator determined that the declarant rights had not transferred to Comerica and thus that Westwood remained the declarant-in the second phase of that arbitration. (See Doc. Nos. 103 at 61:22-25; 104 at 18:13-25.) As AGK argues, a conclusion that the arbitration of specific alleged CC&R and DRC violations in the second phase of the arbitration arose from Comerica's position as declarant is further strengthened by Westwood's own framing of the assertions in Westwood's complaint in the Kincade Action. (See Doc. No. 110 at 14.) In that complaint, Westwood asserted, inter alia, that AGK's and the Kincades' alleged “[c]ontinued violations of the Governing Documents . . . interfere with the Westwood's rights as the Declarant to interpret and enforce the Association Governing Documents [and] its ability to appoint the majority of DRC members.” (JX-6 at ¶ 46.) While Westwood's framing of the issues in the Kincade Action is certainly not determinative of the outcome to be reached by the court here, the court does find persuasive the fact that the plaintiff in the Kincade Action drew a direct connection between alleged violations of CC&Rs and the status of the declarant; in other words, Westwood argued that these violations were actionable because Westwood remained the declarant even after Comerica foreclosed upon the lots at Sierra de Montserrat.

For all of these reasons, the court concludes that the Kincade Action arose out of Comerica's position as declarant.

Although in the somewhat different context of insurance policies, the court notes that “California courts have consistently given a broad interpretation to the terms ‘arising out of or ‘arising from,'” finding that this language “broadly links a factual situation with the event creating liability, and connotes only a minimal causal connection or incidental relationship.” Acceptance Ins. Co. v. Syufy Enters., 69 Cal.App.4th 321, 328 (1999); see also Searles Valley Minerals Operations Inc. v. Ralph M. Parsons Serv. Co., 191 Cal.App.4th 1394, 1403 (2011) (recognizing that “insurance indemnity law differs from contract indemnity law,” but “[nevertheless” finding insurance indemnity law “instructive” on issues of contract indemnity law).

ii. Impact of the date phrase on this analysis

The court next analyzes the impact of the date phrase on its analysis of whether the Kincade Action falls within the scope of the indemnity paragraph.

If the date phrase were to modify the declarant phrase, the indemnity paragraph would cover claims arising out of Comerica's position as declarant on or before June 29, 2010. Because the Kincade Action arose out of Comerica's position as declarant, and Comerica was the declarant on or before June 29, 2010, this reading of the indemnity paragraph would clearly include the Kincade Action within its scope.

If, on the other hand, the date phrase were to modify the existence phrase, the indemnity paragraph would cover any and all loss, liability, claims or causes of action existing in favor of or asserted by any party on or before June 29, 2010. Comerica argues that under this interpretation, the Kincade Action does not fall within the protection of the indemnity paragraph.

Comerica asserts that Westwood's claims asserted in the Kincade Action were not “in existence or asserted” by June 29, 2010, the date the final ADR was executed. (See Doc. No. 89 at 22.) Because Westwood “did not formally assert its claims against AGK until March 14, 2011” and “[a]ll of AGK's and the Kincade's [sic] claimed violations of the CC&Rs and Design Guidelines occurred after AGK's acquisition of the 51 lots,” Comerica argues that the Kincade Action falls outside of the scope of the indemnity paragraph. (Id.) The court finds this argument to be unpersuasive.

The court agrees with AGK that Westwood's claims in the Kincade Action “all stem from the dispute over whether Comerica assumed the Declarant rights when it foreclosed on most of the lots in the Development, as AGK's later assertion of those rights was necessarily predicated on Comerica's transfer of them to AGK through the [final ADR].” (Doc. No. 86 at 22.) This dispute existed on or before June 29, 2010, the date the final ADR was executed and, as the court found above, all of the claims asserted in the Kincade Action arose from this dispute. Because the court concludes that Westwood's claims arose out of Comerica's position as declarant, it necessarily follows that Westwood's claims existed on or before June 29, 2010, the last day on which Comerica could have been the declarant. Westwood could have litigated this issue through a declaratory relief action on or before June 29, 2010, but it appears that he waited until the time of the Kincade Action to seek, among other relief, a declaration that Westwood was the Declarant. (See Doc. No. 86 at 21; JX-6 at 15.) The fact that Westwood waited for AGK to exercise its purported control rights before seeking declaratory and other relief in the Kincade Action does not preclude the inclusion of this action in the scope of the indemnity paragraph, particularly where, as here, litigation such as the Kincade Action is precisely what AGK clearly intended to include within the scope of the indemnity paragraph that its lawyers drafted and was ultimately accepted as part of the final ADR.

Similarly, as argued by AGK, there was no active litigation between Westwood and AGK when the final ADR was signed. (Doc. No. 110 at 14.) If the date phrase were read to modify the existence phrase, a narrow interpretation of the indemnity paragraph that does not encompass lawsuits filed after that time even where claims asserted therein arose out of Comerica's status as declarant, it “would be irrational and render the provision meaningless.” (Doc No. 110 at 14) (citing City of Atascadero, 68 Cal.App.4th at 473). As the court described above, the indemnity paragraph was in direct response to AGK's concerns over future litigation with Westwood pertaining to the declarant's rights issue. Therefore, the court's interpretation of the indemnity paragraph here-as encompassing lawsuits filed after June 29, 2010 so long as the claims asserted therein arose out of Comerica's purported rights as declarant and thus necessarily existed on or before June 29, 2010-“‘give[s] effect to the mutual intention of the parties as it existed' at the time the contract was executed.” Colonies Partners LP v. County of San Bernardino, No. 5:18-cv-00420-JGB-SHK, 2019 WL 8621438, at *5 (C.D. Cal. Nov. 14, 2019) (quoting Cal. Civ. Code § 1636).

Although its argument in this regard is not entirely clear, it appears that Comerica counters that an interpretation of the indemnity paragraph that does not encompass lawsuits filed after June 29, 2010 would not actually render the provision meaningless. (See Doc. No. 116 at 7.) Comerica bases this argument on its assertion that the indemnity paragraph could still cover a dispute surrounding the Wildlife Heritage Foundation Deposits because “AGK became aware of the dispute between the [Wildlife Heritage Foundation] Conservation Steward and Comerica regarding the payment of the Security Deposits during the due diligence period” and flagged this issue in the mission critical email. (See Doc. No. 116 at 7.) This argument, however, is unpersuasive for multiple reasons. First, based on the evidence admitted at trial, it is unclear whether the Wildlife Heritage Foundation dispute had anything whatsoever to do with declarant's rights, and accordingly, whether that dispute would even fall within the scope of the final ADR's indemnity. Second, even assuming arguendo that the Wildlife Heritage Foundation dispute arose out of Comerica's position as declarant and would fall under the purview of the indemnity paragraph, it appears unlikely that AGK would have drafted the indemnity paragraph in the final ADR with the intent that the indemnity only cover the Wildlife Heritage Foundation dispute. The amounts AGK would need to pay for the Wildlife Heritage Foundation were discernable, with Mr. Murphy stating in the mission critical email that each deposit would be $15,000 per lot, for a total of $765,000. (See JX-38 at 2.) Unlike the unknown amounts AGK might have to spend defending its position as declarant, the value of the Wildlife Heritage Foundation deposits was not a black box. Indeed, in the mission critical email, Mr. Murphy stated that AGK “assume[d] [it] would be putting the [deposit] money up.” (JX-38 at 2.) In light of this statement, the evidence at trial suggesting that AGK simply planned to pay the readily calculable deposits, and the testimony that from AGK's perspective an indemnity was a “very bad result” in which the indemnitee is merely “inheriting a lawsuit,” it appears unlikely that AGK viewed the Wildlife Heritage Fund deposit issue as a risk meriting indemnification for future lawsuits. (See Doc. No. 100 at 137:3-6, 137:22-23.) As Mr. Murphy testified, the Wildlife Heritage Foundation deposit issue “wasn't as legal[ly] intensive of an issue as the HOA control issue.” (See Doc. No. 101 at 14:19-21.) Finally, the court notes that the evidence at trial regarding AGK's concerns about the Wildlife Heritage Fund deposits is eclipsed by the immense evidence introduced of AGK's concerns regarding control rights. Therefore, the court finds that it was practically impossible that the parties merely intended for the indemnity paragraph to apply to disputes surrounding the Wildlife Heritage Foundation Deposits.

Accordingly, the court concludes that the Kincade Action falls within the scope of the final ADR, regardless of whether the date phrase is read to modify the declarant phrase or the existence phrase. Thus, Comerica must indemnify AGK for the attorneys' fees and litigation costs AGK incurred in defending itself in that action. The next question is whether Comerica must also pay for the attorneys' fees and litigation costs that AGK incurred in defending the Kincades due to AGK's own decision to indemnify the Kincades in that action.

iii. Whether Comerica must indemnify AGK for its defense of the Kincades

At the trial of this action, attorney Gory testified that it was his understanding that AGK provided a defense to the Kincades because the underlying claims all arose from Westwood's purported status as declarant. (See Doc. No. 104 at 8:3-13.) Because all of Westwood's claims “came from the same operative core of rights,” AGK “agreed to indemnify the Kincades.” (Doc. No. 103 at 63:18-22.) In its closing argument at trial, AGK asserted that its indemnification of the Kincades “really was not that big of a deal, because all of the arguments, all of the law, everything was the same” and that indemnifying the Kincades was “the right thing to do.” (Doc. No. 105 at 106:3-6.)

However, as Comerica aptly points out, “AGK has not established that its provision of a defense to the Kincades was anything other than voluntary.” (Doc. No. 116 at 11.) AGK has cited no authority in support of the contention that Comerica has a legal obligation to effectively indemnify the Kincades-who are nowhere mentioned in the final ADR-merely because AGK volunteered to provide them with a legal defense. Nor does AGK cite any authority or evidence suggesting that AGK may recover its fees and costs incurred in defending the Kincades because that defense was one-and-the-same with AGK's own defense in that action. Rather, at trial, the parties presented evidence of the briefing submitted to the arbitrator in the Kincade Action in which AGK had provided the arbitrator with the amount of fees and costs AGK incurred specifically in its defense of the Kincades. (See JX-139 at 13-14.) AGK cannot now persuasively argue that its defense of the Kincades was identical to its own defense and required no separate expenditures in attorneys' fees and costs.

Accordingly, although Comerica must indemnify AGK for the expenses it incurred defending itself against the Kincade Action, that indemnification does not extend to the expenses AGK incurred in defending the Kincades in that action. See S. Cal. Gas Co. v. Ventura Pipe Line Const. Co., 150 Cal.App. 2d 253, 257 (1957) (noting that it is “well settled” that “an indemnitee cannot recover beyond the terms of the indemnity contract, and that a voluntary payment made by the indemnitee, without regard to its legal liability, is not recoverable thereunder”) (citation omitted).

To the extent that Comerica believes that AGK also seeks recovery for fees it incurred in providing a defense to Mr. Murphy and/or Kinetic Partners in the Kincade Action, that belief is mistaken. (See Doc. No. 116 at 11). At trial, attorney Gorry testified that the Kincade Action was filed against AGK, the Sierra de Montserrat HOA, and the Kincades. (See Doc. No. 103 at 59:6-9.) He further testified that AGK provided a defense for itself and the Kincades, whereas the HOA “had their own counsel.” (Doc. No. 103 at 61:12-13.) Thus, there is no indication that AGK seeks indemnification for legal fees and costs incurred in defending any party other than itself and the Kincades with respect to the Kincade Action.

c. Whether the Murphy Action falls within scope offinal ADR

As described above, the Murphy Action pertained to Westwood's attempt to exercise his rights as declarant under the Supplemental Declaration and buy back certain lots at Sierra de Montserrat. (See Doc. No. 103 at 68:18-25; JX-37 at 1-2; see also Doc. Nos. 118, 142.) The Supplemental Declaration was dated October 27, 2009 and provided that Westwood, as declarant, had the right to repurchase certain unbuilt lots in the development if they were not built on within three years of the declarant transferring those rights to another person or entity. (See Doc. No. 37 at 1-2.) Comerica foreclosed on the 51 lots at Sierra de Montserrat on November 6, 2009. (Doc. No. 84 at 2.) On November 9, 2012, just over three years after Comerica foreclosed upon the 51 lots, Westwood notified AGK that it intended to repurchase certain lots at a reduced price pursuant to the Supplemental Declaration. (See JX-15.) AGK responded to Westwood stating that

Westwood's belief that it may repurchase these 10 lots at a price significantly less than market value appears to be based on
Westwood's claim that it is the “Declarant” of the Development, and as the Declarant, Westwood has repurchase rights under a Supplemental Declaration .... [AGK] is the Development's Declarant. As you know, Comerica Bank foreclosed on Westwood's interest in the vast majority of the Development, later selling the lots to AGK. . . . Upon foreclosure, Comerica became the Development's Declarant, and Comerica Bank then transferred its rights as Declarant to AGK through an unambiguous written Assignment of Declarant Rights, which was recorded on June 30, 2010. . . . Second, the Supplemental Declaration through which Westwood purports to exercise rights to repurchase the lots is no longer valid, if it ever was. Comerica Bank rescinded the Supplemental Declaration through a Rescission of Declaration of Restrictions, recorded on June 30, 2010 . . . [which] extinguished any repurchase rights created by the Supplemental Declaration.
(JX-16 at 1-2.)

Subsequently, on January 25, 2013, Westwood filed a complaint against AGK, Colliers International, Mr. Murphy, and Mr. Chamberlain in the Placer County Superior Court. (See JX-118 at 1.) Because the Kincade Action was ongoing at that time, the Murphy Action was stayed pending resolution of the Kincade Action. (See Doc. No. 104 at 22:8-18; see also Doc. No 100 at 96:14-16.) On February 3, 2017, Westwood filed a fourth amended complaint in the Murphy Action, which became the operative complaint. (See JX-142; Doc. No. 103 at 69:16-24.) Therein, Westwood asserted claims against AGK, Mr. Murphy, AGRE, Kinetic Homes, and Kinetic Partners, Inc. (an entity controlled by Mr. Murphy), and FATCO. (See JX-142 at 1; Doc. No. 104 at 24:19-22.) Eventually, the case proceeded to a bifurcated bench trial in the Placer County Superior Court, in which the court found that Westwood's claims against AGRE and AGK were barred by the doctrine of res judicata because Westwood's claims in the Murphy Action “seek[] to vindicate the same primary right [that was] at issue” in the Kincade Action, where a final judgment on the merits had been issued. (See JX-144 at 2, 9-10, 32; see also Doc. No. 104 at 26:3-18.) The court in the Murphy Action also found that there was “insufficient evidence at [that] time” for the court to determine that the doctrine of res judicata applied to Mr. Murphy, Kinetic Homes, and Kinetic Partners, Inc., and the action continued as to those defendants until they settled with Westwood “shortly thereafter.” (See JX-144 at 32; Doc. No. 104 at 35:22-36:1.)

At trial, attorney Gorry testified that he could not recall whether the Murphy Action was stayed pending an outcome only on the first phase of the Kincade Action arbitration or if it was stayed pending a final ruling in the Kincade Action arbitration, but he believed that it was the latter. (See Doc. No. 104 at 22:8-13.)

i. Whether the Murphy Action arose out of Comerica's position as declarant

Comerica once again argues that the claims in the Murphy Action did not arise out of Comerica's position as declarant because those claims instead arose out of “AGK's affirmative conduct” of “attempting] to exercise its purported rights as the Declarant.” (See Doc. No. 89 at 22-23.) The court finds this argument unavailing for the same reasons the court rejected it when made by Comerica with regard to the Kincade Action. In short, any attempt by AGK to exercise its declarant rights arises out of Comerica's status as declarant because AGK's ability to validly do so depends entirely on whether Comerica actually held the position of declarant when it transferred those rights to AGK.

Moreover, the allegations in Westwood's fourth amended complaint make clear that the dispute arose out of Comerica's status as declarant. Therein, Westwood quoted the mission critical email, noting that AGK required that the PSA “be modified such that the bank would record an assignment of declarant rights to [AGK] to at least create an additional hurdle for Westwood to clear.” (JX-142 at 10; see also JX-38 at 3.) Westwood described the final ADR as “an obstacle maliciously intended to unlawfully obstruct [Westwood] from exercising its lawful rights as Declarant” and further alleged that “Comerica was not the Declarant [and] did not have authority to transfer such rights.” (JX-142 at 10.) In light of these allegations, it is apparent that the claims brought in the Murphy Action arose out of Comerica's position as declarant.

The court's finding in this regard is also compelled by the fact that Comerica's purported status as declarant was precisely why Comerica asserted that it had the authority to revoke the Supplemental Declaration pursuant to the final RDR. The sole sentence of the final RDR states the Comerica, “as declarant, herby rescinds, cancels, and revokes” the Supplemental Declaration. (JX-103 at 1) (emphasis added). Likewise, as the court found above, when Ms. Tresler questioned how Comerica had “the authority” to sign a revocation of the Supplemental Declaration, the issue was resolved when FATCO determined it felt “comfortable enough” to “take the position that Comerica is the declarant” and to record the final RDR. (See JX-45 at 1-3; Doc. No. 101 at 36:1-7.) Thus, there is little question that the Murphy Action-in which Westwood sought to exercise his rights as declarant pursuant to the Supplemental Declaration- arose out of Comerica's position as declarant, because Comerica's status as declarant was the precise authority Comerica purported to wield in order to transfer the declarant rights to AGK and rescind Westwood's rights under the Supplemental Declaration.

ii. Impact of the date phrase on this analysis

The court next considers whether the phrase that is modified by the date phrase bears any impact on the court's conclusion that the Murphy Action falls within the scope of the indemnity paragraph.

As noted above, if the date phrase were to modify the declarant phrase, the indemnity paragraph would cover claims arising out of Comerica's position as declarant on or before June 29, 2010. Because the Murphy Action arose out of Comerica's position as declarant, and Comerica was the declarant on or before June 29, 2010, this reading of the indemnity paragraph would clearly include the Murphy Action within its scope.

Conversely, if the date phrase were to modify the existence phrase, the indemnity paragraph would cover any and all loss, liability, claims or causes of action existing in favor of or asserted by any party on or before June 29, 2010. Comerica asserts that under this interpretation, the Murphy Action would not fall within the protection of the final ADR's indemnity paragraph.

Comerica advances the unpersuasive argument that Westwood's claims in the Murphy Action were not existing in favor of, nor asserted by, any party on or before June 29, 2010 because Westwood “first invoked its purported right to repurchase lots from AGK under the Supplemental Declaration on November 9, 2012” and did not file its complaint in the Murphy Action until January 25, 2013. (See Doc. No. 89 at 22; see also Doc. No. 116 at 8.) The court rejects this argument for the same reasons it has rejected Comerica's argument that the claims in the Kincade Action did not exist on or before June 29, 2010. The central claim of the Murphy Action was that Westwood was the declarant-not Comerica and not AGK thereafter-and as a result, Westwood's declarant rights pursuant to the Supplemental Declaration had not been extinguished. This dispute existed at the time the final ADR was executed and could have been adjudicated through an action for declaratory relief brought at that time. That Westwood delayed litigating this dispute until after AGK rejected Westwood's request to repurchase certain lots is immaterial. As described at length above, it is clear that the final ADR was intended to apply to later filed lawsuits such as the Murphy Action.

Therefore, the court concludes that, regardless of whether the date phrase is read to modify the declarant phrase or the existence phrase, the Murphy Action falls within the scope of the final ADR, and Comerica must indemnify AGK for the attorneys' fees and litigation costs AGK incurred in defending itself in that action. The next question is whether Comerica must also pay for the attorneys' fees and litigation costs that AGK incurred in defending third parties Mr. Murphy, Kinetic Homes, and Kinetic Partners, Inc. in the Murphy Action.

Comerica does not assert that AGK ever provided Mr. Chamberlain or Colliers International with a defense in the Murphy Action.

iii. Whether Comerica must indemnify AGK for its defense of Mr. Murphy, Kinetic Homes, and Kinetic Partners, Inc. in the Murphy Action

As a preliminary matter, the court notes that the parties do not appear to dispute that it was appropriate for AGK's legal defense to include a defense of AGRE, which Westwood alleged was an alter ego of AGK. (See Doc. Nos. 105 at 142:5-12; 116 at 11-12; see also JX-144 at 28.) Indeed, Comerica acknowledged that the court in the Murphy Action found that, as alleged by Westwood, there was sufficient privity between AGK and AGRE for the claims against both parties to be barred by the doctrine of res judicata, despite AGRE having not been a party to the Kincade Action. (See Doc. Nos. 104 at 25:4-26:18; 89 at 19; see also JX-144 at 26-29, 32.) In addition, up until closing, when AGRE assigned its interests in the Sierra de Montserrat sale to AGK, all of the deal documents in the transaction were executed between AGRE and Comerica, AGRE assigned its interests in the Sierra de Montserrat sale to AGK, the final ADR lists various AGRE-owned entities as comprising AGK, and the signatories for both AGRE and AGK were identical. (See, e.g., JX-27 at 1, 25; JX-43 at 7-9; JX-100 at 1, 3; JX-51 at 2.) Therefore, AGK's provision of a defense to AGRE in the Murphy Action clearly falls within the scope of the final ADR.

In its post-trial brief, Comerica appears to attempt to challenge the notion that AGK paid for AGRE's legal fees by devoting half of one sentence to the statement that “AGRE paid half of the remaining legal fees” in the Murphy Action after the parties deducted portions of those fees that were payable by Mr. Murphy. (Doc. No. 116 at 21.) In support of this contention, Comerica cites a brief portion of attorney Gorry's trial testimony on this subject. (See id.; Doc. No. 104 at 31:16-32:17.) At trial, attorney Gorry testified that Mr. Murphy paid 5% of the attorneys' fees in the Murphy Action, with AGK paying the other 95% of attorneys' fees. (Doc. No. 104 at 32:2433:2.) For the purposes of submitting a motion for attorneys' fees in the Murphy Action, the parties apportioned half of the remaining 95% of attorneys' fees to AGRE and half to AGK, merely “for the purposes of the [Murphy] court's determination as to fees between the two . . . entities, because they were both being represented under the [same] umbrella.” (Id. at 33:3-10.) Thus, there is no indication that any entity other than AGK actually paid the remaining 95% of the legal fees in that action, and Comerica's brief reference to the possibility that AGRE contributed to the payments of legal fees in that action does not amount to disputing whether it was proper for AGK to pay for legal fees incurred on AGRE's behalf.

However, the final ADR does not mention or reference Mr. Murphy, Kinetic Homes, or Kinetic Partners, Inc., and there is no evidence before the court suggesting that AGK had any legal obligation to tender a defense to these parties. Nor does AGK submit any authority in support of its contention that Comerica is obligated under the final ADR to indemnify AGK against fees and costs it incurred in defending Mr. Murphy, Kinetic Homes, or Kinetic Partners. Although Mr. Murphy testified that he was the “primary point person” directing the Westwood litigation on behalf of AGK “as the manager of the property,” AGK has also cited no authority in support of the contention that Mr. Murphy's managerial role in AGK brings him and the entities he owns under the protection of the indemnity paragraph of the final ADR. (See Doc. No. 102 at 75:6-12.)

Accordingly, the court concludes that AGK has failed to meet its burden to prove that it is entitled to indemnification for any fees and costs incurred in providing a defense to Mr. Murphy, Kinetic Homes, and Kinetic Partners, Inc. in the Murphy Action. See S. Calif. Gas Co., 150 Cal.App. 2d at 257.

iv. Whether Comerica must pay AGK for the fees and costs FATCO incurred in defending AGK in the Murphy Action

As the court has described above, FATCO appointed the Steyer Lowenthal firm to defend AGK in the Murphy Action against claims that FATCO deemed were covered by AGK's title insurance. (See Doc. No. 103 at 73:22-25.) AGK seeks indemnification for these fees, which were paid by FATCO, apparently based on an unpled subrogation theory. (See Doc. No. 110 at 18.) In its closing arguments at the trial of this case, AGK argued that FATCO “retains subrogation rights, and a recovery of fees for [FATCO] will be paid on a pro rata basis under those subrogation rights to [FATCO].” (Doc. No. 105 at 107:1-5.) Comerica disputes that these expenses are recoverable in this action because AGK has “produced no evidence that [FATCO] assigned its subrogation rights to AGK” and “did not plead or establish any proof of the elements of an assigned cause of action for subrogation.” (Doc. No. 116 at 21.)

“Subrogation is defined as the substitution of another person in the place of the creditor or claimant to whose rights he or she succeeds in relation to the debt or claim.” Fireman's Fund Ins. Co. v. Maryland Gas Co., 65 Cal.App.4th 1279, 1291 (1998). In the insurance context, “subrogation takes the form of an insurer's right to be put in the position of the insured in order to pursue recovery from third parties legally responsible to the insured for a loss which the insurer has both insured and paid.” Id. (citations omitted). An insurer entitled to subrogation, or subrogee, is “in the same position as an assignee of the insured's claim, and succeeds only to the rights of the insured,” the subrogor. Valley Forge Ins. Co. v. Zurich Am. Ins. Co., No. 4:09-cv-02007-SBA, 2010 WL 3769378, at *6-7 (N.D. Cal. Sept. 22, 2010).

In this case, because FATCO paid legal fees to Steyer Lowenthal on AGK's behalf, FATCO would be the subrogee. See id. An insurer's cause of action for equitable subrogation includes several elements, including that “the insured suffered a loss for which the defendant is liable[;] . . . the insurer has compensated the insured in whole or in part for the same loss for which the defendant is primarily liable; . . . [and] the insurer has paid the claim of its insured to protect its own interest and not as a volunteer . . . .” Fireman's Fund Ins. Co., 65 Cal.App.4th at 1292 (emphasis added). In order for AGK to recover FATCO's legal fees here under a theory of equitable subrogation, AGK would have needed to plead and prove not only a cause of action for equitable subrogation, but also that FATCO had assigned AGK its subrogation rights. See id.; (see also Doc. No. 116 at 21.) AGK has not done so and thus may not recover in this action for expenses FATCO incurred and paid in the Murphy Action under a subrogation theory.

In addition, the court is not persuaded by AGK's argument that “an insured may bring a suit for damages in its own name, even where an insurer has paid funds on the insured's behalf,” because the cases it cites in support of this contention are inapplicable here. This is because AGK seeks to recover certain fees that have already been paid in their entirety by an insurer. (See Doc. No. 110 at 18); see also Hausman v. Farmers Ins. Exch., 213 Cal.App. 2d 611, 613 (1963) (noting that where an insurer only pays for part of a loss, both the insurer-subrogee and the insured-subrogor will have claims against the liable party) (citation omitted); Patent Scaffolding Co. v. William Simpson Const. Co., 256 Cal.App. 2d 506, 514 (1967) (holding that “[w]here two parties are contractually bound by independent contracts to indemnify the same person for the same loss, the payment by one of them . . . does not create in him equities superior to the nonpaying indemnitor, justifying subrogation, if the latter did not cause or participate in causing the loss”). AGK is essentially seeking application of the collateral source rule, which provides that an injured party who receives compensation for her losses from a collateral source independent of the tortfeasor may still recover damages from the tortfeasor. But that rule “has not been generally applied in cases founded upon breach of contract, unless the ‘breach has a tortious or willful flavor.'” Patent Scaffolding Co., 256 Cal.App. 2d at 510-511 (quoting City of Salinas v. Souza & McCue Const. Co., 66 Cal. 2d 217, 226-27 (1967)); Bramalea Cal., Inc. v. Reliable Interiors, Inc., 119 Cal.App.4th 468, 472 (2004) (barring the recovery of attorneys' fees pursuant to an indemnity agreement where such fees had already been paid by the insurer and holding that collateral source rule did not apply because “the collateral source rule applies to tort damages, not to damages for breach of contract”); see also Travelers Cas. and Sur. Co. of Am. v. Dunmore, No. 2:07-cv-02493-LKK-DAD, 2010 WL 5200940, at *8 (E.D. Cal. Dec. 15, 2010) (“It is a basic rule of California law that ‘conduct amounting to a breach of contract becomes tortious only when it also violates a duty independent of the contract arising from principles of tort law.'”) (quoting Erlich v. Menezes, 21 Cal.4th 543, 551 (1999)). Moreover, another element of an equitable subrogation cause of action suggests that an insured may not recover against a defendant where it has already been compensated for its loss by its insurer. See Fireman's Fund Ins. Co., 65 Cal.App.4th at 1292 (stating one of the elements of an equitable subrogation claim as “the insured has an existing, assignable cause of action against the defendant which the insured could have asserted for its own benefit had it not been compensated for its loss by the insurer”).

Thus, AGK has fallen well short here of proving that Comerica is obligated to pay AGK for expenses and attorney fees that have been fully paid by AGK's title insurer, FATCO. See Bramalea Cal., Inc., 119 Cal.App.4th at 472-73.

d. Whether the present action falls within scope of the final ADR

AGK asserts that it is entitled to recover the costs of litigating against Comerica in the action between the parties in this court because such costs were a “necessary consequence of Comerica's refusal to provide indemnification as monetary damages.” (Doc. No. 110 at 18.)

The Ninth Circuit has interpreted California caselaw as holding that “costs and attorney's fees for prosecuting an indemnification claim may be included in the indemnification award.” DeWitt v. W. Pac. R.R. Co., 719 F.2d 1448, 1453 (9th Cir. 1983) (acknowledging a split in California authority on the subject). Nearly a decade after deciding DeWitt, the Ninth Circuit was asked to “reevaluate” its holding in DeWitt in light of an intermediate California appellate court decision issued after DeWitt. See Jones Hamilton Co. v. Beazer Materials & Servs., Inc., 973 F.2d 688, 696 n.4 (9th Cir. 1992). The Ninth Circuit declined to do so, recognizing that an “intermediate appellate court decision on one side of a clear split . . . does not provide the kind of indication that our past interpretation of California law was incorrect that would cause us to revisit our holding in DeWitt.” Id.

DeWitt's interpretation of California law is ‘binding in the absence of any subsequent indication from the California courts that [the Ninth Circuit's] interpretation was incorrect.'” Id. (quoting Owen v. United States, 713 F.2d 1461, 1464 (9th Cir. 1983)). Although Comerica cites additional intermediate California appellate court decisions that decline to follow DeWitt, these opinions are merely “on one side of a clear split” and do not indicate that the Ninth Circuit's past interpretation of California law in DeWitt and Jones was incorrect. See Monolithic Power Sys., Inc. v. Taiwan Sumida Elecs., Inc., No. 4:05-cv-03522-CW, 2007 WL 1831118, at *10 (N.D. Cal. June 25, 2007) (finding that “the additional intermediate appellate cases” cited by plaintiff “do ‘not provide the kind of indication' that the Ninth Circuit's ‘past interpretation of California law was incorrect'”) (quoting Jones, 973 F.2d at 696 n.4). Because the decisions in DeWitt and Jones remain binding caselaw, the court concludes that AGK may recover the fees and costs it incurred in this action to enforce the indemnity paragraph of the final ADR. See DeWitt, 719 F.2d at 1453; Jones, 973 F.2d at 696 n.4; Monolithic Power Sys., Inc., 2007 WL 1831118, at *10 (noting that the court is “bound” to follow DeWitt and Jones “[a]bsent any ruling from the California Supreme Court or the Ninth Circuit on this issue); see also Krag v. Kaiser Found. Hosp., No. 3:89-cv-03042-TEH, 1993 WL 226108, at *6 (N.D. Cal. June 15, 1993) (holding that an indemnitee is entitled to recover its fees incurred in prosecuting its indemnity claims against an indemnitor) (citing DeWitt, 719 F.2d at 1452-53).

Because Comerica has refused to indemnify AGK for its losses and costs incurred in its defense in both the Kincade and Murphy Actions, as well as AGK's losses and costs incurred in enforcing the indemnity paragraph in this action, the court thus concludes that Comerica has breached the final ADR. See Clear Connection Corp. v. Comcast Cable Comms., 501 F.Supp.3d 886, 894 (E.D. Cal. 2020) (holding that indemnitor breached contract by not indemnifying indemnitee for costs and losses arising from third party litigation).

4. Damages

“For a breach of an obligation arising from contract, the measure of damages . . . is the amount which will compensate the party aggrieved for all the detriment proximately caused thereby, or which, in the ordinary course of things, would be likely to result therefrom.” Cal. Civ. Code § 3300. These damages are meant to “put the injured party in as good a position as [it] would have been had performance been rendered as promised.” JMR Const. Corp. v. Env't Assessment & Remediation Mgmt., 243 Cal.App.4th 571, 585 (2015) (citation omitted). An indemnitor in a breach of contract action has an “obligation . . . to make good a loss or damage [the indemnitee] has incurred.” Zalkindv. Ceradyne, Inc., 194 Cal.App.4th 1010, 1023 (2011) (citing Rossmoor, 13 Cal.3d at 628). “[A] promise of indemnity against claims, demands, or liability embraces the costs of defense against such claims, demands, or liability insofar as such costs are incurred reasonably and in good faith.” Clear Connection Corp., 501 F.Supp.3d at 894-95. That is, “costs and attorney's fees for prosecuting an indemnification claim may be included in the indemnification award.” DeWitt, 719 F.2d at 1453.

For the reasons explained above, the court concludes that Comerica must compensate AGK for the damages it incurred (i.e., attorneys' fees and costs) in defending itself in the Westwood litigation, but AGK cannot recover for the attorneys' fees and costs it incurred in defending the Kincades, Mr. Murphy, Kinetic Homes, and Kinetic Partners. The court will now turn to determining what specific amounts in damages AGK has proved at trial (fee amounts from the Kincade Action, the Murphy Action, and this action) and is thus entitled to recover from Comerica.

Because the attorneys' fees AGK seeks to recover that are part of an indemnification damages award and are not sought by way of a noticed motion for attorneys' fees filed after trial, the court need not conduct a lodestar analysis in this case. See DeWitt, 719 F.2d at 1453; Cal. Civ. Code § 2778(3) (“An indemnity against claims, or demands, or liability, . . . embraces the cost of defense against such claims, demands, or liability incurred in good faith, and in the exercise of a reasonable discretion.”); Zalkind, 194 Cal.App.4th at 1024 (describing an indemnitor's obligation to “reimburse the indemnitee for any damages the indemnitee becomes obligated to pay third persons) (emphasis added); c.f. Camacho v. Bridgeport Fin., Inc., 523 F.3d 973, 978 (9th Cir. 2008) (describing the “lodestar” method in the context of a motion for an award of costs and attorneys' fees provided for by statute). Apart from its argument that AGK is not entitled to receive a damages award for expenses it incurred on behalf of third parties, Comerica dose not otherwise challenge the reasonableness of the rates or hours underlying the attorneys' fees AGK seeks to recover as damages in this action. (See Doc. Nos. 116 at 20-21; 116-1; 116-2.) Nonetheless, the court notes that the trial exhibits of billing records admitted into evidence pertain to attorneys' fees and expenses spanning over a decade of litigation in three separate actions, encompass thousands of hours of legal work, and include reasonable hourly rates ranging from $395 for associates through $650 for partners. (See JX-108-JX-111, JX-113-JX-15; PX-3.)

a. Damages in the Kincade Action

AGK requests $1,000,311.09 in damages incurred in the Kincade Action, representing its fees and costs incurred in defending both itself and the Kincades. (See Doc. No. 110 at 12.) Through its voluminous billing records and witness testimony at trial, AGK met its burden of demonstrating that it suffered a loss of this amount in the Kincade Action. (See JX-108, 109; Doc. No. 103 at 78:8-12.) However, this amount sought also includes expenses AGK incurred due to its voluntary defense of the Kincades, which totaled $389,499 according to the request for attorneys' fees submitted by AGK in the Kincade Action. (See Doc. No. 103 at 63:18-19; JX-139 at 13-14.) Because the court concludes that AGK is not entitled to indemnification from Comerica pursuant to the final ADR with regard to its defense of the Kincades, the court will subtract $389,499 from AGK's requested damages in connection with the Kincade Action, resulting in recovery of $610,812.09.

Comerica disputes that several of the billed time entries submitted by AGK are recoverable here because, it argues, those entries were incurred on behalf of third parties. In support of this contention, Comerica attaches (in the form of an exhibit to its post-trial brief) a spreadsheet that purports to list $407,602.48 in attorney time entries from the Kincade Action that it argues were “paid or incurred on behalf of third parties who were not parties to the indemnity agreement.” (See Doc. Nos. 116 at 21; 116-1 at 1-8.) But, there is no indication that some or all of those entries reflected fees that were incurred or paid on behalf of third parties. (See, e.g., Doc. No. 116-1 at 1) (listing entry for “review correspondence from Don Murphy” among entries for which Comerica argues AGK should not be indemnified). Thus, although Comerica has attempted to identify billing entries that pertained or potentially pertained only to the Kincades, the court instead relies on the sworn declaration AGK submitted in the Kincade Action as a more reliable indicator of the attorneys' fees and costs incurred on the Kincades' behalf in that action. (See JX-139 at 13-14.) The arbitrator in that case found that the Kincades were entitled to an award of attorneys' fees and costs, but AGK was not entitled to an award of attorneys' fees and costs incurred in its own defense, because “as between AGK and Westwood there was no prevailing party.” (Id. at 13.) Because the court in this case awards damages to AGK only for the fees and costs it incurred in its own defense in the Kincade Action, AGK's fee award in this case is not duplicative of the fee award it received with respect to its defense of the Kincades in that action. In addition, when the arbitrator awarded attorneys' fees and costs for the Kincades' defense, the arbitrator reduced that award to $124,764 from the $389,499 that AGK had requested, based in part on a reduction of hourly rates to match local attorney rates. (See JX-139 at 14.) The fact that the arbitrator reduced the amount awarded for AGK's defense of the Kincades does not change the fact that AGK nonetheless incurred the full $389,499 in expenses on their behalf; in other words, AGK would have had to pay the full $389,499 in attorneys' fees and costs regardless of whether the fee award fully compensated those expenses. (See id. at 13-14.) Therefore, the court uses the $389,499 figure as a reasonable estimate of the portion of AGK's $1,000,311.09 in expenses that are attributable solely to AGK's defense of the Kincades and thus not recoverable as damages in this action. The court also notes that the $389,499 amount the court excludes from damages award here does not differ significantly from the $407,602.48 figure for which Comerica asserts AGK incurred on behalf of third parties in the Kincade Action. See also JMR Const. Corp., 243 Cal.App.4th at 585 (“Where the fact of damages is certain [in a breach of contract action]. . . the amount of damages need not be calculated with absolute certainty. The law requires only that some reasonable basis of computation be used, and the result reached can be a reasonable approximation.”).

Therefore, the court concludes that AGK has proved that it is entitled to recover $610,812.09 in damages from Comerica in connection with the Kincade Action.

b. Damages in the Murphy Action

AGK seeks $1,377,345.75 in damages incurred in the Murphy Action, representing the fees and costs it incurred in defending AGK, AGRE, Mr. Murphy, Kinetic Homes, and Kinetic Partners, Inc., as well as the fees and costs FATCO paid to Steyer Lowenthal to defend AGK against covered claims. (See Doc. No. 110 at 12.) Through its voluminous billing records and witness testimony at trial, AGK met its burden of demonstrating its attorneys' fees and costs for that action totaled this amount. (See JX-110-JX-113; Doc. No. 103 at 78:13-16.)

However, as the court has concluded above, AGK is not entitled to recover as damages the $426,372.23 in fees and costs FATCO paid Steyer Lowenthal for AGK's defense, or the fees and costs AGK incurred in its defense of Mr. Murphy, Kinetic Homes, or Kinetic Partners, Inc., for which AGK has not clearly delineated a specific amount from the remaining $950,973.52. (See JX-112; Doc. Nos. 102 at 77:9-78:5, 110 at 17, 32-33.) Nonetheless, at trial, attorney Gorry testified that at the time AGK sought and received an attorneys' fee award in the Murphy Action, AGK apportioned 5% of its fees as being the financial responsibility of Mr. Murphy. (See Doc. No. 104 at 32:16-32:2.) Therefore, the court will subtract the $47,548.68 (i.e., 5% of $950,973.52) attributable to Mr. Murphy and his entities, Kinetic Homes and Kinetic Partners, Inc., from the expenses AGK incurred in the Murphy Action. See JMR Const. Corp., 243 Cal.App.4th at 585 (“Where the fact of damages is certain . . . the amount of damages need not be calculated with absolute certainty. The law requires only that some reasonable basis of computation be used, and the result reached can be a reasonable approximation.”) (citing Acree v. Gen. Motors Acceptance Corp., 92 Cal.App.4th 385, 398 (2001)).

At trial, attorney Gorry testified that AGK's fee award in the Murphy Action has not been collected upon because “the Westwood Homes entity has no assets.” (Doc. No. 104 at 45:14-20.) Comerica does not dispute that AGK can nevertheless recover damages in this action for amounts that AGK has been unable to collect from the fee award rendered in the Murphy Action.

Comerica has submitted an exhibit analyzing attorney time entries from the Murphy Action for which it argues AGK is not entitled to recover damages. (See Doc. Nos. 116 at 21; 116-2 at 111.) Some of these entries are downward adjustments on time entries to reflect that Mr. Murphy paid 5% of invoices from the Murphy Action. (See Doc. No. 116-2 at 1-2.) The court has already accounted for these reduced amounts above. Some of the other entries Comerica lists as non-recoverable are attorney time entries that Comerica asserts were only in the defense of Mr. Murphy and his entities, because these time entries were made after the court in the Murphy Action issued its May 2, 2018 tentative order disposing of any claims against AGK and AGRE. (See, e.g. Doc. No. 116-2 at 3.) This court does not agree that the mere fact that an attorney time entry was entered after May 2, 2018 necessarily means that it pertained only to Mr. Murphy, Kinetic Homes, and Kinetic Partners, Inc. After the May 2, 2018 tentative order was issued, Westwood filed a request for statement of decision bearing on that tentative order, and the court ruled on that request on June 29, 2018. (See JX-145 at 7.) It is plausible that Westwood's filing may have implicated AGK's legal defense. Indeed, some of the entries Comerica flags include entries for attorney work on a response to Westwood's request for decision. (See Doc. No. 116-2 at 3.) The court also observes that attorney Gorry testified at trial that there may have been postjudgment proceedings as to AGK and AGRE that occurred after the May 2, 2018 tentative ruling. (Doc. No. 104 at 26:15-18.) Thus, the court finds that a 5% reduction in the attorneys' fees to account for amounts attributable to and paid by Mr. Murphy and his entities is the most reliable method of estimating AGK's damages stemming from the Murphy Action. Finally, because the court concludes above that there is no indication that AGRE actually paid 47.5% of the legal bills in the Murphy Action, and Comerica does not substantively challenge whether AGK's defense of AGRE falls within the scope of the indemnity paragraph, the court declines to consider Comerica's proposed 47.5% fee reductions to certain attorney billing entries after AGRE became a defendant in the Murphy Action. (See Doc. No. 104 at 32:24-33:10) (Attorney Gorry explaining that AGK paid 95% of the legal bills in the Murphy Action, but that the parties made an apportionment between AGRE and AGK for the Murphy court's purposes of awarding fees in that action); see also State v. Pac. Indem. Co., 63 Cal.App.4th 1535, 1549 (1998) (explaining that once plaintiff has met its burden of proving damages, the burden shifts to defendant to rebut those damages); Clear Connection Corp., 501 F.Supp.3d at 896.

Thus, the court concludes that AGK has established that it is entitled to $903,424.84 in damages in connection with the Murphy Action.

c. Damages in the Present Action

AGK seeks $1,146,337.24 in damages for the attorneys' fees and costs it has incurred in its litigation of this action to enforce Comerica's indemnity obligations. (See Doc. No. 110 at 19.) Through its voluminous billing records and witness testimony at trial, AGK has met its burden of demonstrating it incurred $1,146,337.24 in attorneys' fees and costs in this action. (JX-114-JX-15; PX-3; Doc. No. 103 at 84:8-16.) Comerica does not challenge the reasonableness of this amount and instead argues only that AGK cannot recover damages for its expenses incurred in prosecuting this case, an argument which the court has already rejected for the reasons explained above. (See Doc. No. 116 at 23.) Based on the evidence presented at trial, there is “no basis whatsoever for concluding that plaintiff is asking indemnification for services not rendered to [it] in good faith or for which [it] has not in good faith been billed.” Arenson v. Nat l Auto. & Cas. Ins. Co., 48 Cal. 2d 528, 539 (1957). Because “costs and attorney's fees for prosecuting an indemnification claim may be included in the indemnification award,” DeWitt, 719 F.2d at 1453, the court will award AGK $1,146,337.24 in damages for the fees and costs AGK incurred in the prosecution of this case.

d. Prejudgment Interest

“Prejudgment interest in a diversity action is a substantive matter governed by state law.” U.S. Fid. & Guar. Co. v. Lee. Invs. LLC, 641 F.3d 1126, 1139 (9th Cir. 2011). Under California law,

Every person who is entitled to recover damages certain, or capable of being made certain by calculation, and the right to recover which is vested in the person upon a particular day, is entitled also to recover interest thereon from that day, except where the debtor is prevented by law . . . .
Cal. Civ. Code § 3287(a). “[A] defendant's denial of liability does not make damages uncertain for purposes of [California] Civil Code section 3287.” Wisper Corp. v. Cal. Com. Bank, 49 Cal.App.4th 948, 958 (1996). Rather, the test for awarding prejudgment interest under this provision entails “a determination of whether the ‘defendant actually knows the amount owed or from reasonably available information could the defendant have computed that amount.” U.S. Fid. & Guar. Co., 641 F.3d at 1139 (quoting Children's Hosp. and Med. Ctr. v. Bonta, 97 Cal.App.4th 740, 774 (2002)). “The statute does not authorize prejudgment interest where the amount of damage, as opposed to the determination of liability, depends on a judicial determination based on conflicting evidence and is not ascertainable from truthful data supplied by the claimant to his debtor.” Fireman's Funds Ins. Co. v. Allstate Ins. Co., 234 Cal.App.3d 1154, 1173 (1991).

The court agrees with AGK that it is entitled to recover prejudgment interest with respect to its damages in the form of attorneys' fees and costs incurred in the litigation of this action. “What is critical is not whether the defendant actually knows how much it should pay; rather, it is whether the defendant could have calculated how much it should pay, if it had known how a court would ultimately rule on the legal issues.” State of California v. Cont'l Ins. Co., 15 Cal.App. 5th 1017, 1043 (2017) (emphasis in original). If Comerica knew how a court would rule on the legal issue of whether AGK's attorneys' fees and damages in enforcing the indemnity paragraph is recoverable as damages, Comerica could have readily calculated the amount of AGK's damages stemming from its action to enforce the indemnity paragraph on the date of each of AGK's billing statements in this action. Although there is no evidence before the court suggesting that AGK sent Comerica each of its legal bills as they accrued, AGK's expenses incurred in litigating this action could have been “reasonably determined . . . with simple inquiries.” U.S. Fid. & Guar. Co., 641 F.3d at 1140 (holding that the district court properly applied California law in awarding prejudgment interest where the amounts owed were “reasonably available” and “could be reasonably determined . . . with simple inquiries”). Put simply, the calculation of AGK's damages in this regard turned exclusively on resolution of the legal issue of whether AGK could recover as damages the expenses it incurred in enforcing the indemnity paragraph of the final ADR. See Westport Ins. Corp. v. Cal. Cas. Mgmt. Co., 916 F.3d 769, 782 (9th Cir. 2019) (“When the allocation of liability turns on factual issues, damages are uncertain; however, when the allocation turns exclusively on legal issues, damages are certain and interest is available.”) AGK has provided an accounting of its individual legal billing invoices in this action, the dates of those invoices, the amounts of those invoices, and the amount of interest accrued between the invoice dates and the dates of post-trial briefing calculated at ¶ 10% per annum rate. (See Doc. No. 110 at 34); see also Westport Ins. Co., 916 F.3d at 781 (noting that under California law, the prejudgment interest rate on contract actions is 10% per annum if the rate is not otherwise stipulated in the contract) (citing Cal. Civ. Code § 3289). Having reviewed these figures and calculations, the court thus concludes that AGK is entitled to $216,720.19 in prejudgment interest on its damages incurred in enforcing the final ADR by bringing this lawsuit. (See Doc. No. 110 at 34); see also Westport Ins. Co., 916 F.3d at 781 (holding that district court did not abuse its discretion in awarding prejudgment interest running from the dates plaintiff paid each of several underlying settlements); Com. & Indus. Ins. Co. v. Carter, No. 2:15-cv-02059-TLN-KJN, 2017 WL 4355045, at *4 (E.D. Cal. Oct. 2, 2017) (awarding prejudgment interest at ¶ 10% per annum rate running from dates invoices were due and payable through the filing date of plaintiff's motion for default judgment).

AGK has requested only prejudgment interest for its damages incurred from bringing this litigation through the date of post-trial briefing and only pertaining to its legal billing invoices for this action dated though September 30, 2020. (See Doc. No. 110 at 34.)

However, the court concludes that AGK is not entitled to prejudgment interest with respect to its damages stemming from the Murphy and Kincade Actions because the proper amount of those damages depended on a “judicial determination based on conflicting evidence” and was “not ascertainable from truthful data supplied by” AGK to Comerica. See id. The damages for Comerica's breach of the final ADR are comprised of some portion of the legal bills for nearly a decade's worth of litigation in which the same counsel represented multiple codefendants at different stages of that litigation, with some billing entries and costs attributable to several codefendants, including some who were not covered by the indemnity paragraph of the final ADR at issue in this case, and other billing entries for which the applicable defendants are not readily discernible. In other words, even with a full, truthful disclosure of AGK's billing records in the Westwood litigation, the proper amount of damages could not “be reasonably determined thereafter with simple inquiries.” U.S. Fid. & Guar. Co., 641 F.3d at 1140. AGK's argument that its damages were certain “on the dates that AGK became liable for those expenses” is belied by the fact that AGK truthfully divulged its Kincade Action and Murphy Action billing records to Comerica during the litigation of this case, and upon a very detailed review of those billing records, Comerica came to a different conclusion as to the billed amounts that are attributable to the parties not covered by the indemnity paragraph. (See Doc. Nos. 110 at 21-22; 116-1; 116-2.) There is no indication that Comerica's analysis of AGK's billing records was not careful or in good faith, nor is there any indication that AGK's prior declarations filed in the Kincade Action and Murphy Actions regarding the amounts of its fees that were attributable to third parties were not careful or not made in good faith. Although some of the parties' disagreement on the correct damages amount related to the question of liability-i.e., which parties were and were not covered by the indemnity paragraph-much of the difficulty in determining the correct amount of damages here relates to the question of how to allocate AGK's long, detailed, and overlapping billing entries among the different co-defendants sharing counsel in two actions spanning nearly a decade of litigation. Thus, the court concludes that it is not the case here that “once liability was determined, there could be ‘essentially no dispute between the parties concerning the basis of computation of damages.'” U.S. Fid. & Guar. Co., 641 F.3d at 1140 (quoting Fireman's Fund, 234 Cal.App.3d at 1173). The calculation of damages in this case required a judicial determination as to the fees that were appropriate to attribute to AGK's own legal defense in the Murphy and Kincade Actions. Therefore, the court finds that AGK is not entitled to an award of prejudgment interest on its damages stemming from the Westwood litigation. See Chesapeake Indus., Inc. v. Togova Enter., Inc., 149 Cal.App.3d 901, 914 (1983) (holding that prejudgment interest not appliable where there are “indicia that the sum [of damages] was not capable of calculation within the meaning of section 3287(a)”).

B. Statute of Limitations

Under California law, “[t]he ordinary statute of limitations for breach of a written contract is four years.” Vu v. Prudential Prop. & Cas. Ins. Co., 26 Cal.4th 1142, 1148 (2001) (citing Cal. Civ. Proc. § 337). A declaratory judgment action must be brought within the same period “as an action for damages or injunction on the same liability.” Howard Jarvis Taxpayers Ass 'n v. City of La Habra, 25 Cal.4th 809, 821 (2001) (citing Abbott v. City of Los Angeles, 50 Cal. 2d 438, 462-64 (1958) and Dillon v. Bd. of Pension Commrs., 18 Cal.2d 427, 429-430 (1941)).

Comerica has asserted an affirmative defense that AGK's causes of action for breach of contract and declaratory relief are barred by the applicable statute of limitations. (See Doc. No. 89 at 27.) The parties do not dispute that the statute of limitations applicable to AGK's breach of contract and declaratory relief claims is four years. (See id.; Doc. No. 110 at 23.) Rather, Comerica argues that AGK's claims are time-barred because AGK “became liable for attorneys' fees no later than April 18, 2011, when its counsel provided a written response to [Westwood's] ‘Request for Resolution,'” but AGK did not file the instant action until April 30, 2015, more than four years later. (Doc. No. 89 at 27.) Comerica thus appears to assume that the AGK's breach of contract claim accrued when AGK incurred its first legal bill in connection with the Westwood litigation.

Comerica is incorrect in this regard. “A cause of action for breach of contract does not accrue before the time of breach.” Romano v. RockwellInt'l, 14 Cal.App.4th 479 (1996); see also Taylor v. Johnston, 15 Cal.3d 130, 137 (1975) (“There can be no actual breach of a contract until the time specified therein for performance has arrived.”). In this case, AGK's causes of action did not accrue until April 24, 2015, the day that Comerica breached the final ADR by refusing to indemnify AGK. (See JX-106); see also Fox v. Ethicon Endo-Surgery, Inc., 35 Cal.4th 797, 806 (2005) (noting that “statutes of limitation do not begin to run until a cause of action accrues” and that ‘[g]enerally speaking, a cause of action accrues at ‘the time when the cause of action is complete with all of its elements'”) (quoting Norgart v. Upjohn Co., 21 Cal.4th 383, 397 (1999). AGK timely filed the instant action four days later, on April 29, 2015, well within the four-year statute of limitations period applicable in this case. (See Doc. No. 1 at 5.) Therefore, the court concludes that Comerica has not proved that AGK's claims in this case are barred by the applicable statute of limitations.

Even assuming that Comerica was correct that AGK's breach of contract claim accrued when AGK incurred its first legal bill in connection with the Westwood litigation, the evidence before the court indicates that AGK's first legal bill in connection with the Kincade Action is dated June 13, 2011. (See JX-108 at 1.) Thus, even applying Comerica's reasoning, AGK brought this action within the applicable four-year statute of limitations.

C. Declaratory Relief

AGK brings its state law declaratory relief claim pursuant to California Code of Civil Procedure § 1060 and seeks a declaration from this court regarding the parties' “respective rights and obligations” under the indemnity paragraph of the final ADR. (See Doc. Nos. 1 at 9; 86 at 14.)

AGK does not seek declaratory relief pursuant to the federal Declaratory Judgment Act, which provides that that “[i]n a case of actual controversy within its jurisdiction . . . any court of the United States . . . may declare the rights and other legal relations of any interested party seeking such declaration . . . .” 28 U.S.C. § 2201(a) (emphasis added).

“The purpose of declaratory relief is ‘to set controversies at rest before they lead to the repudiation of obligations, invasion of rights or commission of wrongs.'” Env't Def. Project of Sierra Cnty. v. County of Sierra, 158 Cal.App.4th 877 (2008) (quoting Travers v. Louden, 254 Cal.App. 2d 926, 931 (1967)). “[T]he remedy is to be used to in the interests of preventative justice, to declare rights rather than execute them.” Travers, 254 Cal.App. 2d at 931. To this end, California Code of Civil Procedure § 1060 provides that “[a]ny person interested under a . . . contract . . . who desires a declaration of his or her rights or duties with respect to another, . . . may, in cases of actual controversy relating to the legal rights and duties of the respective parties” bring an action “for a declaration of his or her rights and duties.” To qualify for declaratory relief, a plaintiff must demonstrate that its action presents “two essential elements: ‘(1) a proper subject of declaratory relief, and (2) an actual controversy involving justiciable questions relating to [plaintiff's] rights or obligations.'” Wilson & Wilson v. City Council of Redwood City, 191 Cal.App.4th 1559, 1582 (2011). With respect to the second of these elements, “[t]he ‘actual controversy' language in [California] Code of Civil Procedure section 1060 encompasses a probable future controversy relating to the legal rights and duties of the parties.” Env't Def. Project of Sierra Cnty., 158 Cal.App.4th at 885. “It does not embrace controversies that are ‘conjectural, anticipated to occur in the future, or an attempt to obtain an advisory opinion from the court.'” Wilson & Wilson, 191 Cal.App.4th at 1582 (quoting Brownfield v. Daniel Freeman Marina Hosp., 208 Cal.App.3d 405, 410 (1989)). Rather, in order “[f]or a probable future controversy to constitute an ‘actual controversy,' . . . the probable future controversy must be ripe.” Env'tDef. Project of Sierra Cnty., 158 Cal.App.4th at 885. If an “actual controversy” exists, “it is within the trial court's discretion to grant or deny declaratory relief.” Id.

Even assuming, without deciding, that AGK has proved that its claim is a proper subject of declaratory relief, AGK has nonetheless failed to meet its burden to prove the second essential element of its declaratory relief claim. AGK argues that it satisfies the actual controversy requirement because “there remains ongoing litigation and the threat of future litigation by Westwood.” (See Doc. No. 86 at 14.) With respect to ongoing litigation with Westwood, AGK asserts that the Murphy Action is not yet complete, citing attorney Gorry's trial testimony that an appeal in the Murphy Action was recently resolved in AGK's favor and he had received notice of a substitution of attorney in that action the previous day. (See Doc. Nos. 111 at 24; 104 at 34:2335:7.) A post-appeal substitution of attorney in the Murphy Action does not, however, give this court a basis on which to conclude that the Murphy Action continues to be an actual controversy as to which declaratory judgment is appropriate or even helpful. This is particularly the case in light of the court's conclusion that AGK is entitled to indemnification for certain expenses it incurred in the Murphy Action and the parties' ability to apply the court's analysis herein to any future fees incurred. There was simply not enough evidence presented at the trial of this action regarding the nature of the potentially ongoing proceedings in the Murphy Action for the court to conclude that these proceedings constitute a “controversy relating to the legal rights and duties of the parties.” Env't Def. Project of Sierra Cnty., 158 Cal.App.4th at 885.

Similarly, to the extent AGK argues that “there is an undeniable dispute between the parties concerning Comerica's indemnity obligations under the [final ADR] and the construction and validity of that indemnity provision,” that dispute pertained to Comerica's obligations regarding the Kincade Action and Murphy Action. That dispute has been resolved by the court's conclusions of law with respect to AGK's breach of contract claim in this action. Thus, the court concludes that there remains no actual controversy in this action for which the elements of declaratory relief are met. See Burke v. City and County of San Francisco, 258 Cal.App. 2d 32, 34 (1968) (explaining that declaratory relief not available “to determine a matter which is or has become moot”).

AGK's arguments regarding the prospect of litigation with Westwood in other future actions are similarly unavailing. In its closing argument at trial, AGK asserted that Mr. Westwood had attended some of the trial and that “[t]he likelihood of litigation for Mr. Westwood is still real and present.” (Doc. No. 105 at 108:7-10.) As Comerica persuasively argues, however, even if “AGK might reasonably] believe that there might be future litigation between Westwood and AGK, AGK has not identified the specific subject matter of such potential future litigation,” and without further information regarding the nature of Westwood's potential future claims or causes of action, this court “cannot properly provide any declaration of AGK's right to be indemnified from and against such unknown claims and causes of action.” (See Doc. No. 116 at 20.) A declaration from the court in this case would “require [the] court to speculate about unpredictable future events in order to evaluate the parties' claims.” PG&E Corp. v. Pub. Utils. Com., 118 Cal.App.4th 1174, 1217 (2004); see also Wilson & Wilson, 191 Cal.App.4th at 1582-83 (explaining that an issue is not ripe for judicial resolution if “the abstract posture of [the] proceeding makes it difficult to evaluate the issues” or “if the court is asked to speculate on the resolution of hypothetical situations”) (citation omitted). The mere potential for a future action between AGK and Westwood does not give rise to a justiciable controversy. If Westwood does sue AGK again at some point in the future, and if AGK believes that it is entitled to indemnification from Comerica for its defense in that future action, and Comerica refuses to indemnify AGK, AGK may challenge Comerica's actions at that time. In the absence of a ripe controversy, AGK has failed to prove the necessary elements of its declaratory relief claim. Accordingly, the court thus will dismiss AGK's declaratory relief claim as nonjusticiable. See id. at 1585 (holding that trial court abused discretion in granting declaratory relief because such relief pertained to an uncertain future controversy that was not ripe and thus was nonjusticiable).

CONCLUSION

Pursuant to the above findings of fact and conclusions of law, the court determines that Comerica breached its contract with AGK, and judgment will be entered in favor of AGK on its breach of contract claim. The court awards AGK $2,660,574.17 in damages (comprised of $610,812.09, $903,424.84, and $1,146,337.24 in damages incurred in connection with the Kincade Action, the Murphy Action, and this case, respectively); and $216,720.19 in prejudgment interest. AGK's claim for declaratory relief is dismissed. This order constitutes the findings and conclusions required by Rule 52(a) of the Federal Rules of Civil Procedure.

In accordance with Federal Rule of Civil Procedure 58(b), the Clerk of the Court is directed to enter judgment in favor of plaintiff AGK Sierra de Montserrat, L.P. in the total amount of $2,877,294.36 with respect to its breach of contract claim brought under California law. The Clerk of the Court is also directed to close this case.

IT IS SO ORDERED.


Summaries of

AGK Sierra de Montserrat v. Comerica Bank

United States District Court, Eastern District of California
Jan 27, 2023
2:15-cv-01280-DAD-DB (E.D. Cal. Jan. 27, 2023)
Case details for

AGK Sierra de Montserrat v. Comerica Bank

Case Details

Full title:AGK SIERRA de MONTSERRAT, L.P., Plaintiff, v. COMERICA BANK, Defendant.

Court:United States District Court, Eastern District of California

Date published: Jan 27, 2023

Citations

2:15-cv-01280-DAD-DB (E.D. Cal. Jan. 27, 2023)

Citing Cases

Lansdown v. Bayview Loan Servicing, LLC

Under California law, “[t]he ordinary statute of limitations for breach of a written contract is four…

Harper v. Gen. Motors

Certainly, under California law, a party may rescind a contract that was formed “if that party's consent was…